District guide

Buying Land in Haridwar

Uttarakhand's plains district on the Ganga: the gated 2025 sanction route for outsiders, Roorkee and the SIDCUL belt, flood and groundwater checks, and a Haridwar spur reported about 92% built.

  • 18.90 lakh

    Population (Census 2011)

  • ~2,360 sq km

    Area

  • ~92% built

    Haridwar spur (Jul 2026)

  • State sanction only

    Outsider agricultural land

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

Bhulekh UK — Uttarakhand Land Records Portal

District land record — Haridwar

Rev. 2026 · Farmland India desk

State

Uttarakhand

Sub-divisions

4 tehsils (Haridwar · Roorkee · Laksar · Bhagwanpur) and 6 development blocks (Bhagwanpur, Roorkee, Narsan, Bahadrabad, Laksar, Khanpur), per the Haridwar district portal

Key markets

Haridwar city · Roorkee · Laksar · Bhagwanpur · Bahadrabad · Khanpur

Agricultural land

One of two districts where an outsider can seek state sanction to buy agricultural land (2025 Act); sanction is not automatic

Demand anchors

Pilgrimage city and the 2027 Kumbh · SIDCUL industrial estate at Ranipur · Roorkee · Delhi–Dehradun corridor spur

Rail

Haridwar railway station (the district headquarters is about 12 km from it, per the district portal); other services not sourced here

Size and population

~2,360 sq km · 18.90 lakh people (Census 2011, district portal)

Pricing unit

₹/acre (farmland) · ₹/sq yd (plots)

Local units

Acres, sq yd and sq ft; no local unit is used on this page · 1 acre = 4,840 sq yd

Land records portal

Bhulekh Uttarakhand (confirm access with the Tehsildar)

District overview

Haridwar — the Ganga plains district: pilgrims, factories and farms

Haridwar is the plains district of western Uttarakhand: about 2,360 sq km and 18,90,422 people at the 2011 Census, four tehsils (Haridwar, Roorkee, Laksar and Bhagwanpur) and six development blocks (Haridwar district portal). The district industries profile prints 19,27,029, so read the population as roughly 19 lakh, and lists wheat, rice, maize, mustard, groundnut and oilseeds as the important crops (Haridwar district industrial profile). For a buyer of agricultural land this is the district to study first, because the 2025 Act allows sanctioned purchase here and in Udham Singh Nagar only. Sanction is the gate, so the land question is still a legal one.

The district is two markets. Around Haridwar city and Bahadrabad, land is priced by pilgrimage, industrial and highway demand; in Laksar, Bhagwanpur and Khanpur it is mainly farmland. The SIDCUL Integrated Industrial Estate at Ranipur is listed at 2,034 acres, allotment complete, about 3 km from the Delhi–Haridwar highway (SIDA Uttarakhand), and the district industries profile counted 522 units, ₹8,006.89 crore of investment and 38,261 jobs there in 2011-12 data (Haridwar district industrial profile). That is old, but it shows why worker housing and warehousing land is in demand. We found no sourced price for farmland or for plots near the estate.

Groundwater is the agricultural constraint to understand early. CGWB's 2016 aquifer-mapping report, with resources assessed as on 31 March 2011, describes a three-tier alluvial aquifer system and says the stage of dynamic groundwater development had reached 65% in the study area and 97% in Bhagwanpur, with three semi-critical blocks (CGWB Haridwar report, October 2016). Roorkee is the second centre and gives its name to a tehsil and a block.

Two connectivity points need care. The Delhi–Dehradun corridor was inaugurated on 14 April 2026 (PIB, April 2026). The Haridwar spur, described by Construction World as a 51 km six-lane access-controlled link, was about 92% built in July 2026 (Construction World, July 2026); the Centre had said in April it would be inaugurated in June (NBM&CW, April 2026), and we found no report that it has opened. The 2027 Kumbh is scheduled for 14 January to 20 April 2027 with ten bathing days (The Statesman, November 2025); some outlets call it the Ardh Kumbh.

  • Haridwar
  • Roorkee
  • Laksar
  • Bhagwanpur
  • Bahadrabad
  • SIDCUL Ranipur
  • Ganga channels
  • Rajaji
Locator map of Haridwar district in Uttarakhand showing Haridwar, Roorkee, Laksar, Bhagwanpur and Bahadrabad

Market bands

Sub-area price bands — Haridwar

Sourced benchmarks only. We publish no listing-site asking prices because none could be traced to a registered deal, and no Haridwar collector-rate list was found. See the notes below.

Sub-areaMarket band*DLC / circle rateTrendLand type
Jwalapur/city-adjacent
Jwalapur/city-adjacent₹13,500–45,000/sq yardCheck current DLCStable-risingResidential/converted
Roorkee-Laksar agri belt
Roorkee-Laksar agri belt₹3.8–8 Cr/acre (verify per-parcel)Check current DLCStableAgricultural (discretionary route)
Prime/commercial outliers
Prime/commercial outliersUp to ₹21 Cr/acre reportedCheck current DLCN/A — confirm basisCommercial-adjacent

* Indicative market range compiled from listed inventory and public circle-rate references. Not a valuation, an offer, or a guarantee of transaction price. Verify current DLC / circle rates with the sub-registrar before transacting.

Trend describes a historical movement over the stated period. It is not a projection or a forecast of future prices.

Transaction costs

Stamp duty & registration in Haridwar

5%

Stamp duty — male buyer

sale deed, per the Stamps and Registration fee sheet

3.75% / 5%

Stamp duty — female buyer

3.75% up to ₹25 lakh of value, 5% above

2%

Registration fee

cap to confirm (fee table amended 16 Nov 2025)

The department's fee sheet lists Article 23 sale deeds at 5%, with 3.75% for women up to ₹25 lakh and 5% above (Stamps and Registration fee sheet). The department's notification index, last updated 18 November 2025, records the 5% rate since 31 May 2011 and a 25% women's discount up to ₹25 lakh since 31 July 2017, described as available twice in a lifetime (Stamps and Registration index, November 2025). The same index shows a registration fee table amended on 16 November 2025 to replace ₹25,000 with ₹50,000. We could not tell which item that cap belongs to, so the registration cap is shown as unconfirmed; confirm it with the Haridwar or Roorkee Sub-Registrar before budgeting.

Duty is generally charged on the higher of the deal value and the circle rate; the index records a 2008 rebate for the part of a price above the circle rate, which implies a floor, but we did not find the rule itself. We found no Haridwar circle-rate list: the district portal's collector page describes the district offices but carries no rate list (Haridwar district portal). The October 2025 revision reported by Daily Jagran concerned Dehradun and the statewide average of 15% (Daily Jagran, October 2025); whether Haridwar villages moved by the same amount is unconfirmed. Ask the Sub-Registrar for the village rate. Land-use conversion charges and affidavit costs are extra.

Know the belt

What is moving prices in Haridwar

Price evidence is thin: we publish no listing-site prices, and the documented constraints are legal sanction and groundwater.

Chudiyala Mohanpur and the Bahadrabad belt

No sourced price series

Listing-site figures for farm blocks near Haridwar could not be traced to registered deals, and some print totals in the hundreds of crores that are plainly entry errors, so none is published here. Registered deeds nearby and any compensation award are the evidence to ask for.

Check: the khatauni class, and whether a block this size is farmland or already valued for industrial use.

Laksar, Bhagwanpur, Khanpur farm belt

No sourced price series

This is the belt where water, not price, is the documented constraint: CGWB's 2016 report puts Bhagwanpur at 97% stage of development and notes shallow water levels of about 2 to 4.8 m before the monsoon in Khanpur (CGWB Haridwar report, October 2016). Listings in the farm belt are often quoted in a local unit whose size changes by district, which we do not convert.

Check: the area in acres or sq m from the khatauni, then compute any per-acre price yourself.

Roorkee

No sourced price series

We found no collector rate, registered sale or compensation award for Roorkee land. Prices near highway or commercial frontage reflect that frontage rather than farming, and one listing cannot set a band.

Check: zoning, frontage and whether it is farmland at all.

Industrial-estate effect

No sourced band

The 2,034-acre Ranipur estate shows allotment complete on the state industrial development site (SIDA Uttarakhand), so demand for land near it tends to flow into private plots and warehouses on the surrounding roads. We found no sourced price for those parcels. Sellers use "SIDCUL-adjacent" loosely.

Check: master-plan zoning, access road width and any land-ceiling or conversion order.

Circle rates to check

No Haridwar figures found

We did not locate a Haridwar circle-rate list. The October 2025 revision reported for Dehradun averaged 15% across the state (Daily Jagran, October 2025) but the report does not name Haridwar, so whether Haridwar followed is unconfirmed.

Check: the village rate at the Sub-Registrar or district office.

Units: acres, sq yd and sq ft

Convert every quote using the area on the khatauni: 1 acre = 4,840 sq yd = 43,560 sq ft. Listings in the farm belt often use a local land unit whose size varies by district, and we do not convert it. This page uses acres for farmland and sq yd for plots.

Connectivity

How Haridwar connects — road, rail and air

Distances come from the state industrial-estate page and the district portal; journey times vary with traffic and with Kumbh movements.

By road from Delhi and nearby towns

Delhi~225 km to the SIDCUL estate (SIDA Uttarakhand)
RoorkeeTehsil and block within the district; distance not sourced
Dehradun~52 km to the SIDCUL estate (SIDA Uttarakhand)
Delhi–Dehradun ExpresswayOpen since 14 Apr 2026; Haridwar spur about 92% built in Jul 2026

By air

Jolly Grant AirportDehradun's airport; distance from Haridwar not sourced here
TerminalPhase II inaugurated 14 Feb 2024 (Indian Infrastructure, February 2024)
Delhi (IGI)Reached by road or by flight from Jolly Grant

By rail & metro

Haridwar stationDistrict headquarters is about 12 km from the railway station (Haridwar district portal)
Roorkee and LaksarServices not sourced here
Rishikesh–Karnaprayag lineFirst train targeted Dec 2028 (reported, Swarajya, March 2026)
MetroNone operating; no sourced construction status for the 2020 proposal

The practical questions are the last leg from the highway and flood exposure. Full rules for buyers from outside the state: Uttarakhand agricultural land rules; the expressway guide is here.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked confirm have a single or dated source.

02Operational

03In progress or planned

Under construction · about 92% (Jul 2026) · confirm opening Haridwar spur of the Delhi–Dehradun corridor
Operational · opened 14 Apr 2026 Delhi–Dehradun Expressway (main corridor)
In progress · 2027 Kumbh runs 14 Jan–20 Apr 2027 Kumbh: roads and bridges
Operational · allotment complete SIDCUL Integrated Industrial Estate, Ranipur
Under construction · about 77% (Jul 2026) Haridwar four-lane bypass, Package I
Under construction · about 92% (Jul 2026) · confirm opening

Haridwar spur of the Delhi–Dehradun corridor

A six-lane, access-controlled spur of about 51 km linking the Delhi–Dehradun corridor, which it leaves near Halgoya in Saharanpur district, with Haridwar. Swarajya gave the cost as ₹1,475 crore and the length as 50.7 km in January 2026 (Swarajya, January 2026). Construction World reported about 92% physical progress, with roughly 46 km built, on 6 July 2026, and said NHAI aims to finish well before the 2027 Kumbh (Construction World, July 2026). In April 2026 the Centre said the spur would be inaugurated in June (NBM&CW, April 2026); we found no report that it has opened, so treat the opening as unconfirmed.

Source: Swarajya, 29 Jan 2026; Construction World, 6 Jul 2026; NBM&CW, 15 Apr 2026

Length

~51 km

Cost

₹1,475 crore (Swarajya)

Progress

~92% (Jul 2026)

Status

Opening unconfirmed

Land markets in the blast radius

  • Roorkee
  • Iqbalpur
  • Bahadrabad
  • Haridwar
Operational · opened 14 Apr 2026

Delhi–Dehradun corridor (main line)

A controlled-access highway of about 210 km, inaugurated in Dehradun by the Prime Minister on 14 April 2026. PIB records about ₹12,000 crore invested and a wildlife corridor of nearly 12 km of elevated road (PIB, April 2026), and Construction World reports a drive of about 2.5 hours (Construction World, April 2026). Haridwar benefits only indirectly until the spur opens, because the spur branches off the main corridor near Saharanpur.

Source: PIB, 14 Apr 2026; Construction World, 17 Apr 2026

Length

~210 km (reported)

Inaugurated

14 Apr 2026

Drive time

~2.5 hours (reported)

Spur to Haridwar

~92% built (Jul 2026)

Land markets in the blast radius

  • Roorkee
  • Haridwar
  • Bahadrabad
In progress · 2027 Kumbh runs 14 Jan–20 Apr

2027 Kumbh: roads and bridges

The Statesman reported on 28 November 2025 that the Haridwar Kumbh will run from 14 January to 20 April 2027 with ten bathing days (The Statesman, November 2025); PTI listed the dates on 15 April 2026, including Amrit Snan days on 6 March, 8 March and 14 April (PTI via The Week, April 2026). Some outlets call the event the Ardh Kumbh. Ahead of it NHAI is building the spur and a 15 km four-lane Haridwar bypass (Construction World, July 2026). We found no sourced crowd estimate.

Source: The Statesman, 28 Nov 2025; PTI via The Week, 15 Apr 2026; Construction World, 6 Jul 2026

Dates

14 Jan–20 Apr 2027

Bathing days

10

Bypass (Package I)

15 km, ~77% (Jul 2026)

Status

Under construction

Land markets in the blast radius

  • Haridwar
  • Bahadrabad
Operational · allotment complete

SIDCUL Integrated Industrial Estate, Ranipur

A 2,034-acre estate about 3 km from the Delhi–Haridwar highway, listed as allotment complete by the state industrial development site (SIDA Uttarakhand). The district industries profile of 2011-12 data lists the estate at 1,700 acres and counted 522 units, ₹8,006.89 crore of investment and 38,261 jobs (Haridwar district industrial profile). The data is old, so use it as scale, not as a current figure.

Source: SIDA Uttarakhand; district industrial profile (2011-12 data)

Area

2,034 acres

Allotment

Complete

Units (2011-12)

522

Jobs (2011-12)

38,261

Land markets in the blast radius

  • Ranipur
  • Bahadrabad
  • Haridwar
Under construction · about 77% (Jul 2026)

Haridwar four-lane bypass, Package I

A 15 km four-lane highway from Bahadrabad to near the Chandi Devi temple on NH-34, at about 77% physical progress in July 2026 (Construction World, July 2026). The Centre's April 2026 road list gives a Phase 1 greenfield bypass for completion in October 2026 (Indian Infrastructure, April 2026) and a Phase 2 as part of a proposed ring road (NBM&CW, April 2026). Whether the two descriptions are the same package is unclear, so confirm the alignment before pricing any parcel.

Source: Construction World, 6 Jul 2026; Indian Infrastructure, 15 Apr 2026

Length

15 km

Progress

~77% (Jul 2026)

Phase 1 target

Oct 2026 (reported)

Phase 2

Planned (reported)

Land markets in the blast radius

  • Haridwar
  • Bahadrabad

Agriculture & terrain

Soil, crops & water in Haridwar

A flat alluvial district where wheat and rice are the important crops, with groundwater, the Ganga channels and the Shivalik forest edge setting the limits.

🌾 Alluvial plains (Laksar, Bhagwanpur, Roorkee)

The district industries profile records a net area sown of 117,749 hectares (2010-11) and lists wheat, rice, maize, mustard, groundnut and oilseeds as the important crops (Haridwar district industrial profile). We found no soil-class table for the district, so soil type is not stated.

  • Wheat
  • Rice
  • Maize
  • Mustard
  • Groundnut

🌳 Shivalik edge and Rajaji

Rajaji Tiger Reserve covers 1,075 sq km across Dehradun, Haridwar and Pauri Garhwal, with 820.42 sq km of national park (Rajaji Tiger Reserve site). Forest status and eco-sensitive-zone distance decide what can be built here more than soil does.

  • Rajaji
  • Eco-sensitive zone
  • Forest edge

🌊 Ganga channels, aits and waterlogging

In July 2023 the state declared the waterlogged areas of 71 villages in four tehsils disaster-prone, with dues deferred for three months (Outlook, July 2023). CGWB's 2016 report records pre-monsoon depth to water of about 3.5 to 22.7 m south of the Solani in Bhagwanpur and as little as 1.96 m in Khanpur (CGWB Haridwar report, October 2016). Ask for flood and waterlogging history on any low-lying parcel.

  • Ganga
  • Waterlogging
  • Solani
  • Flood history

💧 Water & rainfall

The same CGWB report puts the stage of dynamic groundwater development at 65% across the study area and 97% in Bhagwanpur, notes three semi-critical blocks it does not name in the text we read, and gives a normal annual rainfall of 1,174.3 mm, 84% of it in the monsoon (its own Table 2 prints 1,108 mm) (CGWB Haridwar report, October 2016). Depth to water runs from about 1.7 m to 23 m below ground, and up to 70 m in the Bhabar foothills. The data is dated, so check borewell depth and permission for any parcel.

📐 Measurement units & market prices

Convert every quote using the area on the khatauni. Crop income is a poor guide to land value here, so price a parcel on location, permitted use and water.

At a glance

Haridwar vs. its neighbours

District / beltCollector-rate benchmark*Evidence
Haridwar — districtNo collector-rate list foundDistrict portal checked Oct 2026; no list on the page (Haridwar district portal)
Haridwar — SIDCUL Ranipur estateNo sourced priceAllotment complete (SIDA Uttarakhand); no resale or lease price found
Dehradun — Rajpur Road within 50 m₹68,000 per sq mCollector rate, Oct 2025; non-agricultural (ETV Bharat, October 2025)
DehradunOutsider agricultural purchase barredUttarakhand Act 11 of 2025 (Uttarakhand Act 11 of 2025)
NainitalOutsider agricultural purchase barredUttarakhand Act 11 of 2025 (Uttarakhand Act 11 of 2025)

* Collector rates are government benchmarks used for stamp duty, not market prices. Haridwar is one of two districts where an outsider can seek state sanction to buy agricultural land, so a Haridwar parcel may be legally buyable where a similar Dehradun parcel is not. See the Dehradun page and the Udham Singh Nagar page for the other district with that route.

Fenced farmhouse plot with boundary stones beside sugarcane and a canal near Haridwar, Uttarakhand

District report — Haridwar

Farmland India view

Why investors look at Haridwar

Five reasoned points, with an honest note that the sanction rules need a written answer and no price series is sourced.

The district where sanctioned purchase is possible

Haridwar and Udham Singh Nagar are the only districts where an outsider can seek sanction to buy agricultural land under Act 11 of 2025, so a non-resident buyer may have a route here that does not exist in Dehradun or Nainital. It needs prior state sanction, an affidavit and use for the stated purpose, so the advantage is a path, not a guarantee.

Industrial demand

A 2,034-acre industrial estate at Ranipur, listed as allotment complete (SIDA Uttarakhand), gives steady demand for housing, warehousing and services that does not depend on pilgrims alone.

Delhi reach that is improving

The corridor has been open since April 2026 and the Haridwar spur was about 92% built in July 2026 (Construction World, July 2026). Until the spur opens the benefit is indirect; price on today's roads.

Irrigated plains with a water limit

CGWB describes a three-tier alluvial aquifer system, but also a 97% stage of development in Bhagwanpur (CGWB Haridwar report, October 2016), so water is both an asset and a constraint. Crop income is a poor guide to land value, so the case rests on location and permitted use.

A pilgrimage anchor with a 2027 peak

The Kumbh runs from 14 January to 20 April 2027 (The Statesman, November 2025), and the city draws visitors in other years. Crowd-driven demand is cyclical.

Browse reviewed land in Haridwar

Confirm the sanction route, land class, flood and forest status directly; these are not certified by Farmland India's review.

Risks & challenges in Haridwar

Read these before shortlisting in Haridwar specifically.

Sanction is the real question

Haridwar is a gated route: prior state sanction, an affidavit and use for the stated purpose. Do not pay a large advance before you know what approval the parcel needs and how long it takes.

Conditions after purchase

A change of use makes the transfer void, and the period for putting the land to its stated use runs from registration of the deed. Ask for the written rule that applies to your purchase, including any ceiling on area.

Ganga floods and waterlogging

In July 2023 the waterlogged areas of 71 villages in four tehsils were declared disaster-prone. Check flood history, canal reserves and drainage for any low-lying parcel.

The spur opening is unconfirmed

The Haridwar spur was about 92% built in July 2026 and the Centre had pointed to a June inauguration; we found no report that it has opened. Price on today's roads.

Rajaji zone and forest land

The NGT said in 2023 that construction near Rajaji is prohibited or regulated within 1 km outside the forest, and the Supreme Court has told states to notify eco-sensitive zones around tiger reserves. Confirm the distance to the boundary and any forest land in the khasra.

Groundwater pressure

CGWB put Bhagwanpur at 97% stage of groundwater development in its 2016 report. Check borewell depth and permission, and ask for recent readings.

Zoning claims near the industrial estates

"Industrial-zone" and "SIDCUL-adjacent" are marketing phrases. Ask for the zoning, the khatauni class and any allotment letter.

Who to contact

Local revenue, planning & forest offices

Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil (Haridwar, Roorkee, Bhagwanpur or Laksar, per the Haridwar district portal); the district headquarters is at Roshnabad. Sanction for an outsider's agricultural purchase sits with the state government, so ask the Sub-Registrar which department receives the application. Building and layout approvals sit with the Haridwar Roorkee Development Authority inside its area, and the Forest Department confirms forest status and distance from Rajaji.

Sale-deed registration is handled by the Sub-Registrar, who also holds the village collector-rate list. Khasra and khatauni records are on the state's Bhulekh portal, which we could not open, so ask the Tehsildar how to obtain a certified copy. The Irrigation Department can say whether a parcel is on a canal reserve or in a flood zone.

DEVELOPER PROJECTS · TRUST SCORE

Reviewed projects in Haridwar

Developer projects carry the platform Trust Score and a reviewed document set.

Reviewed projects have completed Farmland India's document and site review. Individual land parcels are listed by their owners and are not reviewed to the same standard. Always complete your own legal due diligence.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Haridwar.

Visit full wiki

01 of 04

Can an outsider buy agricultural land in Haridwar?

Only through a state-sanction route. Under Uttarakhand Act 11 of 2025, in force from 1 May 2025, a person who is not already a tenure holder or owner in the state can buy agricultural or horticultural land only in Haridwar and Udham Singh Nagar, with prior state government sanction and an affidavit that the land will be used for that purpose; a change of use makes the transfer void. We found no official timeline for sanction, so ask the Sub-Registrar what the parcel needs.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: census figures reflect 2011, the latest full Census; district industrial data is from 2011-12 and the groundwater assessment from 2011. The 2025 amendment was read from a scanned copy of the Act and from press reports; the gazette copy was not opened. Infrastructure statuses were read in October 2026 and change quickly. We publish no listing-site prices. The sanction procedure, the area ceiling and the period for putting land to use, the registration-fee cap and the Haridwar collector rates are unconfirmed. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Haridwar farmland?

Browse reviewed projects and individual land parcels across Haridwar — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.