Farmland India
Farm fields and low rocky hills near Chevella in Ranga Reddy district, Telangana

Area guide

Buying Land in Shankarpalli–Chevella

Farmland on the Hyderabad–Bijapur highway in Ranga Reddy: highway widening, the G.O. 111 history, HMDA rules and the checks that matter.

  • New Year 2027

    Highway target

  • 84

    G.O. 111 villages

  • 694.3 mm

    Rainfall (district)

  • 7.5%

    Sale deed charges

Micro-market record — Shankarpalli–Chevella

Rev. 2026 · Farmland India desk

District

Ranga Reddy (Chevella and Shankarpalle mandals, Chevella revenue division)

Corridor

Hyderabad–Bijapur highway between Moinabad and Chevella, west of the city

Catchment

Part of the older Himayatsagar and Osmansagar catchment; GO 111 was reported scrapped in May 2023

Terrain

Red and black soils; dubba soils are mostly in other Ranga Reddy mandals

Groundwater

Telangana extraction is 45.91% (CGWB 2024)

Estimated land price*

No dated, named per-acre source found, so no band is shown

Sub-area overview

Shankarpalli–Chevella — farmland and weekend plots on the Hyderabad–Bijapur highway

Shankarpalle and Chevella lie west and south-west of Hyderabad, in the Chevella revenue division of Ranga Reddy district, which the district profile lists with Moinabad, Shahbad, Manchal, Yacharam and Saroornagar (iPASS district profile[4]). The belt follows the Hyderabad–Bijapur highway, a two-lane road about seven metres wide that is being four-laned, and the land on both sides is mostly farmland with weekend plots and farmhouse-style sales.

Two things set this belt apart from the rest of Ranga Reddy. First, the older G.O. 111 limited construction in the 84 villages around the Himayatsagar and Osmansagar reservoirs, and the Telangana Cabinet decided to scrap it in May 2023 (Deccan Chronicle, 18 May 2023[9]). Second, the highway widening is a live project whose delays and accident record affect how buyers rate the road. Neither question is settled for an individual village by a news report, so the survey number has to be checked.

Chevella and Shankarpalle sit outside the seven Future City mandals, although Manchal and Yacharam next door are inside them; see Kandukur–Maheshwaram. Read the Ranga Reddy district page for the district rules, then browse land for sale in Ranga Reddy.

  • Bijapur highway
  • Catchment history
  • Weekend plots
  • Outside FCDA list
  • NRI barred
Locator map poster of Ranga Reddy district, Telangana, showing the Chevella and Shankarpalle belt west of Hyderabad

Connectivity

How Shankarpalli–Chevella connects

The belt follows the Hyderabad–Bijapur highway, which is being four-laned. Distances are not route-checked.

By road, rail and air

HighwayHyderabad–Bijapur highway, running through Moinabad, Chevella and Manneguda to Vikarabad; the existing road is two-lane (Deccan Chronicle, 21 Nov 2025[8]).
WideningFour-laning is under way; the Chief Minister asked on 21 Nov 2025 for completion within a year, to open by New Year 2027.
Outer Ring RoadThe ORR is the edge of the core zone; this belt lies beyond it in the outer part of the region. Which exit serves a given village should be checked on the ground.
Rail and airportRajiv Gandhi International Airport at Shamshabad is in the same district.

The highway is the story, and it is unfinished

The road was described as one of the most accident-prone in the state after a crash near Mirzaguda in Chevella on 3 November 2025 killed 19 people. Completion is a target, not a date you can price against. Check whether the survey number falls inside the widening corridor before you buy.

Growth catalysts

Upcoming infrastructure & developments

Status labels maintained by the Farmland India research desk. Government-announced timelines are not guaranteed.

01Highway

Under construction

03Catalysts

Under construction · target New Year 2027Hyderabad–Bijapur highway four-laning
Reported · cabinet decision May 2023G.O. 111 scrapped
Notified · master-plan roadRegional Ring Road in the HMDA plan
Under construction · target New Year 2027

Hyderabad–Bijapur highway four-laning

The road is being widened from two lanes to four between Moinabad and Vikarabad via Chevella. Of 915 banyan trees on the stretch, 765 are to be kept and 150 relocated by realigning the highway, a settlement under which activists withdrew their NGT petitions (Deccan Chronicle, 21 Nov 2025[8]). The article does not give length or cost.

Source: Deccan Chronicle, 21 Nov 2025

Existing road

Two-lane, about 7 m

Target

Open by New Year 2027

Trees retained

765 of 915

Land markets in the corridor

  • Chevella
  • Moinabad
  • Manneguda
Reported · cabinet decision May 2023

G.O. 111 scrapped

G.O. 111, issued in 1996, barred major construction and industry within 10 km of the full tank level of Himayatsagar and Osmansagar. It covered 84 villages in seven mandals, about 1.32 lakh acres. The Telangana Cabinet decided in May 2023 to scrap it fully, after G.O. 69 of April 2022 had already lifted the limits, and said HMDA construction rules would apply (Deccan Chronicle, 18 May 2023[9]). A public-interest petition against G.O. 69 was filed in the High Court.

Source: Deccan Chronicle, 18 May 2023

Villages

84 in 7 mandals

Area

About 1.32 lakh acres

Later rule

HMDA construction rules

Land markets in the corridor

  • Chevella
  • Shankarpalle
  • Moinabad
Notified · master-plan road

Regional Ring Road in the HMDA plan

HMDA’s G.O.Ms.No.19 of 19 January 2026 adds the 100 m Regional Ring Road alignment, north and south, to the Hyderabad Metropolitan Region plan as a master-plan road. The region beyond the 2031 master plan has no master plan yet (HMDA G.O.Ms.No.19[7]). Check the alignment map for each village.

Source: HMDA G.O.Ms.No.19, 19 Jan 2026

Road width

100 m

Plan beyond 2031

No master plan yet

Status

Notified in plan

Land markets in the corridor

  • Check the alignment map village by village

Agriculture & terrain

Soil, crops & water in Shankarpalli–Chevella

Red and black soils, tank and borewell water, and a groundwater category still to be confirmed.

Soil and crops

Red soils dominate Ranga Reddy, followed by black soils. Principal crops are paddy, jowar, maize, cotton, castor, pulses and vegetables, with mango, grape, guava and pomegranate among the orchard crops (iPASS profile[4]). Figures are for the whole district; none is given for Chevella or Shankarpalle.

  • Paddy
  • Maize
  • Cotton
  • Pulses and vegetables

Water

Normal annual rainfall is 694.3 mm, and the district has 114 minor-irrigation tanks and 1,200 panchayat tanks. Telangana’s groundwater extraction was 45.91% in 2024 (CGWB 2024[6]). Ask for the mandal table and the borewell history.

Price reference

Market values were revised across all 144 sub-registrar offices from 5 June 2026 (Telangana Today, 3 Jun 2026[10]). There is no dated newspaper or official per-acre figure for Chevella or Shankarpalle. Use the government value for the survey number and registered deeds from the same village.

Farm plot with red soil and low hills on the Chevella side of Ranga Reddy district, Telangana

Micro-market report — Shankarpalli–Chevella

Farmland India view

Why buyers look at Shankarpalli–Chevella

Reasons buyers look at this micro-market, stated with the evidence and the caveat.

A highway with a deadline

Four-laning to open by New Year 2027 would turn a slow two-lane road into a proper link to the city, which is the main reason buyers look at Chevella.

A clearer rulebook near the reservoirs

The Cabinet’s decision to scrap G.O. 111 replaced a blanket limit with HMDA construction rules, so layout and farmhouse approvals now follow the planning authority.

Room beyond the Future City belt

The seven FCDA mandals sit next door, but Chevella and Shankarpalle are not on that list, so parcels here are not tied to the Future City plan.

Weekend use, not quick resale

Distance from the ORR and the unfinished road make this a hold-and-use market. Plan for five years, not five months.

Browse reviewed land in Shankarpalli–Chevella

Ask for the survey number, the Bhu Bharati record and the HMDA zone before you pay any advance.

STRAIGHT TALK

Risks & challenges specific to Shankarpalli–Chevella

Specific to this micro-market, beyond the Ranga Reddy and Telangana legal block.

Catchment history

The area around Himayatsagar and Osmansagar was under G.O. 111 for decades. The scrapping was reported in 2023, but a High Court petition against G.O. 69 was pending when last reported, so confirm the current position with HMDA.

Widening and acquisition

Highway four-laning needs land. Check whether the survey number lies in the corridor and whether compensation has been paid.

Road safety and timing

A fatal crash near Mirzaguda in November 2025 shows the road risk. Do not price land on the assumption that the highway opens on schedule.

No master plan yet

HMDA’s region beyond the 2031 plan has no master plan, so permitted use of agricultural l in writing.

Assigned land cannot be sold

Land the government assigned to landless families falls under the Assigned Lands (Prohibition of Transfers) Act, 1977[2], which bars transfer, treats such sales as void and allows up to six months’ jail. Read the Bhu Bharati record and the chain of earlier owners before you pay any advance.

Ceiling on family holdings

The 1973 ceiling Act[3] limits what one family may hold (dry land 35 to 54 acres depending on class; wet land less). A purchase that takes your family above the limit must be declared within 60 days, and the surplus can be taken by the state.

Stamp duty and market value

A sale deed attracts 7.5% of the higher of the deed price and the government market value; in rural areas that is 5.5% stamp duty plus a 2% registration fee (registration department presentation, 12 Feb 2026[5]). Market values were revised across all 144 sub-registrar offices from 5 June 2026 (Telangana Today, 3 Jun 2026[10]). Check the value for your survey number before agreeing a price. See our Telangana stamp duty guide.

NRIs and OCIs cannot buy

FEMA bars NRIs and OCIs from buying agricultural land, farmhouses or plantations except by inheritance. See Can NRIs buy agricultural land in India?.

Conversion before you build

Farm use and building use are different in law. Non-agricultural use needs NALA permission from the Revenue Divisional Officer, with a conversion tax of 3% of basic value (2% inside Greater Hyderabad) and a 50% penalty for unauthorised conversion (NALA Act, 2006[1]). Ask which body approves layouts and buildings in the village: HMDA, the Future City authority or the gram panchayat.

KEEP EXPLORING

Explore more areas

Back to Ranga Reddy

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Shankarpalli–Chevella.

Visit full wiki

01 of 04

Is G.O. 111 still in force near Chevella?

The Telangana Cabinet decided to scrap it in May 2023 and HMDA construction rules apply, as reported. A petition against G.O. 69 was in the High Court, so confirm the current position with HMDA for your village.

Transparency

Sources for this page

Law and courts

Government

News

Further reading

Information is current to November 2026. Highway timelines, catchment rules and market values change often; check the linked source and the relevant office before relying on any figure.

For developers

Ready to explore Shankarpalli–Chevella farmland?

Browse reviewed projects and individual land parcels across Shankarpalli–Chevella — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.