District guide
Buying Land in Sirohi
A hill-and-plain district in south-west Rajasthan: Mount Abu zone limits, part-Scheduled Area, a rail line under construction and no sourced price series.
5,139 sq km
Area
5 + 3 sub-tehsils
Tehsils
591 mm
Normal rainfall (CRIDA)
116.65 km, due 2027
Taranga Hill–Abu Road rail
District land record — Sirohi
Rev. 2026 · Farmland India desk
State
Rajasthan (south-west; one of the 41 districts after the December 2024 decision)
Sub-divisions
5 tehsils (Sirohi, Sheoganj, Pindwara, Abu Road, Reodar) and 3 sub-tehsils (Bhavri, Kalandri, Mandar); Mount Abu is a sub-division and Nagar Palika (Brief Industrial Profile, Sirohi; the district portal did not return its content)
Key markets
Abu Road · Sirohi town · Pindwara · Reodar · Sheoganj · Mount Abu (restricted zone)
Demand anchors
Mount Abu hill-station tourism · Abu Road rail junction on the Delhi–Ahmedabad line · Taranga Hill–Ambaji–Abu Road rail line under construction · limestone and marble mining belt
Rail
Abu Road lies on the main Delhi–Ahmedabad line; 62 km of rail in the district in 2010-11 (Brief Industrial Profile, Sirohi)
Size and population
5,139 sq km (the same profile also prints 5,179.47) · 8,51,107 people at Census 2011 (our sum of the profile's male and female counts) (MSME-DI profile)
Pricing unit
₹/acre or ₹/hectare (farmland)
Local units
Local land units vary by tehsil and village; convert every quote to acres or hectares before comparing offers
Land records portal
Apna Khata / eDharti land-records system (named in the NeGD listing; portal not opened for this page)
Land law is state law. These rules are maintained on the Rajasthan page and apply to every district within it.
Sirohi — land purchase legal rules
In the Ceiling Act and the part of the Tenancy Act we read, no clause limits the purchase of agricultural land to farmers. The limits that do appear sit elsewhere: who may sell (Section 42), how much one family may hold, and how the land may be used once bought.
Who can buy agricultural land? We found no farmer-only clause in the Rajasthan Imposition of Ceiling on Agricultural Holding Act, 1973 or in the first 100,000 characters (of about 108,700) of the Tenancy Act, 1955, apart from the Section 42 bar described below. Clause (a) of Section 42 was omitted with effect from 11 November 1992. Whether any residency or farmer test applies to a particular parcel should be checked with the Sub-Registrar before an advance is paid.
Ceiling limits still apply: Section 4(1) of the Ceiling Act sets, for a family of up to five members, 18 acres of land under assured irrigation that can grow two crops a year and 27 acres where it can grow one crop. Unirrigated land is capped by zone: 48 acres in the fertile zone, 54 in the semi-fertile zone, 125 in the semi-desert zone and 175 in the desert zone (the hilly-zone figure is unclear in the printed text). The ceiling rises by one-fifth for each member beyond five, up to twice the base. Section 17(1) bars acquiring land that takes a holding past the ceiling, and Section 17(2) requires declarations from buyer and seller before the transfer document is registered. The India Code text records amendments up to 2020, so the current schedule needs checking.
SC/ST khatedar land, Section 42 of the Tenancy Act: under clause (b), a sale, gift or bequest of khatedari rights by a Scheduled Caste member to a person outside that community, or by a Scheduled Tribe member to a person outside that tribe, is void; clause (bb) adds the Saharia tribe (Tenancy Act). In State of Rajasthan v. Aanjaney Organic Herbal Pvt. Ltd., Civil Appeals 6741-6742 of 2012, the Supreme Court held on 20 September 2012 that a sale by an SC member to a company was void (Supreme Court, September 2012). In February 2025 the Rajasthan High Court held again that a non-SC/ST buyer cannot acquire khatedari rights by adverse possession (LiveLaw, February 2025). The seller's community should be read from the jamabandi before any money moves.
Conversion for non-agricultural use, Section 90A: Section 90A of the Rajasthan Land Revenue Act, 1956 requires permission before agricultural land is put to non-agricultural use, building included. The State Government decides after an inquiry, the holder pays urban assessment or a premium, and use without permission exposes the holder to ejectment under Section 91 or to a penalty (Indian Kanoon text of Section 90A; the India Code copy could not be opened). The Rajasthan High Court noted in February 2022 that the government may regularise unauthorised conversions (LiveLaw, February 2022). For rural land, the 2007 conversion rules name the deciding officer by use and size: the Tehsildar for a residential unit up to 2,500 sq m, the Sub-Divisional Officer, Collector or State Government for larger plots. A complete application is to be decided within 90 days, and the converted land used within five years (Rules 9(3) and 14(1), Revenue Department rules, 2019 compilation). Later amendments to the rules were not read.
NRI & OCI buyers: The Reserve Bank's Master Direction under FEMA 1999 lets NRIs and OCIs buy immovable property other than agricultural land, plantation property or a farm house, in Rajasthan as elsewhere (RBI Master Direction, updated to 1 September 2022). The inheritance clauses carry no such exclusion, and residential or commercial plots are not on the excluded list.
- No farmer-only bar found
- Ceiling: 18–175 acres by class
- Tenancy Act §42
- Sec 90A conversion
- NRI agri: barred (FEMA)
- Land records portal
Sirohi — district-specific notes
The Rajasthan state page applies to Sirohi in full. The notes below are specific to this district and are not repeated from the state page. Law was read from the Ministry of Environment notification for Mount Abu, a National Green Tribunal order, a Supreme Court judgment and the Tenancy Act text; where an official page did not open, the note says so.
⚠ Part of Sirohi sits inside the Mount Abu Eco-Sensitive Zone. The notification places the zone in Sirohi district between 24°33'42" and 24°39'00" north, at elevations of 300 to 1,727 metres, and says that until a Zonal Master Plan is approved there is to be no increase in floor area ratio, ground coverage, floors or height; new construction needs Monitoring Committee approval; development is barred on steep slopes, spring lines and first-order streams; and quarrying is restricted (MoEF notification S.O. 1545(E)). The master plan may not convert orchards, horticulture areas or agricultural parks to non-green uses. The Zonal Master Plan 2030 was notified in October 2015, and on 10 March 2021 the National Green Tribunal ordered it revised to match the zone notification (NGT order, March 2021); the Supreme Court dismissed the appeals against that order on 12 January 2022 (Supreme Court, January 2022). We did not find the revised plan, so ask the Mount Abu Municipal Council and the Monitoring Committee what is permitted on a given plot. The file name of the notification carries 25.06.2005 while the NGT order refers to a 2009 notification, so the notification date is a CONFIRM item.
⚠ Parts of Sirohi are Scheduled Areas. The Union Cabinet approved a revised declaration of Scheduled Areas in Rajasthan on 25 April 2018, and the press release lists Sirohi among five districts covered in part, without naming the tehsils or panchayats (Ministry of Tribal Affairs, April 2018). We could not tell from the release whether Abu Road, Pindwara or Reodar villages are inside, and we did not read the Fifth Schedule rules on transfers to non-tribal buyers, so ask the Tehsildar whether the village is a Scheduled Area. Whatever the answer, Section 42 of the Tenancy Act applies to Scheduled Tribe khatedars: a sale by an ST member to a non-ST person is void (Tenancy Act, 1955; Supreme Court, September 2012). Read the seller's community from the jamabandi before any advance is paid.
⚠ Forest and mining land are large parts of the map. The MSME-DI profile gives the district's forest area as 137,216 hectares in one place and 155,461 hectares in another (31 March 2011 and 2010-11), and lists 2010-11 production of cement-grade limestone, marble, granite, wollastonite and calcite (Brief Industrial Profile, Sirohi). A khasra beside a lease or inside a forest block may carry limits that the jamabandi does not show. We did not open a lease register or forest notification, so ask the Forest Department and the Mines and Geology office for a written status of the khasra. The state-wide rules on the Ceiling Act, Section 90A conversion and NRI purchase on the Rajasthan page apply here unchanged.
- Mount Abu Eco-Sensitive Zone
- Scheduled Areas (part)
- Tenancy Act §42
- Forest and mining overlay
District overview
Sirohi — a hill-and-plain district where Mount Abu rules and a new rail line shape the land market
Sirohi is a district of 5,139 sq km in south-west Rajasthan, with 8,51,107 people at Census 2011 on our addition of the MSME-DI profile's male and female counts (MSME-DI profile). The profile lists five tehsils (Sirohi, Sheoganj, Pindwara, Abu Road, Reodar) and three sub-tehsils, and describes the granite massif of Mount Abu as dividing the district into two parts running north-east to south-west. Abu Road, not Mount Abu, is called the main city and financial hub, and it lies on the Delhi–Ahmedabad main line. The profile dates from 2010-11, and Sirohi was not among the districts scrapped in December 2024 (Scroll, December 2024); the district portal did not return its content when we tried it.
We publish no per-acre price band for Sirohi. No official or news source we opened gave a district land price, and listing-site asking prices could not be traced to registered deals. The only dated pricing signal is state-wide: Patrika reported that Rajasthan raised DLC rates by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026), and we did not find a Sirohi-specific schedule. DLC rates are registration floors, not market prices.
Land use is shaped by terrain and by restrictions. The ICAR-CRIDA plan gives 591.1 mm of normal rainfall, sandy loam on 74% of the area and castor, maize, wheat and mustard as the main crops (ICAR-CRIDA Sirohi plan), and the Mount Abu zone limits what can be built on the hill itself (MoEF notification). The rail line from Taranga Hill and Ambaji to Abu Road is under construction (Indian Infrastructure, March 2026), and a Rs 205 crore Mount Abu–Gulabganj road is in the tender stage (Patrika, January 2026).
- Mount Abu
- Abu Road
- Pindwara
- Reodar
- Sheoganj
- Aravalli Hills
Transaction costs
Stamp duty & registration in Sirohi
Up to 20%
Surcharge on stamp duty
Cow-protection surcharge, Section 3-B, Stamp Act 1998; cap raised from 10% in 2018
DLC
Valuation basis
Patrika reported in August 2026 that duty and fee follow DLC rates
Not traced
Base duty and fee
Sale-deed rates could not be traced to an official page or a news report
Rajasthan's stamp rules apply in Sirohi as elsewhere in the state. The surcharge cap was raised from 10% to 20% by the Rajasthan Stamp (Amendment) Bill, 2018 (PRS, Bill 18 of 2018; The Tribune, September 2018); the rate notified today is not confirmed, and the base stamp duty and registration fee for a sale deed could not be traced, so none is quoted. Deeds are registered through the ePanjiyan system (NeGD listing). Patrika reported in December 2024 that agricultural registrations moved to hectares and that DLC rates rose by up to 50% on irrigated rural land (Patrika, December 2024), and in August 2026 that rates rose 5% to 49% in listed areas from 3 August (Patrika, August 2026); we found no Sirohi-specific schedule. Since July 2024, Rule 57 of the Stamp Rules lets the registering officer inspect land and value open land and structures separately (TeamLease RegTech, July 2024). The Sirohi Sub-Registrar can give the schedule in force.
Know the belt
What is moving prices in Sirohi
No district price series was found. The notes below record what is known about how the market is shaped, with every figure dated.
Mount Abu zone
Construction capped until a master plan is approved
The Eco-Sensitive Zone notification freezes floor area ratio, ground coverage, floors and height until a Zonal Master Plan is approved, and the NGT sent the 2030 plan back for revision in March 2021 (MoEF notification; NGT order). A buyer should treat land inside the zone as a regulatory question first and a price question second.
Check: the zone boundary against the khasra, the Monitoring Committee's view and the status of the revised plan.
Abu Road
Rail junction and new rail line
Abu Road lies on the Delhi–Ahmedabad main line and is the end point of the 116.65 km Taranga Hill–Ambaji–Abu Road line, approved by the Cabinet Committee on Economic Affairs in July 2022 at Rs 2,798.16 crore (India Infra Hub, July 2022). Indian Infrastructure reported in March 2026 that work is under way and completion is expected in 2027 (March 2026).
Check: the alignment, any acquisition notice and access to the parcel.
Mount Abu–Gulabganj road
Rs 205 crore, tender stage
Patrika reported on 7 January 2026 that a Rs 205 crore, roughly 20 km road was sanctioned, with the detailed project report tendered and Forest Department permission still pending; the report says it would cut Sirohi to Mount Abu from about 100 km to about 55 km (Patrika, January 2026).
Check: forest clearance and whether the alignment is notified.
Asking prices
No sourced price series
Listing-site asking prices for Sirohi could not be traced to registered deals, so none are shown. The DLC rate is the only official reference and it is a floor for registration, not what a seller will accept.
Check: registered sale deeds in the same revenue estate before negotiating.
Units
Land in Sirohi is quoted in local units that differ between tehsils and between sellers. The revenue record states area in hectares or acres, so convert any quote to acres or hectares and confirm the share of the khata being sold. We did not open a revenue manual for local unit definitions, so ask the Patwari.
Connectivity
How Sirohi connects — road, rail and air
Distances to Ahmedabad, Jaipur and Delhi are not given because no official or news source was found for them. Journey times vary with traffic and road works.
By road
By air
By rail
The practical question is the last leg from the highway to the parcel; ask for the access road in the revenue record. Full Rajasthan rules for buyers from outside the state: Rajasthan agricultural land rules.
Growth catalysts
Upcoming infrastructure & developments
Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked confirm have a single or an older source.
01Open or inaugurated
03In progress or pending
Agriculture & terrain
Soil, crops & water in Sirohi
A sandy-loam district of tanks, open wells and hills, where castor, maize, wheat and mustard lead and the Mount Abu zone limits building.
🌾 Plains and tank-fed farmland (Sirohi, Reodar, Sheoganj)
The ICAR-CRIDA plan (undated figures, published 2012) gives sandy loam on 74.10% of the area, clay loam on 24.65% and loam on 1.10%. Main crops: castor 52,388 ha and maize 27,487 ha in kharif; wheat 23,000 ha, rapeseed-mustard 22,500 ha and gram 5,500 ha in rabi. Net sown area is 162,788 ha and gross cropped area 225,382 ha, a cropping intensity near 138% (ICAR-CRIDA Sirohi plan).
- Castor
- Maize
- Wheat
- Mustard
⛰️ Mount Abu massif and forest
The MSME-DI profile describes the granite massif of Mount Abu as dividing the district, with conifer forest on its higher ground, and gives forest area as 137,216 or 155,461 hectares depending on the table (MSME-DI profile). Eco-Sensitive Zone rules decide what can be built here, so legal status matters more than soil.
- Mount Abu
- Forest
- Eco-Sensitive Zone
⛏️ Mining belt
Mines and Geology data in the profile show 2010-11 production of cement-grade limestone (11,400,211 tonnes), marble block and khanda, granite, masonry stone, wollastonite and calcite (MSME-DI profile). Ask whether a khasra beside a lease has any access or use limit, because the jamabandi will not show it.
- Limestone
- Marble
- Granite
💧 Water & rainfall
Normal annual rainfall is 591.1 mm in the ICAR-CRIDA plan, almost all in the June to September monsoon. Irrigation is mostly open wells (107,590 ha), tanks (40,520 ha), canals (8,948 ha) and bore wells (1,791 ha) in that plan, with a net irrigated area of 96,576 ha (ICAR-CRIDA). The West Banas river drains the south and south-east of the district (MSME-DI profile). Statewide, CGWB 2024 puts extraction at 149.86%, with 214 of 302 assessment units over-exploited; its tables name no Sirohi blocks, and it lists Sirohi only among districts with sporadic high electrical conductivity, fluoride and nitrate (CGWB, Rajasthan 2024). Check borewell yield and water quality for any parcel.
📐 Measurement units
Local land units differ by tehsil and village. Convert every quote to acres or hectares before comparing two offers. Crop income is modest next to land values in tourism and rail-linked locations, so price a parcel on its location and permitted use, not on castor or wheat yield. We did not open a mandi price page for this district.
At a glance
Sirohi vs. its neighbours
| District / belt | Price band* (per acre) | Evidence |
|---|---|---|
| Sirohi — district | No sourced price series | No figure used on this page |
| Pali | No sourced price series | No figure used on this page |
| Jalore | No sourced price series | No figure used on this page |
| Udaipur | No sourced price series | No figure used on this page |
*Collector (DLC) rates are registration floors, not market prices, and no district rate was sourced for any of these districts. Neighbours are listed from general geography; the district portal did not open to check boundaries. See the Pali page, the Jalore page and the Udaipur page for the surrounding belt.
Farmland India view
Why investors look at Sirohi
Five reasoned points, with an honest note that the price evidence is thin and the main catalysts are still under construction or in approval.
A rail junction with a new line coming
Abu Road is on the Delhi–Ahmedabad main line and is the end point of a 116.65 km new line under construction, with completion reported for 2027. A buyer should time the actual trip to the parcel rather than rely on the map.
Mount Abu keeps supply tight by rule
The Eco-Sensitive Zone freezes building parameters until a master plan is approved. That limits new supply on the hill, but it also means a plot's value depends on a regulatory status that is still being revised.
A road project that depends on forest clearance
The Rs 205 crore Mount Abu–Gulabganj road would cut the Sirohi–Mount Abu trip by roughly 45 km on the report's figures, but forest permission was pending in January 2026. This desk reads it as optionality.
Mining and farming sit side by side
Limestone and marble leases share the district with castor, maize and wheat fields. Parcels away from leases and forest blocks are easier to document than those beside them.
A market that rewards paperwork
With ESZ, Scheduled Area, forest and Section 42 questions all parcel-specific, a buyer who documents each one is better placed than one relying on a broker summary. The return case is location and permitted use, not crop yield.
Confirm Eco-Sensitive Zone, Scheduled Area, forest and lease status directly; these are not certified by Farmland India’s review.
STRAIGHT TALK
Risks & challenges in Sirohi
Read these before shortlisting in Sirohi specifically.
Mount Abu zone limits
Inside the Eco-Sensitive Zone, building parameters are frozen until a master plan is approved and the 2030 plan was sent back for revision in 2021. Ask for the zone map and the Monitoring Committee's written view.
Scheduled Area and Section 42
Parts of Sirohi are Scheduled Areas and a sale by an ST khatedar to a non-ST person is void under Section 42(b). Read the seller's community from the jamabandi and ask which villages are scheduled.
Forest and mining overlay
Forest area is large in the district and limestone, marble and granite are quarried. Ask the Forest Department and the Mines and Geology office for the khasra's status in writing.
Water quality and depth
CGWB 2024 lists Sirohi among districts with sporadic high conductivity, fluoride and nitrate, and the statewide stage of extraction is 149.86%. Test the borewell before assuming irrigation or a farmhouse supply.
Announced is not delivered
The new rail line has a 2027 expectation after a 2026-27 target in 2022, and the Mount Abu–Gulabganj road awaited forest permission in January 2026. Price on today's fundamentals.
DLC churn
Rajasthan reported DLC rises of 5% to 49% in listed areas from 3 August 2026; we found no Sirohi schedule. Check the rate in force for the village on the sale-deed date.
No sourced price series
We use no listing-site prices for Sirohi, and DLC rates are only a floor. Collect registered comparables before negotiating.
Who to contact
Local revenue, planning & registration offices
Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil (Sirohi, Sheoganj, Pindwara, Abu Road, Reodar) or sub-tehsil (Bhavri, Kalandri, Mandar), as listed in the MSME-DI profile; the profile is old, so ask the District Collector's office for the current list. Conversion for non-agricultural use goes to the authority named in the 2007 rural conversion rules, by use and size. Mount Abu questions go to the Mount Abu Municipal Council and the Zone's Monitoring Committee. Sale-deed registration is handled by the local Sub-Registrar through ePanjiyan (NeGD listing). The Sirohi district portal and the Rajasthan revenue and registration sites did not return content when we tried them, so check them directly.
KEEP EXPLORING
Explore more areas
Other districts in Rajasthan
- AlwarFarmhouse Estate • 12 listings
- Balotra
- Banswara
- Baran
- Barmer
- Beawar
- Bharatpur
- Bhilwara
- Bikaner
- BundiAgricultural Land • 1 listing
- Chittorgarh
- Churu
- DausaFarmhouse Estate • 2 listings
- Deeg
- Dholpur
- Didwana-Kuchaman
- Dungarpur
- Ganganagar
- Hanumangarh
- JaipurFarmhouse Estate • 2 listings
- Jaisalmer
- Jalor
- Jhalawar
- Jhunjhunu
- Jodhpur
- Karauli
- Khairthal-Tijara
- Kota
- Kotputli-BehrorFarmhouse Estate • 1 listing
- Nagaur
- Pali
- Phalodi
- Pratapgarh
- Rajsamand
- Salumbar
- Sawai Madhopur
- Sikar
- Tonk
- Udaipur
Guides & research
- Stamp Duty Calculator Rajasthan: DLC Land Table (2026)Wiki · P11 Taxation, Stamp Duty & Registration
- DLC Rate Jodhpur: Lookup Table and Method (2026)Wiki · P11 Taxation, Stamp Duty & Registration
- DLC Rate Jaipur: Lookup Table and Method (2026)Wiki · P11 Taxation, Stamp Duty & Registration
- Acre to Bigha in Rajasthan: Pucca, Kachcha (2026)Wiki · P01 Land Measurement Units
- Stamp Duty Rajasthan: Land Registry Charges (2026)Wiki · P11 Taxation, Stamp Duty & Registration
- DLC Rate Lookup Rajasthan: Check Circle Rate (2026)Wiki · P02 Land Records & Documentation
- Girdawari Rajasthan: Crop Record Guide (2026)Wiki · P02 Land Records & Documentation
- Mutation Status Rajasthan: Check Online (2026)Wiki · P02 Land Records & Documentation
COMMON QUESTIONS
Frequently asked questions
Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Sirohi.
Visit full wiki01 of 04
Can I build or buy land near Mount Abu?
Part of Sirohi is inside the Mount Abu Eco-Sensitive Zone. The notification freezes floor area ratio, ground coverage, floors and height until a Zonal Master Plan is approved, requires Monitoring Committee approval for new construction and bars development on steep slopes, spring lines and first-order streams. The National Green Tribunal ordered the 2030 plan revised on 10 March 2021 and the Supreme Court dismissed the appeals on 12 January 2022; we did not find the revised plan, so ask the Mount Abu Municipal Council for the zone map and written permissions.
02 of 04
What does land cost in Sirohi?
We publish no per-acre band for Sirohi because no official or news source gave a district land price and listing-site asking prices could not be traced to registered deals. The only dated pricing signal is state-wide: Patrika reported that DLC rates rose 5% to 49% in listed areas from 3 August 2026. DLC rates are registration floors, not market prices, and we found no Sirohi-specific schedule.
03 of 04
Do the SC/ST rules and Scheduled Area status affect buying in Sirohi?
Yes. Section 42(b) of the Tenancy Act makes a sale by an ST member to a non-ST person void, and the Union Cabinet approved a revised Scheduled Areas declaration in April 2018 that covers parts of Sirohi without naming the tehsils in the release. We did not read the Fifth Schedule transfer rules, so ask the Tehsildar whether the village is scheduled and read the seller's community from the jamabandi.
04 of 04
What infrastructure is coming to Sirohi?
A 116.65 km Taranga Hill–Ambaji–Abu Road rail line is under construction, with completion expected in 2027 per a March 2026 report. A Rs 205 crore Mount Abu–Gulabganj road was at the tender stage in January 2026 with forest permission pending. Both are reported timelines, not guarantees.
Ready to look at what is available?
Browse reviewed listingsTransparency
Sources and references
Law and courts
- Rajasthan Tenancy Act, 1955 (ss. 42, 42B), India Code
- Rajasthan Imposition of Ceiling on Agricultural Holding Act, 1973 (ss. 4, 17), India Code
- State of Rajasthan v. Aanjaney Organic Herbal Pvt. Ltd., Civil Appeals 6741-6742 of 2012, Supreme Court, 20 Sep 2012
- Anandi Lal v. Dalip Prajapat, Rajasthan High Court, LiveLaw, 14 Feb 2025
- Section 90A, Rajasthan Land Revenue Act, 1956 (Indian Kanoon text)
- Bhanwar Singh v. State of Rajasthan, Rajasthan High Court, LiveLaw, Feb 2022
- Order on Zonal Master Plan 2030, Mount Abu Eco-sensitive Zone, National Green Tribunal, 10 Mar 2021 (India Environment Portal)
- Pragnesh Shah v. Dr Arun Kumar Sharma, Civil Appeals 7724-7725 of 2021, Supreme Court, 12 Jan 2022
Government
- Brief Industrial Profile of Sirohi District, MSME-DI (data 2010-11, Census 2011)
- District agriculture contingency plan, Sirohi (RAJ33), ICAR-CRIDA, 2012
- Notification S.O. 1545(E), Mount Abu Eco-Sensitive Zone, Ministry of Environment, Forest and Climate Change
- Cabinet approves Scheduled Areas in Rajasthan, Ministry of Tribal Affairs press release, 25 Apr 2018
- Rajasthan Land Revenue (Conversion of Agricultural Land for Non-Agricultural Purposes in Rural Areas) Rules, 2007 (2019 compilation), Revenue Department
- Dynamic Ground Water Resources and Ground Water Quality of Rajasthan 2024, Central Ground Water Board
- Master Direction FED 12/2015-16 (updated to 1 Sep 2022), Reserve Bank of India
- Rajasthan Stamp (Amendment) Bill, 2018 (Bill 18 of 2018), PRS Legislative Research
- India Stack Local listing, Rajasthan, NeGD
News
- Mount Abu-Gulabganj road, Patrika, 7 Jan 2026
- CCEA approves Taranga Hill-Ambaji-Abu Road rail line, India Infra Hub, 14 Jul 2022
- Taranga Hill-Abu Road new railway line, Indian Infrastructure, 6 Mar 2026
- Rajasthan DLC rate hike, Patrika, 4 Aug 2026
- Rajasthan DLC rates raised up to 50%, Patrika, 3 Dec 2024
- Rajasthan's BJP government scraps new districts, Scroll, 29 Dec 2024
- Rajasthan raises stamp duty surcharge from 10 to 20 for cow protection, The Tribune, 7 Sep 2018
Further reading
- Lok Sabha Unstarred Question 3083, 18 Dec 2025 (groundwater, Rajasthan)
- Rajasthan Monsoon Report 2025, IMD Jaipur
- Rajasthan Budget 2026-27 press note, Finance Department
- Rajasthan Budget Analysis 2026-27, PRS Legislative Research
- Rajasthan government annuls 9 districts and 3 divisions, Sentinel Assam, 29 Dec 2024
- Rajasthan Stamp (Amendment) Rules 2024, TeamLease RegTech, Jul 2024
- Rise in construction rates, Patrika, 19 Nov 2025
- Lok Sabha Unstarred Question 2967, 12 Dec 2024 (ERCP and PKC link)
- Eastern Rajasthan Canal Project update, NBM&CW, 2 Dec 2025
Data-currency note: area, population, tehsils, rail and mining figures come from an MSME-DI profile with 2010-11 data and Census 2011; crop and soil figures come from a 2012 ICAR-CRIDA plan whose reference year is not stated; groundwater is the state-wide CGWB 2024 report; infrastructure statuses were read in October 2026 and change quickly. District portal and state revenue sites did not return content. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.
For developers
Ready to explore Sirohi farmland?
Browse reviewed projects and individual land parcels across Sirohi — or if you own land here, list it with platform review and reach serious buyers.