PADMA Scheme Haryana: Block-Level MSME Clusters, Grants and How They Work
Haryana's PADMA programme explained from the state's notifications: cluster grants of 50–85%, land rules, unit incentives, plot rules and how to apply.
PADMA, the Programme to Accelerate Development for MSME Advancement, is Haryana's plan to put a small industrial cluster in every one of its 143 blocks, each built around a product the block is already known for. It pays for two things: grants of 50% to 85% to whoever builds a cluster, and subsidies to micro and small units that set up inside one. This guide sets out the rules from the state's notifications, what they mean for a landowner or developer and for a manufacturer looking for a plot, and how PADMA sits next to HSIIDC estates. Last checked against official sources on 27 November 2026.
1. Key facts
| Item | Detail | Source |
|---|---|---|
| Programme | Programme to Accelerate Development for MSME Advancement (PADMA), 'One Block One Product' | Haryana MSME Directorate |
| Notified | Policy first notified 29 November 2022; revised notification 17 August 2023 | Haryana Assembly reply; Gazette |
| Aim | A new MSME cluster in each block, about 4,000 Acre in all; 10,000+ enterprises; 3,00,000 jobs | PADMA notification |
| Cluster size | 25 to 100 Acre per block; minimum 25 Acre (15 Acre in D-category blocks under PCIDS) | PADMA notification; PCIDS |
| Infrastructure grant | 50% (B blocks), 75% (C), 85% (D); up to Rs 35 crore (≤50 Acre) or Rs 45 crore (>50 Acre) | PCIDS, 4 March 2024 |
| Unit incentives in clusters | 30% capital subsidy (max Rs 30 lakh); 6% interest subsidy (max Rs 20 lakh a year); branding support | PADMA notification |
| Budget | Rs 1,000 crore earmarked in the 2023-24 budget | PADMA notification |
| Scheme window | PCIDS runs 17.08.2023 to 16.08.2028 or the policy's validity | PCIDS |
2. What PADMA is, in plain terms
Most Haryana industry sits in a handful of districts near Delhi. PADMA tries to spread it out. The MSME Directorate describes it as 'One Product, One Block': each block has a product picked for it, and the cluster in that block is meant to serve units making that product.
- Clusters, not single plots: the unit of PADMA is a park of 25 Acre or more with shared facilities, built by HSIIDC or by a private or public implementing agency.
- Grants for builders: the PADMA Cluster Infrastructure Development Scheme (PCIDS) pays part of the cost of roads, utilities and common facilities.
- Incentives for units: micro and small units inside a PADMA cluster get capital and interest subsidies and help with branding and marketing.
- Product rule: plots in a PCIDS-funded cluster may only be sold or leased to MSMEs making the block's approved product.
3. Who builds PADMA clusters
The PADMA notification gives HSIIDC the job of identifying land, building basic and common infrastructure, building sheds for lease and allotting plots, using its own funds and the state's SIIDS scheme. PCIDS then opens the door to others as Implementing Agencies:
- Public or private companies, joint ventures, partnerships and LLPs.
- Societies, trusts, cooperatives and Farmer Producer Organisations.
- Government agencies.
- Preference goes to women-led and SC-led implementing agencies.
| Condition for an Implementing Agency | Detail |
|---|---|
| Own contribution | At least 10% of total project cost as equity or contribution |
| Bank loan | A term loan of at least 5% of the project cost from a bank, NBFC or financial institution |
| Net worth | At least 1.5 times the grant sought (promoters' combined net worth counts) |
| Record | Not a wilful defaulter or debarred by any government agency |
| Land | Owned or on a registered lease of at least 30 years; the grant cannot pay for land |
Source: PCIDS notification, 4 March 2024.
4. How much the state pays to build a cluster
| Block category | Grant share | Minimum land |
|---|---|---|
| B | 50% | 25 Acre |
| C | 75% | 25 Acre |
| D | 85% | 15 Acre |
- Cap: Rs 35 crore for clusters up to 50 Acre; Rs 45 crore above 50 Acre. The 2023 policy notification mentions up to Rs 50 crore for private agencies, so confirm the cap that applies on the date you apply.
- B-category share: grants to B-category blocks are capped at 20% of the PCIDS budget.
- What counts: project cost excludes land, preliminary and pre-operative expenses and working capital margin. Basic infrastructure can be at most 60% of the eligible cost.
- Release: 35%, then 40%, then 25%, applied for within 10, 18 and 30 months of approval. A late claim loses 1% of the instalment per month, up to 10%.
- Completion: within 3 years of sanction, extendable by up to 2 years in two steps.
5. What every PADMA cluster must include
| Mandatory facility | Minimum |
|---|---|
| Plug-and-play units | 10 units, each at least 1,000 Sq.Yd. |
| Common Facility Centre | Rs 1 crore to Rs 5 crore |
| Business development / facilitation centre | Built-up area of at least 1,500 Sq.Yd. |
| Exhibition and display centre | At least 1,000 Sq.Yd. |
Optional facilities include skill centres, ICT, cold storage, common packaging, zero liquid discharge, a common boiler, a warehouse and a bank or NBFC branch. Source: PCIDS.
6. What a manufacturer gets inside a PADMA cluster
| Incentive | Amount |
|---|---|
| Capital investment subsidy | 30%, up to Rs 30 lakh |
| Interest subsidy on term loans | 6%, up to Rs 20 lakh a year |
| Designing, branding, marketing and exports | 50% reimbursement, up to Rs 10 lakh a year |
| Entrepreneurship acceleration (start-ups) | Rs 20 lakh for proof of concept, prototypes and commercialisation |
| Venture capital fund | Revolving fund of up to Rs 3 crore per unit |
Source: PADMA notification. Units that take PADMA incentives cannot also claim similar incentives under other state policies.
Check your product first
PCIDS-funded clusters may only sell or lease plots to MSMEs making the block's PADMA product. Ask the cluster or the District MSME office which product your target block has before you shortlist a plot.
7. Rules on plots and prices in a funded cluster
- The implementing agency may sell or lease industrial plots only to MSMEs making PADMA-approved products.
- It must publish user charges and plot prices on its website.
- It cannot sell the PADMA enabling infrastructure (the common facilities).
- Before the third grant instalment, 100% of plots must be allotted and at least 10% of units must be running.
- The agency maintains the infrastructure for at least 5 years after commissioning and then forms a cluster welfare association.
Prices are set by the implementing agency, not the state. Prices are subject to change and availability.
8. How an implementing agency applies
- Submit a concept note online to the Directorate of MSME, Haryana.
- Get in-principle approval from the State Level Steering Committee.
- Submit a Detailed Project Report.
- Get final approval from the SLSC-PADMA, then draw the grant in three instalments against progress.
Source: PCIDS.
9. Where PADMA stands in 2026
- In July 2026 the Chief Minister announced 10 new industrial clusters under PADMA, according to KNN India (reported).
- The Chief Secretary described plans for mini industrial parks in all 143 blocks, as reported by The Tribune.
- Construction World reported a private park accredited under PADMA in 2026; accreditation claims should be confirmed with the Directorate of MSME.
- Haryana adopted the Make in Haryana Industrial Policy 2026 in May 2026. A summary by ICAI's MSME committee notes that schemes already in the pipeline continue under earlier guidelines; check whether PADMA incentives have been revised for new units.
10. PADMA cluster or HSIIDC estate?
| PADMA cluster | HSIIDC estate / IMT | |
|---|---|---|
| Location | Every block, including rural ones | Mostly along highways and near cities |
| Size | 25–100 Acre | Hundreds to thousands of Acre |
| Who can buy | MSMEs making the block's product (in PCIDS clusters) | Any eligible industry |
| Unit incentives | PADMA subsidies inside the cluster | State industrial policy incentives |
| How plots are sold | By HSIIDC or the implementing agency | HSIIDC e-auction at reserve price |
For HSIIDC estates and their 2026-27 reserve prices, see our HSIIDC guide.
11. Common mistakes
- Assuming any unit can buy: funded clusters are tied to the block's product.
- Using the grant for land: PCIDS excludes land cost; land is the agency's contribution.
- Missing claim windows: each grant instalment has a deadline, with a deduction for delay.
- Double-claiming incentives: PADMA unit incentives cannot be stacked with similar state incentives.
12. Glossary
- PCIDS: PADMA Cluster Infrastructure Development Scheme, the grant for building clusters.
- Implementing Agency (IA): the body that builds and runs a PADMA cluster.
- Block category (A/B/C/D): Haryana's classification of blocks by industrial development; less developed blocks get higher grants.
- SLSC: State Level Steering Committee that approves PADMA projects.
- SIIDS: the state's industrial infrastructure development scheme that funds HSIIDC work.
13. Talk to our industrial land team
Farmland India's industrial land team can shortlist parks across Haryana by plot size, budget and pollution category, and line up site visits. Browse industrial parks listed on Farmland India or compare nearby belts: HSIIDC estates, Rohtak, Ambala–Panchkula.
Frequently Asked Questions
What is the PADMA scheme in Haryana?
How much land does a PADMA cluster need?
How much grant does PADMA give to build a cluster?
Can a private developer build a PADMA cluster?
What incentives do units in a PADMA cluster get?
Can any business buy a plot in a PADMA cluster?
Who sets plot prices in a PADMA cluster?
Is PADMA still running after the Make in Haryana policy 2026?
Where do I apply?
Sources
- Haryana Gazette: PADMA notification (revised 17 Aug 2023)
- Haryana Gazette: PADMA Cluster Infrastructure Development Scheme (4 March 2024)
- MSME Directorate Haryana: PADMA launch
- Haryana Vidhan Sabha: reply on PADMA notification dates
- ICAI MSME committee: Haryana State MSME policy summary (2026)
- KNN India: 10 new PADMA clusters announced (July 2026, reported)
- The Tribune: Chief Secretary on PADMA parks in 143 blocks (reported)
- Construction World: private park accredited under PADMA (2026, reported)
Spotted an error? Write to wiki@farmlandindia.com and we will correct it.
Looking for an industrial plot?
Tell us your plot size, budget and pollution category. Our industrial land team will shortlist parks and arrange site visits.