Farmland India
Red-soil farm plots with finger millet and vegetables, coconut palms and a distant hill on the edge of Bengaluru, Karnataka

Area guide

Buying Land in Attibele

Land at Attibele, on the Tamil Nadu border in Anekal taluk: KIADB industrial land, a ring-road link to Hosur and a metro extension still at DPR stage.

  • 643 acres, final (Dec 2025)

    SWIFT City notice

  • 10.5 km, 9 stations, DPR approved

    Metro extension

  • Hoskote–Hosur 20.9 km

    STRR section

  • ₹3 crore per acre (Dec 2025)

    Compensation offered

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

Micro-market record — Attibele

Rev. 2026 · Farmland India desk

District

Bengaluru Urban (Anekal taluk)

Corridor

Hosur Road (NH-44); STRR Hoskote–Hosur section; Yellow Line extension planned along Hosur Road

Rail

Bengaluru–Hosur line passes the Anekal side (Indian Railways network)

Terrain

Dry red-soil plateau with scattered tanks

Distance

At the Tamil Nadu border; Hosur is about 12 km beyond (Deccan Herald, Oct 2025)

Groundwater

Bengaluru Urban is among five districts with heavy extraction (CGWB 2024 as reported)

Land price

Check registered deeds and the guidance value

Sub-area overview

Attibele — the Hosur Road border town, where industrial land and acquisition notices shape the farm market

Attibele is the last Karnataka town on Hosur Road before the Tamil Nadu border, in Anekal taluk of Bengaluru Urban district. It has long been an industrial town, and the land around it is now being pulled in three directions: industrial acquisition for the SWIFT City project, a ring road that meets the border, and a metro extension that has only reached the design stage. Farmland buyers who come here are usually looking for small plots, a few acres for a weekend farm, or land they hope will gain from the border corridor.

The most concrete event is acquisition. KIADB issued a final notification for 643 acres for SWIFT City in Sarjapur hobli, between Attibele and Sarjapur, and initial compensation was ₹3 crore per acre; farmers called it too low and the government said it would raise it (Deccan Herald, 10 Dec 2025[6]). That figure is a government compensation rate, not a market price, and the page does not treat it as one. If your survey number lies in or beside the notified villages, a sale may be blocked or the compensation may go to the old owner.

Check registered deeds and the guidance value rather than a price band. Ask the sub-registrar for recent registered sale values in the village you are looking at. Read the Bengaluru Urban district page, the Sarjapur page and the NRI land-buying guide first. NRIs and OCIs cannot acquire agricultural land, a farmhouse or a plantation except by inheritance.

  • Tamil Nadu border
  • KIADB land
  • Ring-road link
  • Metro at DPR
  • NRI barred
Locator map of Bengaluru Urban district, Karnataka

Connectivity

How Attibele connects

Hosur Road (NH-44) is the spine. Distances are approximate and should be checked on the ground.

By road and rail

Bengaluru cityOn Hosur Road; a long drive from the centre, heavy at peak hours (approximate, not route-checked)
HighwayHosur Road (NH-44) towards the Tamil Nadu border
BorderTamil Nadu border at Attibele; Hosur is about 12 km beyond
RailBengaluru–Hosur line on the Anekal side
Ring roadSTRR Hoskote–Hosur section, 20.9 km, nearly finished in April 2026
MetroYellow Line extension to Attibele at DPR stage; not built

Read this before relying on distances

Distances here are approximate and not route-checked. Hosur Road traffic is heavy at peak hours, so test your own drive. The ring road, metro and industrial items below are at different stages, and only the notified land is a firm event.

Growth catalysts

Upcoming infrastructure & developments

Industrial acquisition, a ring-road link and a metro extension each have a different status. Check each source before you act.

01Industrial land

643 acres, final notice

02Transport links

Ring road near; metro at DPR

Acquisition under way · final notice for 643 acres
Nearly complete · opening was expected by June 2026
DPR approved · construction not reported
Acquisition under way · final notice for 643 acres

SWIFT City (KIADB industrial land)

KIADB planned the park in six villages between Attibele and Sarjapur: Bikkanahalli, S Medahalli, Adigara Kallahalli, Sollepura, Muthanallur Amanikere and Handenahalli (Deccan Herald[7]). By 10 December 2025 a final notification covered 643 acres, with ₹3 crore per acre offered initially (Deccan Herald, 10 Dec 2025[6]).

Source: Deccan Herald, 10 Dec 2025. Revised compensation not stated.

Final notification

643 acres

Initial compensation

₹3 crore per acre

Hobli

Sarjapur, Anekal taluk

Land markets in this catalyst

  • Attibele
  • Sarjapur
  • Handenahalli
Nearly complete · opening was expected by June 2026

STRR Hoskote–Hosur section

The Hoskote–Hosur section of the Satellite Town Ring Road is 20.9 km. In April 2026 about 650 metres remained, mostly a rail overbridge near Lingadeeramallasandra awaiting railway clearance, and it was expected to reach the Tamil Nadu border by June 2026 (OneIndia, 9 Apr 2026[8]).

Source: OneIndia, 9 Apr 2026. Check NHAI for the current status.

Section length

20.9 km

Remaining (Apr 2026)

About 650 metres

Full STRR

280.8 km, about ₹17,000 crore

Land markets in this catalyst

  • Attibele
  • Anekal
  • Hosur Road
DPR approved · construction not reported

Yellow Line extension to Attibele

BMRCL has submitted a feasibility study for a 10.5 km extension of the Yellow Line from Bommasandra to Attibele with 9 stations along Hosur Road, and the state has approved DPR preparation, with tenders for the DPR expected (OneIndia, 13 Aug 2026[9]). A through metro link to Hosur was reported as technically not feasible by BMRCL in October 2025 (Deccan Herald, 21 Oct 2025[10]).

Source: OneIndia, 13 Aug 2026; Deccan Herald, 21 Oct 2025. Cost not stated.

Length

10.5 km

Stations

9 proposed

Stage

DPR approved

Land markets in this catalyst

  • Attibele
  • Hosur Road

Agriculture & terrain

Soil, crops & water in Attibele

Dry-land farming and small holdings on the Karnataka–Tamil Nadu border, with groundwater stress across the district.

Soil & crops

Farming here is mostly rain-fed or borewell-irrigated, with ragi, vegetables, flowers, fruit and fodder as the common crops across Bengaluru Urban. The belt along Hosur Road has been steadily taken by industry, so working farms are in the interior villages.

  • Ragi
  • Vegetables
  • Flowers
  • Fruit
  • Fodder

Water

A Deccan Herald report on CGWB 2024 data lists Bengaluru Urban among five Karnataka districts with heavy groundwater extraction (Deccan Herald[5]). Ask for the borewell record and test yield first for the category for Anekal taluk was.

Industrial neighbours

KIADB says land in older parks such as Bommasandra, Jigani, Attibele and Veerasandra has run out, which is why it is acquiring farmland nearby. Expect industrial notices and water-use conflicts near the border.

Farm plot in Bengaluru Urban district

Micro-market report — Attibele

Farmland India view

Why buyers look at Attibele

Why buyers look at Attibele, stated with the evidence we have. Not a price forecast.

Border position

Attibele sits at the Karnataka–Tamil Nadu border, so the land is valued for industry and logistics demand, not only for housing.

A ring road that is nearly closed

The STRR Hoskote–Hosur section was close to complete in April 2026, which makes the border corridor easier to reach if it has opened.

A metro plan on the same road

The Yellow Line extension has an approved DPR. It is a plan, but it signals that the state expects growth along Hosur Road.

Government compensation as a floor, not a price

The ₹3 crore per acre offer is a compensation rate for notified land. It is a useful reference for comparison, not a price you can expect to pay or receive.

Browse reviewed land in Attibele

Listing data is not legal advice. Confirm title, conversion and master-plan status with the sub-registrar and the planning authority.

STRAIGHT TALK

Risks & challenges specific to Attibele

Specific to this micro-market, beyond the Bengaluru Urban and Karnataka-wide points.

Notified land and compensation disputes

A final notification covering 643 acres for SWIFT City is in force, and farmers have protested the compensation. A notified survey number cannot be freely sold and compensation goes to the recorded owner at the notification date. Ask KIADB and the Deputy Commissioner whether the survey number is covered.

Border and approach issues

Land near the state border can sit in a different tax and rule environment from the Hosur side. Keep to Karnataka revenue records and confirm the village is in Anekal taluk.

Planned projects that may not arrive

The metro extension has only a DPR approval and the ring-road opening date slipped past its February 2025 deadline (OneIndia[8]). Do not pay a premium for a project that has not been built.

Conversion and master-plan route

Under the 2025 Land Revenue rules, land inside a master-plan zone with a matching use needs a planning-authority certificate and no Deputy Commissioner permission. Outside it, the Deputy Commissioner decides within 15 days, with deemed approval after 30, and unauthorised conversion can draw a penalty up to ₹1 lakh plus ₹2,500 a day (Cyril Amarchand Mangaldas, Nov 2025[3]). Ask which route applies to your survey number.

Granted land and PTCL

Land granted to Scheduled Caste and Scheduled Tribe families under the 1978 PTCL Act cannot be sold without prior government permission, and the 2023 amendment removed the time limit for challenges (PRS: 2023 amendment Bill[2]). Trace the grant history of older survey numbers.

Record mismatches

Mismatches between the RTC (Record of Rights, Tenancy and Crops), the survey sketch and the registered deed are a common source of disputes. Check the Bhoomi RTC and mutation history, and the Kaveri encumbrance certificate, for the survey number you are buying.

Groundwater stress

Karnataka-wide extraction was 68.44% in the CGWB 2024 assessment as reported, and several Bengaluru-region districts are named for heavy use (Deccan Herald[5]). Ask for the borewell yield history before planning any irrigated use.

Registration cost and guidance value

Press reports put stamp duty at 5% plus about 0.6% cess and the registration fee at 2% since 31 August 2025, around 7.6% in all (Deccan Herald, 30 Aug 2025[4]). A statewide guidance-value revision was discussed for April 2026 (Deccan Herald[11]). Confirm both with the sub-registrar.

NRIs and OCIs cannot buy this land

The RBI Master Direction bars NRIs and OCIs from acquiring agricultural land, a farmhouse or a plantation except by inheritance (RBI Master Direction[1]). A family-office or company route needs separate advice.

KEEP EXPLORING

Explore more areas

Other areas in Bangalore

Back to Bangalore

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Attibele.

Visit full wiki

01 of 04

Can I buy agricultural land at Attibele?

Residents can, within the Karnataka ceiling, because the 2020 amendment dropped the farmer-only and income tests. NRIs and OCIs cannot buy agricultural land, a farmhouse or a plantation except by inheritance.

Transparency

Sources for this page

Law and courts

News and analysis

Information is current to November 2026. Project status, the guidance value and land rules change often, so check the linked source and the sub-registrar before relying on any figure. See the Bengaluru Urban page and the Karnataka page.

For developers

Ready to explore Attibele farmland?

Browse reviewed projects and individual land parcels across Attibele — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.