Farmland India
Aerial view of agricultural land and farm fields near Banswara, Rajasthan

District guide

Buying Land in Banswara

A Scheduled Area district on the Mahi: canal-fed black soil, a nuclear power site cleared for excavation and a rail line still being acquired.

  • 5,037 sq km

    Area

  • 17.97 lakh

    Population (Census 2011)

  • 59,031 ha

    Canal-irrigated (2011-12)

  • 4 x 700 MWe

    Atomic power units planned

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

Apna Khata — Rajasthan Land Records Portal

District land record — Banswara

Rev. 2026 · Farmland India desk

State

Rajasthan

Sub-divisions

Eight tehsils in the industrial profile (Banswara, Chhoti Sarvan, Talwara, Khushalgarh, Sajjangarh, Ghatol, Garhi, Bagidora) (District Industrial Profile); the Central Ground Water Board booklet lists five tehsils and eight blocks (CGWB booklet). The district portal opened without a tehsil list, so confirm the current set

Key markets

Banswara · Ghatol · Garhi · Bagidora · Kushalgarh (tehsil centres in the documents read)

Demand anchors

Atomic power project site (excavation cleared for units 1 and 2, March 2026) · Dungarpur–Banswara–Ratlam rail line in land acquisition · Mahi Bajaj Sagar canal irrigation

Rail

No operating line found in the sources read; ETV Bharat reported in July 2025 that Banswara is not yet connected to Indian Railways (ETV Bharat, July 2025)

Size and population

5,037 sq km · 17,97,485 people at Census 2011 (CGWB booklet, 2013)

Pricing unit

₹/acre in quotes · agricultural registration in hectares since the December 2024 DLC revision

Local units

Local units vary by tehsil and record; convert to acres or hectares and match the area in the jamabandi

Land records portal

Apna Khata and eDharti systems (NeGD listing); the portals were not opened for this page

District overview

Banswara — a Scheduled Area district on the Mahi, with a nuclear site and a rail line still being acquired

Banswara covers 5,037 sq km and had 17,97,485 people at Census 2011 (CGWB booklet, 2013). The District Industrial Profile lists eight tehsils and eight panchayat samitis, and the CGWB booklet five tehsils and eight blocks, so the tehsil count differs between documents (District Industrial Profile). The district drains into the Mahi basin, and only the Mahi and Anas are perennial rivers. Rajasthan's 41 districts were set in December 2024 (Scroll, December 2024); the state count is flagged CONFIRM.

We publish no per-acre price band for Banswara. No registered-deal series or district DLC table was reached, and listing-site asking prices could not be traced to registered deals. DLC rates were raised about 10% in April 2026 and by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026; Hindi-language report). In December 2024 irrigated rural land rose by up to 50% and agricultural registration moved to hectares (Patrika, December 2024). A DLC rate is a registration floor, not a market price.

Canals from the Mahi Bajaj Sagar project irrigated 59,031 of 102,158 net irrigated hectares in 2011-12 (CGWB). Three projects shape the land market: the atomic power project site, the Dungarpur–Banswara–Ratlam line (646 of 1,736 hectares acquired by August 2025 (Indian Infrastructure, August 2026)) and a proposed Neemuch–Banswara–Dahod line at survey and DPR stage (Lok Sabha, August 2025).

  • Banswara
  • Ghatol
  • Garhi
  • Bagidora
  • Kushalgarh
  • Mahi Bajaj Sagar
Locator map of Banswara district in Rajasthan

Transaction costs

Stamp duty & registration in Banswara

Up to 20%

Surcharge on stamp duty

cow-protection surcharge cap under section 3-B, Stamp Act 1998; raised from 10% in 2018; notified rate to confirm

DLC

Valuation basis

Patrika reported in August 2026 that duty and fee follow DLC rates (Hindi-language report)

Not traced

Base duty and registration fee

no official page or news report found; ask the Sub-Registrar

The surcharge cap on stamp duty (cow protection, section 3-B of the Rajasthan Stamp Act, 1998) was raised from 10% to 20% in 2018 (PRS, Bill 18 of 2018; The Tribune, September 2018); the rate notified today is not confirmed. We could not trace the base sale-deed duty or the registration fee to an official page or a news report, so none is quoted; ask the Sub-Registrar for the current schedule. Patrika reported in August 2026 that duty and fee follow DLC (district level committee) rates, and in December 2024 gave a worked example: on a ₹50 lakh transaction where the rate rose 15%, the extra cost was ₹66,000 in a man's name and ₹56,250 in a woman's. Since July 2024 rule 57 of the Stamp Rules lets the registering officer inspect the land and value open land and structures separately (TeamLease RegTech, July 2024). Deeds are registered through the Registration and Stamps Department's ePanjiyan system (NeGD listing). DLC rates were raised about 10% in April 2026 and by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026; Hindi-language report). In December 2024 irrigated rural land rose by up to 50% and agricultural registration moved to hectares (Patrika, December 2024).

Know the belt

What is moving prices in Banswara

Official facts about the projects, canals and mines that matter to a parcel. No listing-site prices are used.

Mahi Banswara atomic power site

4 x 700 MWe planned; units 1 and 2 cleared for excavation (26 Mar 2026)

The regulator issued construction consent for units 1 to 4 in May 2025 and approved the start of excavation activities for units 1 and 2 on 26 March 2026 (AERB; World Nuclear News). The reactors are pressurised heavy water type. No land price effect has been published.

Check: whether any restricted zone or acquisition touches the khasra; ask the Collector in writing.

Dungarpur–Banswara–Ratlam rail alignment

About 188 km; ₹2,083 crore; 646 of 1,736 ha acquired

The Lok Sabha was told on 20 August 2025 that the cost is shared 50:50 between Rajasthan and the Railway Ministry, that the state provides land, that about 37% of the land had been acquired and that no completion date can be fixed (Lok Sabha). Indian Infrastructure repeated the 646-hectare figure on 11 August 2026 (Indian Infrastructure).

Check: the acquisition list and compensation status for the khasra and its neighbours.

Mahi Bajaj Sagar canal command

59,031 ha canal-irrigated of 102,158 ha net irrigated (2011-12)

The CGWB booklet splits net irrigated area into canals 59,031 ha, dug wells 15,393, tube and bore wells 3,940, tanks and ponds 3,556 and other sources 18,758 (CGWB). The tables are 2011-12, so treat them as a pattern, not a current count.

Check: whether the parcel lies in the canal command and what water entitlement it carries.

Industrial areas and minerals

Five industrial areas; soapstone, manganese and marble in the 2010-11 data

The industrial profile lists five industrial areas (Peepalwa 118.27 ha, Thikariya 226.00 ha, Kushalgarh 9.45 ha, Partapur 10.26 ha, Ghatol 15.37 ha) and 2010-11 output of 12,950 tonnes of soapstone, 7,288 tonnes of manganese and 46,555 tonnes of marble, with marble reserves estimated at around 190 million tonnes (District Industrial Profile).

Check: mining leases or lease applications on the khasra and on its boundary.

Asking prices

No sourced price series

Listing-site asking prices for Banswara could not be traced to registered deals, so none is shown. The DLC rate is the only official reference and no district table was reached.

Check: registered sale deeds in the same revenue estate before negotiating.

Units and measurement

Banswara sellers and records can use local land units that differ by tehsil, and agricultural registration was moved to hectares in December 2024 (Patrika, December 2024). Convert every quote to acres or hectares (1 hectare is about 2.47 acres) and match it to the area in the jamabandi. We did not open a revenue manual for local unit definitions.

Connectivity

How Banswara connects — road, rail and air

Distances and drive times to Udaipur, Ahmedabad, Indore and Delhi are not given because no official or news source was found.

By road

National highway length239 km (2010-11 industrial profile)
Highway projects for BanswaraNone found in the sources read
Industrial areasPeepalwa, Thikariya, Kushalgarh, Partapur, Ghatol

By rail

Operating lineNone found; reported not yet connected (Jul 2025)
Dungarpur–Banswara–RatlamAbout 188 km, ₹2,083 crore; 646 of 1,736 ha acquired
Neemuch–Banswara–Dahod–Nandurbar380 km; survey and DPR sanctioned (Aug 2025)

By air & metro

AirportNone in the district found in the sources read
MetroNo metro project found in the sources read

The practical question is the last leg from the road to the parcel; ask for the access path in the revenue record. Full Rajasthan rules for buyers from outside the state: Rajasthan agricultural land rules.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government timelines are not guaranteed; items marked pending have no construction start we could confirm.

01Open or inaugurated

03In progress or pending

In use · 59,031 ha canal-irrigated (2011-12) Mahi Bajaj Sagar canal system
Excavation cleared for units 1 and 2 · 26 Mar 2026 Mahi Banswara atomic power project
Land acquisition · 646 of 1,736 ha (Aug 2025) Dungarpur–Banswara–Ratlam rail line
Survey and DPR sanctioned · Aug 2025 Neemuch–Banswara–Dahod–Nandurbar line
In use · 59,031 ha canal-irrigated (2011-12)

Mahi Bajaj Sagar canal system

The main canal irrigation source in the district: the CGWB booklet records 59,031 hectares irrigated by canals of the Mahi Bajaj Sagar project out of 102,158 hectares net irrigated in 2011-12, with the Mahi and Anas the only perennial rivers (CGWB booklet, 2013). The figures are 13 years old, so check current canal-command status for the parcel.

Source: Central Ground Water Board, 2013

Canal-irrigated

59,031 ha

Net irrigated

102,158 ha

Table year

2011-12

Status

In use

Land markets in the blast radius

  • Banswara
Excavation cleared for units 1 and 2 · 26 Mar 2026

Mahi Banswara atomic power project

Four pressurised heavy water units of 700 MWe each are planned in Banswara district. The regulator issued construction consent for units 1 to 4 in May 2025 and approved the start of excavation activities for units 1 and 2 on 26 March 2026 (AERB, March 2026; World Nuclear News, March 2026). The Lok Sabha and press reports give no completion date for the site that we could confirm.

Source: AERB, 26 Mar 2026; World Nuclear News, 27 Mar 2026

Planned units

4 x 700 MWe

Cleared now

Units 1 and 2

Approval

Excavation

Date

26 Mar 2026

Land markets in the blast radius

  • Banswara
Land acquisition · 646 of 1,736 ha (Aug 2025)

Dungarpur–Banswara–Ratlam rail line

A new broad gauge line of about 188 km linking Dungarpur, Banswara and Ratlam, sanctioned at ₹2,083 crore shared 50:50 between Rajasthan and the Railway Ministry. The Lok Sabha was told on 20 August 2025 that about 646 hectares of 1,736 hectares had been acquired and that exact timelines cannot be fixed because of land acquisition, forest clearances and utility shifting (Lok Sabha, August 2025). Indian Infrastructure carried the same hectare figures on 11 August 2026 (Indian Infrastructure), so we found no later progress number.

Source: Lok Sabha, 20 Aug 2025; Indian Infrastructure, 11 Aug 2026

Length

About 188 km

Cost

₹2,083 crore

Land acquired

646 of 1,736 ha

Completion

No date given

Land markets in the blast radius

  • Banswara
  • Dungarpur
Survey and DPR sanctioned · Aug 2025

Neemuch–Banswara–Dahod–Nandurbar line

A survey and detailed project report were sanctioned for a 380 km new line through Banswara (reply of 20 August 2025) (Lok Sabha); in July 2025 the Railway Minister said a DPR would be prepared along with the Dungarpur–Banswara–Ratlam project and that Banswara is not yet on the rail network (ETV Bharat, July 2025). No sanction, cost or schedule for construction was found.

Source: Lok Sabha, 20 Aug 2025; ETV Bharat, 26 Jul 2025

Length

380 km

Stage

Survey and DPR

Cost

Not stated

Construction

Not sanctioned

Land markets in the blast radius

  • Banswara

Agriculture & terrain

Soil, crops & water in Banswara

A black-soil, canal-fed district with higher rainfall than most of Rajasthan, and mining belts to avoid mistaking for farmland.

🌾 Black-soil and canal plains

The CGWB booklet describes black soil mainly in the northern, southern, central and eastern parts, with kharif area of 225,019 hectares and rabi area of 109,419 hectares as on 2011 (CGWB booklet). Canals of the Mahi Bajaj Sagar project, dug wells (15,393 ha), tube and bore wells (3,940 ha) and tanks (3,556 ha) supply irrigation. No crop-wise table was in the documents read.

  • Kharif
  • Rabi
  • Canal-irrigated

⛰️ Red-soil west and mining belts

Red soil lies mainly in the western part (CGWB). The industrial profile records soapstone, manganese, masonry stone, marble and limestone output in 2010-11, and sand extraction of 1,11,200 tonnes (District Industrial Profile). A khasra near a lease or quarry carries different risks from a canal-fed field.

  • Soapstone
  • Manganese
  • Marble

🌊 Mahi basin rivers

The district drains into the Mahi basin through the Mahi and its tributaries Anas, Haran and Chap; only the Mahi and Anas are perennial (CGWB booklet). We found no flood-history report for Banswara, so ask the Tehsildar for the khasra's water-body and flood record.

  • Mahi
  • Anas
  • Haran
  • Chap

💧 Water & rainfall

The CGWB booklet gives normal annual rainfall of 935.5 mm (1971-2010 average) and a stage of groundwater development of 50.70% in its 2009 assessment, with the district classed safe; Kushalgarh block was semi-critical at 76.57% and the other blocks safe at 40.78% to 66.32% (the booklet text elsewhere gives 72.97%, a conflict) (CGWB). The IMD Jaipur report gives a state monsoon normal of 435.6 mm for June to September (IMD, 2025); the two bases differ. The 2024 CGWB state report lists Banswara for sporadic fluoride and nitrate anomalies (CGWB, 2024). The 2009 block data is old; a borewell test matters.

📐 Measurement units

Local units vary by tehsil, so convert every quote to acres or hectares before comparing offers. Statewide, the 2023-24 statistics report mustard on about 40.0 lakh hectares, bajra 42.9 lakh and wheat 31.1 lakh (Agricultural Statistics of Rajasthan 2023-24); no Banswara table was opened. Mandi prices on Agmarknet were not opened, so none is quoted. Price a parcel on location, legal status and water, not on crop yield.

At a glance

Banswara vs. its neighbours

District / beltPrice band* (per acre)Evidence
Banswara (this page)No sourced price seriesComplete Scheduled district; 5,037 sq km; 17,97,485 people (Census 2011)
DungarpurNo sourced price seriesComplete Scheduled district (Tribal Affairs, April 2018); other end of the rail line
PratapgarhNo sourced price seriesComplete Scheduled district (Tribal Affairs, April 2018)
Udaipur and Salumbar beltNo sourced price seriesParts added to Scheduled Areas in 2018; Udaipur district was 49.7% Scheduled Tribe at Census 2011 (DSR 2024)

*No price band is shown because none could be traced to an official or news series. See the Dungarpur page for the other end of the rail line, the Pratapgarh page for the other complete Scheduled district and the Salumbar page for the tribal belt to the north.

Farmhouse plot with boundary stones near Banswara, Rajasthan

District report — Banswara

Farmland India view

Why investors look at Banswara

Five reasoned points, with a plain note that price evidence is thin and the largest projects are still pending.

Canal-fed land in a high-rainfall district

The CGWB booklet gives 935.5 mm of normal rainfall and 59,031 hectares under canals of the Mahi Bajaj Sagar project in 2011-12. Water is the district's clearest agricultural asset, and the data is old.

Two infrastructure items with official papers

The regulator cleared excavation for two atomic power units in March 2026, and the rail line had 37% of its land acquired by August 2025. That is progress, not delivery, so price on today's roads.

A rail gap that projects aim to close

Banswara was reported not yet connected to Indian Railways in July 2025. A new line and a proposed Dahod link would change that, but neither has a completion date.

A Scheduled Area narrows the pool of lawful sellers

Sale of khatedari land by a Scheduled Tribe member to a non-member is void under section 42(b). A clean title chain matters more here than the quoted price.

A market that rewards paperwork

Scheduled Area status, ceiling declarations, conversion permission and acquisition lists are all parcel-specific. A buyer who documents each is better placed than one relying on a broker summary.

Browse reviewed land in Banswara

Confirm Scheduled Area, acquisition and conversion status directly; these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Banswara

Read these before shortlisting in Banswara specifically.

Scheduled Area and section 42

Banswara is a complete Scheduled district, and a sale by a Scheduled Tribe holder to a non-member is void under section 42(b). Read the seller's community from the jamabandi and ask the Collector what Fifth Schedule rules apply.

Land acquisition for the rail line

About 37% of the land for the Dungarpur–Banswara–Ratlam line was acquired by August 2025. A parcel on the alignment can be acquired, and compensation follows the 2013 Act. Check the acquisition list.

Atomic power site restrictions

No restricted zone for the Mahi Banswara site was found. Ask in writing whether a khasra near it carries a limit.

Fluoride, nitrate and old groundwater data

The 2024 CGWB state report lists fluoride and nitrate anomalies in Banswara, and the block categories in the booklet date from 2009. Test borewell water and depth before assuming irrigation or a farmhouse supply.

Mining leases and quarries

Soapstone, manganese, marble and masonry stone are produced in the district. Check the khasra and its boundary for leases or applications.

Thin district data

The district portal opened without a district profile and the tehsil list differs between documents. We did not read the notified revenue-unit list. Confirm tehsil and village names with the Tehsildar.

Announced is not delivered

The rail line has no completion date and the Dahod link is at DPR stage. The atomic power units have only excavation approval. Price on today's fundamentals.

No sourced price series

We use no listing-site prices for Banswara and no district DLC table was reached. Collect registered comparables before negotiating.

Who to contact

Local revenue, planning & registration offices

Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil, under the Sub-Divisional Officer and the District Collector of Banswara. Conversion of agricultural land is decided by the Tehsildar, Sub-Divisional Officer, Collector or State Government depending on use and size (Revenue Department conversion rules). Sale deeds are registered by the Sub-Registrar through the ePanjiyan system (NeGD listing). Land-acquisition entries and Scheduled Area questions go to the Collector's office. The Banswara district portal opened but showed no district profile, and the ePanjiyan, Apna Khata and Revenue Department sites were not opened, so check those directly.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Banswara.

Visit full wiki

01 of 04

What does land cost in Banswara?

We publish no per-acre band for Banswara. No registered-deal series or district DLC table was reached, and listing-site asking prices could not be traced to registered deals. DLC rates were raised about 10% in April 2026 and by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026, Hindi-language report). A DLC rate is a registration floor, not a market price.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: area and population come from a 2013 CGWB booklet and the industrial profile; rainfall, irrigation and block groundwater categories are 2009 to 2012 tables; 2010-11 mineral output is dated; infrastructure statuses were read in October 2026 and change quickly; DLC rates are reported, not read from an official table. Pages marked "not opened" are named only as places to check. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Banswara farmland?

Browse reviewed projects and individual land parcels across Banswara — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.