Vyom Green Vatika: Farmhouse Plots, Kishangarh Bas
Khairthal, Alwar, Rajasthan

District guide
Open to Indian buyers, on the expressway route, with over-exploited groundwater, an unscheduled rail extension and no sourced per-acre price series.
36.7 lakh
Population (Census 2011, older boundary)
14 of 14
Groundwater blocks over-exploited (Mar 2009)
41
Rajasthan districts (since Dec 2024)
Open (NRIs barred)
Outsider agricultural land
*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.
Apna Khata — Rajasthan Land Records PortalDistrict land record — Alwar
Rev. 2026 · Farmland India desk
State
Rajasthan
Division
Jaipur
Key sub-areas
Naugaon · Behror · Neemrana · Rajgarh
Primary corridor
Delhi–Mumbai Expressway
Population (Census 2011)
36.7 lakh, before the Khairthal-Tijara split
Land records portal
State land-records system (portal not opened)
Land law is state law. These rules are maintained on the Rajasthan page and apply to every district within it.
In the Ceiling Act and the part of the Tenancy Act we read, no clause limits the purchase of agricultural land to farmers. The limits that do appear sit elsewhere: who may sell (Section 42), how much one family may hold, and how the land may be used once bought.
Who can buy agricultural land? We found no farmer-only clause in the Rajasthan Imposition of Ceiling on Agricultural Holding Act, 1973 or in the first 100,000 characters (of about 108,700) of the Tenancy Act, 1955, apart from the Section 42 bar described below. Clause (a) of Section 42 was omitted with effect from 11 November 1992. Whether any residency or farmer test applies to a particular parcel should be checked with the Sub-Registrar before an advance is paid.
Ceiling limits still apply: Section 4(1) of the Ceiling Act sets, for a family of up to five members, 18 acres of land under assured irrigation that can grow two crops a year and 27 acres where it can grow one crop. Unirrigated land is capped by zone: 48 acres in the fertile zone, 54 in the semi-fertile zone, 125 in the semi-desert zone and 175 in the desert zone (the hilly-zone figure is unclear in the printed text). The ceiling rises by one-fifth for each member beyond five, up to twice the base. Section 17(1) bars acquiring land that takes a holding past the ceiling, and Section 17(2) requires declarations from buyer and seller before the transfer document is registered. The India Code text records amendments up to 2020, so the current schedule needs checking.
SC/ST khatedar land, Section 42 of the Tenancy Act: under clause (b), a sale, gift or bequest of khatedari rights by a Scheduled Caste member to a person outside that community, or by a Scheduled Tribe member to a person outside that tribe, is void; clause (bb) adds the Saharia tribe (Tenancy Act). In State of Rajasthan v. Aanjaney Organic Herbal Pvt. Ltd., Civil Appeals 6741-6742 of 2012, the Supreme Court held on 20 September 2012 that a sale by an SC member to a company was void (Supreme Court, September 2012). In February 2025 the Rajasthan High Court held again that a non-SC/ST buyer cannot acquire khatedari rights by adverse possession (LiveLaw, February 2025). The seller's community should be read from the jamabandi before any money moves.
Conversion for non-agricultural use, Section 90A: Section 90A of the Rajasthan Land Revenue Act, 1956 requires permission before agricultural land is put to non-agricultural use, building included. The State Government decides after an inquiry, the holder pays urban assessment or a premium, and use without permission exposes the holder to ejectment under Section 91 or to a penalty (Indian Kanoon text of Section 90A; the India Code copy could not be opened). The Rajasthan High Court noted in February 2022 that the government may regularise unauthorised conversions (LiveLaw, February 2022). For rural land, the 2007 conversion rules name the deciding officer by use and size: the Tehsildar for a residential unit up to 2,500 sq m, the Sub-Divisional Officer, Collector or State Government for larger plots. A complete application is to be decided within 90 days, and the converted land used within five years (Rules 9(3) and 14(1), Revenue Department rules, 2019 compilation). Later amendments to the rules were not read.
NRI & OCI buyers: The Reserve Bank's Master Direction under FEMA 1999 lets NRIs and OCIs buy immovable property other than agricultural land, plantation property or a farm house, in Rajasthan as elsewhere (RBI Master Direction, updated to 1 September 2022). The inheritance clauses carry no such exclusion, and residential or commercial plots are not on the excluded list.
The full Rajasthan legal framework on our state page applies to Alwar in full. The two notes below are specific to this district. The law was read from Act texts on India Code and press reports in October 2026; where an official page did not open, the note says so.
⚠ Land near the Sariska Tiger Reserve may carry eco-sensitive-zone limits. The Supreme Court ordered in June 2022 that every national park and sanctuary have a zone of at least one kilometre, with no permanent structures inside it (Mongabay India, July 2022), and the National Green Tribunal barred all mining within 10 km of the reserve in December 2018, noting that Sariska's zone had not then been notified (The Logical Indian, December 2018). We found no later notification and did not open the Environment Ministry's own page, so ask the Alwar forest office for the zone map before assuming a plot near the reserve is buildable. Section 42 of the Rajasthan Tenancy Act, 1955 applies here as it does across the state: a sale by a Scheduled Caste or Scheduled Tribe khatedar to a person outside that community is void, and the Supreme Court applied the bar to a company buyer in State of Rajasthan v. Aanjaney Organic Herbal, 2012. Read the khatedar's community entry in the jamabandi before paying any advance.
District overview
Alwar lies on the Rajasthan section of the Delhi–Mumbai Expressway, which is 373 km long and passes through Alwar, Dausa and Kota; the Gurugram–Dausa stretch was reported open in June 2026 (The Tribune, June 2026). The district was larger until the state government reorganised districts: the Khairthal-Tijara district was formed from it, and the December 2024 cabinet decision that cut the state to 41 districts kept Khairthal-Tijara (Scroll, December 2024). The 2011 population of 36.7 lakh and the older land-use figures on this page use the earlier, larger boundary (Central Ground Water Board booklet).
Three kinds of land sit side by side in the district. Parcels along the expressway are the ones most often discussed by Delhi and Gurugram buyers; land near the Sariska reserve is bound by the forest rules above; and the area around Alwar city is conventional peri-urban land. Bhiwadi and Neemrana are the district's large industrial areas (District Industrial Potential Report, Alwar). We have no sourced price series for any of the three.
Naugaon has its own page on this site with sub-area detail. We do not quote a price for it because we could not trace any listed figure to a registered deal.
Connectivity
Journey times are not given for Alwar because we found no sourced figure. The sourced timings below are for the wider expressway.
The Rajasthan section is 373 km and runs through Alwar, Dausa and Kota (The Tribune, June 2026). We found no source for the Alwar interchange locations. See the full route and land-impact analysis in our Delhi–Mumbai Expressway wiki guide.
Growth catalysts
Status labels come from dated news reports. Announced timelines are not guaranteed.
The expressway's Rajasthan section is 373 km. Most of the Dausa–Vadodara length was open or nearly complete in June 2026, and the whole project was reported 75 to 80 percent complete in July 2026 (The Tribune, June 2026; Business Today, July 2026).
Full corridor guide & alignment →Rajasthan and Haryana were reported in May 2026 to have agreed that Rajasthan joins the Namo Bharat network, with a 91 km Rajasthan portion and six proposed stations, and no schedule (Punjab Kesari/IANS, May 2026). We found no sanction order, so treat the extension as a proposal.
Noida International Airport was reported to begin commercial flights on 15 June 2026 (ETV Bharat, June 2026). We found no sourced distance or catchment figure for Alwar, and no post-June report confirming the first flight.
Jewar Airport land guide →Agriculture & terrain
Alwar sits on the Aravalli fringe. The figures below are dated: crop areas are for 2010-11 and the groundwater assessment is for March 2009.
The district's largest crop areas in 2010-11 were bajra (273,147 ha), oilseeds (259,995 ha) and wheat (193,992 ha); average annual rainfall is about 637 mm (Central Ground Water Board booklet). A 2019 field report names mustard as the major crop (ISDM, November 2019). We did not open a soil source, so none is quoted.
The Central Ground Water Board's March 2009 assessment put all 14 blocks of the older, larger district in the over-exploited category, with a district stage of development of 167 percent; Behror (250 percent), Reni (231) and Kotkasim (205) were highest (Central Ground Water Board booklet). Rajasthan's 2024 statewide assessment gives 149.86 percent but no Alwar block figures (CGWB, 2024). Check borewell depth and yield on the ground before assuming irrigation is workable.
We quote no mandi prices for Alwar, because the national price portal did not open in this review and no dated figure is available.
At a glance
| District | Population (Census 2011) | Groundwater, March 2009 data |
|---|---|---|
| Alwar | 36.7 lakh (older boundary) | All 14 blocks over-exploited |
| Jaipur | 66.3 lakh | 12 of 13 blocks over-exploited |
| Dausa | 16.4 lakh | District figure not opened |
Sources: Alwar booklet, Jaipur booklet and Dausa industrial report. Khairthal-Tijara was split from Alwar and is not shown separately because no separate figure was found. Population is for the boundaries before the split.
Farmland India view
Three points we can support with dated sources. None is a price forecast.
The Gurugram–Dausa stretch of the expressway, which runs through the district, was reported open in June 2026 (The Tribune).
Rajasthan joining the Namo Bharat network is reported as agreed in principle only, with no schedule (Punjab Kesari/IANS, May 2026).
We publish no price comparison with Gurugram or Sohna, because no registered-deal or collector-rate series was found for either side.
Section 42 khatedar status and the Sariska zone map are not certified by Farmland India's review; confirm both with the offices named above.
STRAIGHT TALK
Read these before shortlisting in Alwar specifically.
The Supreme Court's June 2022 order bars permanent structures in a zone of at least one kilometre around protected areas (Mongabay India, July 2022). The Sariska zone was not notified as of December 2018 and we found no later notification.
Section 42 voids a sale by a Scheduled Caste or Scheduled Tribe khatedar to a non-member (Rajasthan Tenancy Act, 1955). Read the community entry in the jamabandi before any advance.
All 14 blocks of the older district were over-exploited in the March 2009 assessment (Central Ground Water Board). Check borewell yield on site before pricing in farm income.
Khairthal-Tijara was formed from Alwar and kept in the December 2024 reorganisation (Scroll, December 2024). Ask the Sub-Registrar which office registers a given village before you sign.
The Namo Bharat extension is reported as agreed in principle with no schedule (Punjab Kesari/IANS, May 2026). Value a parcel on what is open today.
Who to contact
Under the 2007 rural conversion rules, the authority that decides a conversion depends on use and size: the Tehsildar for a residential unit up to 2,500 sq m, and the sub-divisional officer, Collector or State above that. A decision is due within 90 days of a complete application, and converted land has to be put to use within five years. Sale-deed registration is handled by the local Sub-Registrar through the state's ePanjiyan system (NeGD listing). Fee and valuation rules should be confirmed at the Sub-Registrar office, as we did not open the registration department's own site.
DEVELOPER PROJECTS · TRUST SCORE
Developer projects carry the platform Trust Score and a reviewed document set.
Reviewed projects have completed Farmland India's document and site review. Individual land parcels are listed by their owners and are not reviewed to the same standard. Always complete your own legal due diligence.
INDIVIDUAL LAND · LAND VERIFICATION SCORE
Individual listings carry the auto-calculated Land Verification Score (LVS).
Reviewed projects have completed Farmland India's document and site review. Individual land parcels are listed by their owners and are not reviewed to the same standard. Always complete your own legal due diligence.
KEEP EXPLORING
Micro-markets in Alwar
Other districts in Rajasthan
Guides & research
COMMON QUESTIONS
Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Alwar.
Visit full wiki01 of 04
Yes, on the texts we read. The Rajasthan Ceiling Act, 1973 sets holding limits (18 acres of land irrigated for two crops, 27 acres for one crop, and 48 to 175 acres of unirrigated land by zone) and the Tenancy Act, 1955 has no clause limiting purchase to farmers. Section 42 voids a sale by a Scheduled Caste or Scheduled Tribe khatedar to a non-member. NRIs and OCIs cannot buy agricultural land under the RBI Master Direction. We read no later amendments, so confirm current limits with a Rajasthan revenue lawyer.
02 of 04
We publish no per-acre band, because listing-site asking prices could not be traced to registered deals. The only dated reference points are statewide: DLC rates rose 10% in April 2026 and 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026), and Alwar was not named in that report. Check the village's DLC rate at the Sub-Registrar.
03 of 04
Base stamp duty and registration fee rates: no official or news source reached, so we state none. Statewide, a surcharge of up to 20% on stamp duty for cow protection is set by the Rajasthan Stamp Act, 1998 (Tribune, September 2018), and DLC rates rose 10% in April 2026 and 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026). Confirm the rate and the village DLC rate with the Sub-Registrar.
04 of 04
Partly confirmed. The Rajasthan section is 373 km and passes through Alwar, Dausa and Kota, and the Gurugram–Dausa stretch was reported open in June 2026 (The Tribune). We found no source naming the Alwar interchanges, so check the alignment against the village before relying on access.
Ready to look at what is available?
Browse reviewed listingsTransparency
Law and courts
Government
News
Further reading
Population and land-use figures are from Census 2011 and 2009-2011 data on the pre-split district boundary. Report inaccuracies to wiki@farmlandindia.com.
For developers
Browse reviewed projects and individual land parcels across Alwar — or if you own land here, list it with platform review and reach serious buyers.
Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.
Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.
Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.
Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.