Farmland India
Aerial view of agricultural land and farm fields near Barmer, Rajasthan

District guide

Buying Land in Barmer

A dryland border district in western Rajasthan: bajra farming, little irrigation, minerals and oil, a refinery next door in Balotra and no sourced price series.

  • About 18,792 sq km

    Reporting area, 2023-24

  • 27.71% of sown area

    Net irrigated, 2023-24

  • 134.86 km, Rs 1,237.71 crore

    NH-70 and NH-11 project

  • Inaugurated 4 Jul 2026

    Pachpadra refinery (Balotra)

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary โ€” every listing states the unit it is priced in. Not a valuation or an offer.

Apna Khata โ€” Rajasthan Land Records Portal

District land record โ€” Barmer

Rev. 2026 ยท Farmland India desk

State

Rajasthan

Sub-divisions

Current tehsil list not sourced. The older industrial survey, from when the district still included Balotra, lists 4 sub-divisions (Barmer, Balotra, Shiv, Gudamalani) and 8 tehsils (MSME survey, data to 2012). Barmer and Balotra now have 12 and 9 panchayat samitis (Patrika, January 2025).

Key markets

Barmer town ยท Chohtan ยท Shiv ยท Gudamalani ยท Ramsar

Demand anchors

Border and defence district ยท dryland bajra farming ยท minerals and lignite ยท a refinery complex at Pachpadra in neighbouring Balotra district ยท border highway and rail projects still pending

Rail

341 km of line in the pre-2023 district (MSME survey); a Jaisalmer-Bhabhar/Bhildi line via Barmer is at survey stage (Patrika, March 2026)

Size and population

18,79,225 hectares of reporting area, about 18,792 sq km, in 2023-24 (Directorate of Economics and Statistics). The older survey gives 28,387 sq km and 26,04,453 people for the district before Balotra was separated, so those two figures are not used for today's boundary

Pricing unit

โ‚น/acre or โ‚น/hectare (farmland) ยท โ‚น/sq yd (plots)

Local units

Local land units vary by tehsil and village in Rajasthan; this page quotes acres and hectares only

Land records portal

Revenue land-records system (Apna Khata / eDharti) (NeGD listing); not opened for this page

District overview

Barmer โ€” a dryland border district beside a new refinery

Barmer is a western Rajasthan district with 18,79,225 hectares of reporting area in 2023-24, which is about 18,792 sq km (Directorate of Economics and Statistics). The 2023 reorganisation separated Balotra, so older documents describe a bigger district: the MSME survey gives 28,387 sq km and 26,04,453 people, with 8 tehsils, 341 km of railway and 7,494 km of roads (MSME survey, data to 2012). Barmer now has 12 panchayat samitis and 422 gram panchayats, Balotra nine and 266 (Patrika, January 2025).

We publish no per-acre price band for Barmer. No district rate series or registered-deal data could be traced, and listing-site asking prices cannot be linked to registered deals. The statewide DLC revisions are the only dated reference: up to 50% for irrigated rural land in December 2024 (Patrika, December 2024), about 10% in April 2026 and 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026). We found no Barmer village list for the August revision.

Barmer is dryland first. Net irrigated area was 27.71% of net sown area in 2023-24, and bajra took 44.86% of cropped area (Directorate of Economics and Statistics). The older survey gives average rainfall of 277 mm a year. The big new fact is next door: a refinery complex at Pachpadra, in Balotra district, was reported inaugurated on 4 July 2026 (Indian Infrastructure, July 2026). The same reports place the plant in Balotra, not Barmer.

  • Barmer
  • Chohtan
  • Shiv
  • Gudamalani
  • Ramsar
  • Border district
Locator map of Barmer district in Rajasthan

Transaction costs

Stamp duty & registration in Barmer

Up to 20%

Surcharge on stamp duty

cow-protection surcharge, s.3-B Rajasthan Stamp Act 1998; cap raised from 10% in 2018

DLC

Valuation basis

Patrika reported in August 2026 that duty and fee follow DLC rates

Not traced

Base duty and registration fee

no official page or news report found for the sale-deed rates

The surcharge cap was raised from 10% to 20% by the Rajasthan Stamp (Amendment) Bill, 2018 (PRS, Bill 18 of 2018; The Tribune, September 2018). The rate notified today is not confirmed, and the base stamp duty and registration fee for a sale deed could not be traced, so none is quoted. Deeds are registered through the Registration and Stamps Department's ePanjiyan system (NeGD listing). DLC rates were raised by up to 50% for irrigated rural land in December 2024, with agricultural registration moving to hectares (Patrika, December 2024), by about 10% in April 2026 and by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026). Since July 2024 Rule 57 of the Stamp Rules lets the registering officer inspect the land and value open land and structures separately (TeamLease RegTech, July 2024). We found no Barmer village-level DLC list, so no district rate is quoted. Take the current schedule from the Sub-Registrar.

Know the belt

What is moving prices in Barmer

No district rate series was found. The notes below separate what is dated and official from what is not available.

Statewide DLC revisions

Up to 50% (Dec 2024) ยท +10% (Apr 2026) ยท 5-49% in listed areas (3 Aug 2026)

DLC rates for irrigated rural land rose by up to 50% in December 2024 and agricultural registration moved to hectares (Patrika, December 2024). Rates rose about 10% in April 2026 and by 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026; the report is not in English). We did not find which Barmer villages were listed.

Check: the DLC rate for the village in force on the deed date.

Asking prices

No sourced price series

Listing-site asking prices for Barmer could not be traced to registered deals, so none are shown. The DLC rate is a registration floor, not what a seller will accept.

Check: registered sale deeds in the same revenue estate before negotiating.

Dryland farming

Net irrigated 27.71% of net sown area (2023-24)

Net sown area was 11,70,281 hectares, net irrigated area 3,24,285 hectares and gross cropped area 14,99,207 hectares; bajra took 44.86% of cropped area (Directorate of Economics and Statistics). A parcel without a water source is a rain-fed bajra field.

Check: the water source, and whether the land is irrigated in the record.

Border and mineral land

No sourced rule or lease list

The district sits on the border and holds gypsum, lignite and other minerals (MSME survey; Patrika, March 2026). We found no village-level restriction or lease list, so none is described.

Check: with the Collector's office and the Mines Department for the specific khasra.

Units: acres and hectares

Rajasthan land is sold in local units that vary by district and tehsil, so convert every quote into acres or hectares and confirm the share of the khasra being sold. Agricultural registration in the state moved to hectares in December 2024 (Patrika, December 2024). Ask the patwari which local unit a seller means.

Connectivity

How Barmer connects โ€” road, rail and air

Distances to Jodhpur, Jaisalmer and Delhi are not given because no official or news source was found. Journey times vary with traffic and road works.

By road

NH-25Jodhpur-Pachpadra-Barmer road named in a 2022 report (NBM&CW, December 2022)
NH-70 and NH-11 project134.86 km, Rs 1,237.71 crore approved, covering Barmer and Jaisalmer (Mar 2025)
Ghagaria-Munabao roadRs 235.15 crore upgrade approved Dec 2022; single-lane then
DistancesJodhpur, Jaisalmer, Delhi: not sourced

By air

Airport in the districtNone named in any source read
Nearest airportDistance and schedules not sourced

By rail

Rail line in the older district341 km (MSME survey)
Jaisalmer-Bhabhar/Bhildi via Barmer380 km; final location survey (Mar 2026)
Anupgarh-Barmer lineMinister said work is progressing; no length or cost given
MetroNone found in the sources read

The practical question is the last leg from the highway to the parcel; ask for the access road in the revenue record. Full Rajasthan rules for buyers from outside the state: Rajasthan agricultural land rules.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked confirm have a single or an older source.

01Open or inaugurated

03In progress or pending

Inaugurated ยท 4 Jul 2026 ยท in Balotra district Pachpadra refinery complex (neighbouring Balotra)
Approved Mar 2025 ยท progress not found NH-70 and NH-11 two-lane project (Jaisalmer-Barmer)
Approved Dec 2022 ยท completion not found NH-25 extension, Ghagaria-Munabao
Final location survey (Mar 2026) Jaisalmer-Bhabhar/Bhildi rail line via Barmer
Inaugurated ยท 4 Jul 2026 ยท in Balotra district

Pachpadra refinery complex (neighbouring Balotra)

Indian Infrastructure reported on 6 July 2026 that a greenfield refinery-cum-petrochemical complex at Pachpadra, in Balotra district, was inaugurated on 4 July 2026. It is a joint venture with the Government of Rajasthan, with 9 million tonnes a year of refining, 2.4 million tonnes of petrochemicals and a reported cost of Rs 794.59 billion (Indian Infrastructure, July 2026). The report places the plant in Balotra and does not mention Barmer. It is a neighbouring-district anchor, not a Barmer asset, and no effect on Barmer land values is sourced. See the Balotra page.

Source: Indian Infrastructure, 6 Jul 2026

Refining

9 mtpa

Petrochemicals

2.4 mtpa

Cost

Rs 794.59 bn

District

Balotra

Land markets in the blast radius

  • Balotra
  • Barmer
Approved Mar 2025 ยท progress not found

NH-70 and NH-11 two-lane project (Jaisalmer-Barmer)

NBM&CW reported on 29 March 2025 that the Union road transport minister had approved a two-lane project of 134.86 km on NH-70 and NH-11 near the Pakistan border, costing Rs 1,237.71 crore and covering Barmer and Jaisalmer. Works include strengthening and widening of NH-70 and NH-11, the Myajlar-Jaisalmer section and the Sundara-Myajlar-Ambasingh Ki Dhani road on the Munabao-Tanot route (NBM&CW, March 2025). We found no later report on award or progress.

Source: NBM&CW, 29 Mar 2025

Length

134.86 km

Cost

Rs 1,237.71 crore

Status

Approved

Progress

Not found

Land markets in the blast radius

  • Barmer
  • Jaisalmer
Approved Dec 2022 ยท completion not found

NH-25 extension, Ghagaria-Munabao

NBM&CW reported on 21 December 2022 that a Rs 235.15 crore rehabilitation and upgrade of the Ghagaria-Munabao section in Barmer to two lanes with paved shoulders had been approved. The road links Munabao to the district headquarters and was then single-lane (NBM&CW, December 2022). We found no report that it is complete.

Source: NBM&CW, 21 Dec 2022

Cost

Rs 235.15 crore

Design

2-lane, paved shoulder

Approved

Dec 2022

Completion

Not found

Land markets in the blast radius

  • Barmer
Final location survey (Mar 2026)

Jaisalmer-Bhabhar/Bhildi rail line via Barmer

Patrika reported on 19 March 2026 that a 380 km line from Jaisalmer to Bhabhar or Bhildi via Barmer was at final location survey stage, with no cost stated, and that the Railway Minister said work on an Anupgarh-Barmer line was progressing rapidly, again with no length, cost or date (Patrika, March 2026). Both are survey-stage or unquantified; a sanction was not found.

Source: Patrika, 19 Mar 2026

Length

380 km

Stage

Final location survey

Cost

Not stated

Anupgarh-Barmer

No figures

Land markets in the blast radius

  • Barmer
  • Jaisalmer

Agriculture & terrain

Soil, crops & water in Barmer

A dryland district of bajra, with a quarter of net sown land irrigated, saline and fluoride-prone groundwater in places, and minerals under the sand.

๐ŸŒพ Crops

In 2023-24 net sown area was 11,70,281 hectares and gross cropped area 14,99,207 hectares; bajra took 44.86% of cropped area, rapeseed-mustard 0.68% and wheat 0.13% (Directorate of Economics and Statistics). The older survey lists wheat, guar, til, moth, moong, bajra and isabgol among the crops (MSME survey). Crop shares for guar and others were not read district-wise.

  • Bajra
  • Guar
  • Moth
  • Moong

๐Ÿ’ง Irrigation

Net irrigated area was 3,24,285 hectares in 2023-24, or 27.71% of net sown area (Directorate of Economics and Statistics). The older survey leaves its irrigation table blank. We found no sourced split between canal and well irrigation for the present district, so ask which source serves a parcel and whether the right to water is recorded.

  • Rain-fed
  • Wells
  • Canal (to confirm)

โ›๏ธ Minerals and oil

The older survey lists gypsum, bentonite, granite, silica sand and lignite, and mentions a large onshore oil field (MSME survey). A mineral or petroleum lease on the land can affect use and compensation, and no village list was found.

  • Gypsum
  • Lignite
  • Bentonite
  • Oil

๐Ÿ’ง Water & rainfall

The older survey gives average rainfall of 277 mm a year (MSME survey). IMD's June-September normal for west Rajasthan is 283.6 mm, against 435.6 mm for the state (IMD Jaipur, 2025). CGWB's 2024 report lists Barmer among districts with sporadic samples above limits for electrical conductivity, fluoride, nitrate and uranium (CGWB, 2024); it gives statewide extraction of 149.86% with 214 of 302 units over-exploited and no Barmer unit table that we could read. Test the borewell water for the parcel and check yield and permission.

๐Ÿ“ Measurement units

Rajasthan local land units vary by district and tehsil, so convert every quote to acres or hectares before comparing offers. Mandi prices are published on the national agricultural marketing portal, which was not opened for this page; price a parcel on its water, access and permitted use rather than on bajra yield.

At a glance

Barmer vs. its neighbours

District / beltPrice band* (per acre)Evidence
BarmerNo sourced price seriesNo figure used on this page
BalotraNo sourced price seriesPachpadra refinery complex reported inaugurated 4 Jul 2026 (Indian Infrastructure); no price figure used
JaisalmerNo sourced price seriesOn the NH-70 and NH-11 project and the Bhabhar/Bhildi rail survey (NBM&CW; Patrika)
JodhpurNo sourced price seriesJodhpur-Pachpadra-Barmer is the NH-25 route named in a 2022 report (NBM&CW); no price figure used

*No price band is shown because none could be traced to an official or news series. See the Balotra page, the Jaisalmer page, the Jodhpur page and the Jalore page for the neighbouring markets.

Farmhouse plot with boundary stones near Barmer, Rajasthan

District report โ€” Barmer

Farmland India view

Why investors look at Barmer

Five reasoned points, with an honest note that the price evidence is thin and the catalysts are pending.

A refinery next door

A large refinery complex was reported inaugurated at Pachpadra in Balotra in July 2026. It is a regional anchor, but we found no sourced effect on Barmer land and the plant is not in Barmer.

Border infrastructure in the pipeline

A Rs 1,237.71 crore highway project and a Rs 235.15 crore road upgrade were approved, and a 380 km rail line is at survey. None is shown as complete, so price on today's roads.

Large reporting area, little irrigation

Barmer has about 18,792 sq km of reporting area but only 27.71% of net sown land is irrigated. Water is the scarce input and the one to verify.

Minerals and oil beneath

Gypsum, lignite and an onshore oil field are listed in the older survey. They add upside for some areas and lease risk for others.

A market that rewards paperwork

With district-boundary, border, lease and DLC questions all parcel-specific, a buyer who documents each one is better placed than one relying on a broker summary.

Browse reviewed land in Rajasthan

Confirm khatedar class, border or lease status and Section 90A conversion directly; these are not certified by Farmland India's review.

STRAIGHT TALK

Risks & challenges in Barmer

Read these before shortlisting in Barmer specifically.

District-boundary confusion

Balotra was separated from Barmer in the 2023 reorganisation. Older documents describe the larger district, so check which district and Sub-Registrar office a village falls under.

Border and defence land

Barmer borders Pakistan and its headquarters hosts military bases. We found no sourced purchase rule, so ask the Collector's office in writing about any restriction.

Mining and petroleum leases

Gypsum, lignite, bentonite and oil are recorded in the district. Ask whether a lease or licence covers the khasra.

Water quality and supply

Barmer is listed for sporadic fluoride, nitrate, uranium and salinity exceedances. Test the water and check the borewell yield before assuming irrigation or a farmhouse supply.

Tribal-land sale bar

Section 42 voids a sale of khatedari land by an SC or ST member, including the Saharia tribe, to someone outside the community. Establish the seller's community before any advance.

Announced is not delivered

The border highway and rail projects were approved or at survey stage when reported. Price on today's fundamentals.

No sourced price series

We use no listing-site prices for Barmer, and DLC rates are only a floor. Collect registered comparables before negotiating.

Who to contact

Local revenue, planning & forest offices

Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil, under the District Collector; the current Barmer tehsil list was not sourced, so confirm which tehsil a village falls under. Sale-deed registration is handled by the Sub-Registrar under the ePanjiyan system, which feeds eDharti land records for agricultural deeds (NeGD listing). Conversion of rural agricultural land is decided by the Tehsildar, Sub-Divisional Officer, Collector or State Government depending on use and size (Rule 9, 2007 rules, 2019 compilation). The Mines Department is the office to ask about mineral leases. The Revenue Department portal, ePanjiyan and the Barmer district portal page we opened carried no office detail, so take office locations and jurisdiction maps from the department directly.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Barmer.

Visit full wiki

01 of 04

What does agricultural land cost in Barmer?

We publish no per-acre band for Barmer because no district rate series could be traced and listing-site asking prices cannot be linked to registered deals. The only dated reference points are statewide: DLC rates rose by up to 50% for irrigated rural land in December 2024 (Patrika), about 10% in April 2026 and 5% to 49% in listed areas from 3 August 2026 (Patrika, August 2026). We found no Barmer village list, so check the village's DLC rate at the Sub-Registrar.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: sources were read in October 2026. The industrial survey is undated, carries data to 2012 and describes the district before Balotra was separated; cropping and irrigation figures are from the 2023-24 agricultural statistics. The Apna Khata and ePanjiyan portals, the Revenue Department site and the India Code text of the Land Revenue Act and the Stamp Act could not be opened, so nothing here is attributed to a reading of them. DLC rates, court orders and project timelines change often. General information, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Barmer farmland?

Browse reviewed projects and individual land parcels across Barmer โ€” or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction โ€” including verification of land records, encumbrance searches, approvals and regulatory compliance โ€” through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.