Farmland India
Green hillside farmland with a two-lane road and forested ridge near Trimbakeshwar in Nashik district, Maharashtra

Area guide

Buying Land in Nashik–Trimbak

Agricultural land on the Nashik–Trimbak corridor, estimated at ₹0.5–2.5 crore per acre*: Kumbh road works, section 63, tribal-area checks and groundwater.

  • ₹0.5–2.5 cr/acre*

    Estimated price*

  • 132.09 ha

    Highway land

  • 66 km

    Outer ring road

  • About 30 km

    Distance from Nashik

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

Micro-market record — {{Nashik–Trimbak}}

Rev. 2026 · Farmland India desk

District

Nashik (Nashik, Trimbakeshwar and Igatpuri talukas on the corridor; confirm the taluka per village)

Corridor

Nashik–Trimbakeshwar road, the Ghoti–Pegalwadi–Trimbakeshwar highway widening and the Nashik outer ring road for the 2027 Simhastha Kumbh

Rail

Nashik Road is the main station; nearest station to be confirmed (Indian Railways)

Terrain

Western Ghats edge: hills, forest and rain-fed fields around Trimbak; plain farmland near Nashik

Distance from Nashik

About 30 km to Trimbakeshwar (approximate, not route-checked)

Groundwater

Older CGWB Nashik profile: stage of extraction 49.33% (31 Mar 2009); current block category to be confirmed

Estimated land price*

₹0.5–2.5 crore per acre*

Sub-area overview

Nashik–Trimbak — the pilgrim corridor from Nashik to Trimbakeshwar, where Kumbh road works decide the next two years

Land on the Nashik–Trimbak corridor is a mix of irrigated farmland near Nashik, hill-edge fields and forest-adjacent plots around Trimbakeshwar, one of the Kumbh pilgrim towns. Buyers are mostly looking at an acre or more for a farmhouse, a weekend plot or a hold near the pilgrim traffic. Our estimate for agricultural land is ₹0.5–2.5 crore per acre*, indicative only, with sharp differences between plots on the main road and interior hill fields.

The 2027 Simhastha Kumbh is driving public works. On 28 June 2026 the Free Press Journal reported that the Ghoti–Pegalwadi–Trimbakeshwar highway widening to four lanes had cleared farmer objections: 132.09 hectares across 671 survey numbers in 23 villages (12 in Igatpuri, 11 in Trimbakeshwar), with ₹1,200 crore sanctioned for the Ghoti–Amboli section. On 20 September 2026 Swarajya reported that the 66 km Nashik outer ring road, costing about ₹7,613 crore, had work started on seven packages with a March 2027 target. A gram sabha at Govardhan had refused consent in January 2026, so land taking is contested.

Treat ₹0.5–2.5 crore per acre* as a rounded estimate and check the Ready Reckoner rate and recent registered deeds. Read the Nashik district page and the state-wise land laws guide first. In Maharashtra an agricultural land buyer must normally be a farmer (section 63 of the Bombay Tenancy and Agricultural Lands Act), and many Trimbakeshwar villages may fall under tribal-area protections, so ask a lawyer before paying a token amount.

  • Kumbh corridor
  • Pilgrim town
  • Hill-edge land
  • Tribal-area check
  • NRI barred
Locator map of Nashik-Trimbak in Nashik district, Maharashtra

Connectivity

How Nashik–Trimbak connects

Nashik–Trimbak runs along the road from Nashik city to Trimbakeshwar, with the ring road and highway widening under way. Distances are approximate and not route-checked.

By road and rail

Nashik cityAbout 30 km to Trimbakeshwar (approximate)
Highway wideningGhoti–Pegalwadi–Trimbakeshwar, four lanes, NHAI; acquisition of 132.09 ha reported Jun 2026
Outer ring road66 km, about ₹7,613 crore, March 2027 target reported 20 Sep 2026
Samruddhi Mahamarg701 km; the final 76 km Igatpuri–Amane section opened 5 Jun 2025; confirm the nearest interchange
RailNashik Road station; check the nearest station
AirportNashik (Ozar) airport; route time to be confirmed

Read this before relying on distances

Kumbh works shift traffic and can change which road a plot faces. A parcel may sit on an alignment that has not yet been notified, or on a village road that will be closed or widened. Ask NHAI, MSIDC or the Kumbh Mela Authority in writing whether the khasra is on any road alignment, and walk the approach in the monsoon.

Growth catalysts

Upcoming infrastructure & developments

Status labels maintained by the Farmland India research desk. Government-announced timelines — not guaranteed.

03Road projects

In progress

01Pipeline item

Confirm status

Under construction · acquisition starting Jun 2026 Ghoti–Pegalwadi–Trimbakeshwar highway widening
Under construction · March 2027 target Nashik outer ring road
Active · opened Jun 2025 Samruddhi Mahamarg
Reported · land acquisition under way Simhastha Kumbh 2027 works
Under construction · acquisition starting Jun 2026

Ghoti–Pegalwadi–Trimbakeshwar highway widening

NHAI's four-lane widening was reported on 28 June 2026 to have cleared farmer objections after district mediation. It covers 132.09 hectares across 671 survey numbers in 23 villages and ₹1,200 crore is sanctioned for the Ghoti–Amboli section; formalities were due within two weeks, after which acquisition begins. The route length is not stated.

Source: Free Press Journal, 28 Jun 2026; confirm with NHAI

Land

132.09 ha

Villages

23

Sanctioned

₹1,200 cr

Land markets in the blast radius

  • Trimbakeshwar
  • Igatpuri
Under construction · March 2027 target

Nashik outer ring road

The 66 km, four-lane ring road costs about ₹7,613 crore, with 47.9 km sanctioned by the Union ministry in January 2026 at ₹5,805 crore. Work has started on seven packages and acquisition for the rest was said to be in its final phase on 20 September 2026. The Govardhan gram sabha refused consent in January 2026, so the alignment remains contested.

Source: Swarajya, 20 Sep 2026 and 21 Jan 2026; confirm with MSIDC

Length

66 km

Cost

About ₹7,613 cr

Target

Mar 2027

Land markets in the blast radius

  • Nashik
  • Govardhan
  • Trimbakeshwar
Active · opened Jun 2025

Samruddhi Mahamarg

The 701 km Samruddhi Mahamarg passes through 10 districts including Nashik. The final 76 km Igatpuri–Amane stretch opened on 5 June 2025 (state register). It is delivered access to the Igatpuri side, not a forecast for Trimbak land.

Source: Maharashtra government records; confirm interchange distance

Length

701 km

Last section

76 km

Opened

5 Jun 2025

Land markets in the blast radius

  • Igatpuri
  • Nashik
Reported · land acquisition under way

Simhastha Kumbh 2027 works

Maharashtra reported expediting land acquisition and development works in Nashik ahead of the 2027 Kumbh (8 January 2026 report). Works are temporary or event-linked in part, so they do not guarantee lasting land demand.

Source: Swarajya, 8 Jan 2026 (carried from the Nashik district register); confirm with the Kumbh Mela Authority

Event

2027 Simhastha

Report

8 Jan 2026

Status

Confirm

Land markets in the blast radius

  • Nashik
  • Trimbakeshwar

Agriculture & terrain

Soil, crops & water in Nashik–Trimbak

Nashik–Trimbak mixes irrigated plains and rain-fed hill-edge fields: grapes, onions and pomegranate near Nashik, rice and hill millet near Trimbak. Confirm per khasra.

Soil & crops

The CGWB Nashik district profile (older data) records 15 talukas, rainfall from 575 to 2,500 mm across the district, and forest of 3,442.37 sq km. Western-edge talukas such as Trimbakeshwar and Igatpuri are the wetter, hillier side. We found no village-level crop data; grapes, onions and pomegranate are typical of the Nashik plains and rice of the wet western belt, and should be confirmed locally. Data: Soil Health Card site.

  • Grapes
  • Onion
  • Pomegranate
  • Rice

Water

The older CGWB Nashik profile put the stage of groundwater extraction at 49.33% on 31 March 2009, and Maharashtra as a whole at 52.99% in the latest state assessment. Neither is a block figure, so ask for the current category, test any borewell and check seasonal stream or well flows on hill plots. Groundwater categories: CGWB.

Mandi price reference

Nashik's market committees report to Agmarknet. We did not pull a price for this page, so check onion and grape prices live and compare any farm income with the full land cost before buying. Live prices: Agmarknet.

Fenced farm plot with stone boundary markers near Nashik-Trimbak, Maharashtra

Micro-market report — Nashik–Trimbak

Farmland India view

Why buyers look at Nashik–Trimbak

Reasons buyers look at this micro-market, stated with the evidence we have. Not a price forecast.

Public works are funded and visible

The highway widening, ring road and Kumbh works are in progress, with ₹1,200 crore and about ₹7,613 crore reported. They improve access, although they also take land.

A pilgrim town with year-round visitors

Trimbakeshwar draws pilgrims through the year and especially at Kumbh, which supports stays and weekend plots. It is not a price forecast.

Lower entry than Mumbai–Pune belts

Our estimate of ₹0.5–2.5 crore per acre* is below many Mumbai-region markets, but check the Ready Reckoner rate and recent deeds.

Samruddhi access to Igatpuri

The final Igatpuri–Amane section opened in June 2025, shortening the drive from Mumbai and Nagpur to the Igatpuri side. Confirm the interchange distance for your plot.

Browse reviewed land in Nashik–Trimbak

Listing data is not legal advice. Confirm title, section 63 eligibility, tribal-area and forest status with the Sub-Registrar, the tehsildar and the Forest Department.

STRAIGHT TALK

Risks & challenges specific to Nashik–Trimbak

Specific to this micro-market, beyond the Nashik and Maharashtra-wide points.

Land acquisition and contested alignments

The highway widening takes 132.09 hectares in 23 villages and the ring road faced a gram sabha refusal at Govardhan in January 2026 (Swarajya). Ask NHAI and MSIDC in writing whether the khasra is on any alignment before paying.

Tribal-area and forest protections

The Govardhan objection cited the Panchayats (Extension to Scheduled Areas) Act, and section 63-1A of the Bombay Tenancy and Agricultural Lands Act protects Scheduled Tribe sellers. We did not confirm which villages are Scheduled Areas or any eco-sensitive zone near Brahmagiri, so ask the tehsildar and the Forest Department. CONFIRM.

Section 63: farmers only

Section 63 of the Bombay Tenancy and Agricultural Lands Act restricts agricultural land to farmers. A 2016 amendment is reported to exempt land inside municipal corporation limits, and a ministerial statement of 8 July 2026 was reported on the rule. Confirm eligibility with a lawyer, because a defective purchase can be challenged.

Section 42, fragmentation and the 7/12 extract

Converting land to non-agricultural use needs permission under section 42 of the Maharashtra Land Revenue Code, reported to be reformed from 31 December 2025 (law-firm reports; confirm in the Gazette). Small plots may breach the Fragmentation Act, so read the 7/12 extract and area limits.

Event-driven demand

Kumbh works are tied to the 2027 event, and demand that follows an event can fade afterwards. Do not value a plot on pilgrim numbers alone.

Stamp duty and the Ready Reckoner

Maharashtra reported its 2026-27 Ready Reckoner as unchanged, after an average rise of 3.89% (rural 3.36%) in 2025-26 (press reports). Ask the Sub-Registrar which rate applies to the village and whether it sits inside a municipal limit.

NRIs and OCIs cannot buy this land

FEMA bars NRIs and OCIs from buying agricultural land, plantation land or a farmhouse anywhere in India, Maharashtra included. A farmhouse or farm-land listing is not a route for them. Confirm your status with a lawyer before paying a token amount.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Nashik–Trimbak.

Visit full wiki

01 of 04

What does agricultural land in Nashik–Trimbak cost?

Our estimate is ₹0.5–2.5 crore per acre*, indicative only. Prices vary by plot, road access and distance from Trimbakeshwar. Check the Ready Reckoner rate with the Sub-Registrar and recent registered deeds.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources for this page

  • Ghoti–Pegalwadi–Trimbakeshwar highway — Free Press Journal, 28 Jun 2026 (page read)
  • Nashik outer ring road — Swarajya, 20 Sep 2026 (page read); Govardhan gram sabha opposition — Swarajya, 21 Jan 2026 (page read)
  • Samruddhi Mahamarg, Kumbh land acquisition — carried from the Nashik district register (Swarajya, 8 Jan 2026; state records); REPORTED
  • Groundwater, rainfall, forest — CGWB Nashik district profile (older data) and CGWB state assessment; confirm block category
  • Maharashtra land law (sections 63, 63-1A, 42, Fragmentation Act, stamp duty, Ready Reckoner) — carried from the Nashik district page; REPORTED, confirm in the Gazette
  • Prices — Farmland India estimate*; Ready Reckoner rate to be obtained from the Sub-Registrar
  • Distances — approximate, not route-checked
  • Full district and state sourcing: see the Nashik page and the Maharashtra page. Sources read October 2026.

General information, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Nashik–Trimbak farmland?

Browse reviewed projects and individual land parcels across Nashik–Trimbak — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.