UP PLEDGE Park Scheme: How Private MSME Industrial Parks Work and Where They Are
Uttar Pradesh's PLEDGE scheme explained from the state's own pages: developer rules, the 1% loan, the 12 listed parks, the 2025 changes and buying a plot.
PLEDGE, short for Promoting Leadership and Enterprise for Development of Growth Engines, is Uttar Pradesh's scheme for small private industrial parks. A landowner or developer with at least 10 Acre of contiguous land can turn it into an MSME park, with a state loan at 1% interest to build the roads, drains and utilities. For a manufacturer, a PLEDGE park is a smaller, cheaper alternative to a UPSIDA or development-authority estate, often in a district town. This guide covers the rules for developers, the parks listed so far, the 2025 changes and what to check before you buy a plot in one. Last checked against official sources on 27 November 2026.
1. Key facts
| Item | Detail | Source |
|---|---|---|
| Scheme | PLEDGE: Promoting Leadership and Enterprise for Development of Growth Engines | UP MSME 1-Connect |
| Run by | MSME and Export Promotion Department, Uttar Pradesh, through District Industries Centres and a PLEDGE Cell | UP MSME 1-Connect |
| Who applies | A developer or promoter with at least 10 Acre of contiguous land in UP | UP MSME 1-Connect |
| State support | Development loan at 1% interest; land counted at 90% of circle rate, capped at Rs 50 lakh per Acre (about Rs 1,033 per Sq.Yd.) | UP MSME 1-Connect |
| Corpus | Rs 2,500 crore revolving corpus | Invest UP |
| Parks listed | 12 parks, 178.29 Acre, 641 plots | UP MSME 1-Connect park list |
| Approved by cabinet | 28 January 2023 (reported) | Organiser, June 2023 |
| Latest rule change | November 2025 amendment on roads, development charges and support land (reported) | Indian Masterminds, Nov 2025 |
2. What a PLEDGE park is
Uttar Pradesh has run private industrial park schemes before. The 2017 Private Industrial Park scheme needed 20 to 30 Acre or more, depending on region, and paid interest subsidies on land loans. PLEDGE lowers the bar to 10 Acre and lends money for internal development directly, so that smaller landowners in district towns can create MSME parks.
- Small parks: the parks listed so far range from 10 to 32 Acre.
- Many small plots: the scheme requires a minimum number of units per Acre. The state's own example is at least 25 units in a 25 Acre park.
- Private ownership and marketing: the developer builds the internal infrastructure and sells or leases the plots. Construction World reported that developers repay the loan from plot sales.
- For MSMEs: the scheme sits under the state's MSME department and is linked to the UP MSME Policy 2022 and the central RAMP programme.
3. Rules for developers
| Requirement | Detail |
|---|---|
| Land | At least 10 Acre of contiguous land in Uttar Pradesh, free of encumbrance |
| Land use | Industrial land-use record for the site |
| Approach road | Details of the approach road (the state page lists a minimum of 12 m) and power supply |
| Character certificate | For the promoter, issued at District Magistrate level |
| Project report | A Detailed Project Report following the park-development SOP, with a layout plan |
| Ownership records | Khasra, Khatauni, registered deed and related records |
| Units | A minimum number of units per Acre, for example 25 units in a 25 Acre park |
Source: the PLEDGE page on UP MSME 1-Connect.
Check the approach-road rule for your site
The state's PLEDGE page still lists a 12 m approach road. The November 2025 amendment, as reported, allows parks on 7 m roads for green and orange category industries. Confirm with the District Industries Centre which rule applies before you plan the layout.
4. What the state offers
- Development loan at 1%: for internal development of the park. The 2025 amendment, as reported, describes it as Rs 50 lakh per Acre for internal roads, utilities and drainage in parks of 10 to 50 Acre.
- Land value: the state page says non-agricultural or industrial land is counted at 90% of the circle rate, up to Rs 50 lakh per Acre (about Rs 1,033 per Sq.Yd.).
- Stamp duty for the developer: up to 100% exemption on buying land for the park.
- Stamp duty for unit buyers: 50% to 100% exemption when an MSME buys or leases a plot in the park.
- RAMP support: 50% of the interest on gap funding to PLEDGE parks, capped at Rs 50 lakh, under the central RAMP programme.
Invest UP describes the scheme as backed by a Rs 2,500 crore revolving corpus. The state page does not set out the loan tenure or repayment schedule; those come with the Letter of Comfort and the loan agreement.
5. The November 2025 changes (reported)
Indian Masterminds reported on 26 November 2025 that the state had amended the PLEDGE private industrial park scheme. We have not yet seen the amendment order itself, so treat these points as reported:
- Roads: parks may be set up on 7 m roads for green and orange (less polluting) category industries; parks on 12 m roads can host all categories. A 1.5 m footpath on both sides is compulsory.
- Development charges: 25% in areas notified by development authorities; none outside them.
- Layout approval: development authorities approve layouts inside their notified areas; the Director of Industries or authorised officers approve those outside.
- Stamp duty: the whole park is treated as one unit, valued by the District Magistrate.
- Support land: 10% of the park must be kept for support facilities such as restaurants, cafeterias, EV charging or fuel, banks, medical and skill centres, and public conveniences.
6. PLEDGE parks listed by the state
The PLEDGE page on UP MSME 1-Connect lists these parks, each with its District Industries Centre contact (we do not reproduce phone numbers here):
| Park | District | Area | Total plots |
|---|---|---|---|
| Aligarh Hardware Pledge Park | Aligarh | 14.00 Acre | 104 |
| Sanjeevani Fertilizers and Chemicals park | Kanpur Dehat | 11.00 Acre | 29 |
| Saharanpur Handicraft Development Centre | Saharanpur | 32.00 Acre | 53 |
| Rani Laxmibai Pledge Park | Jhansi | 10.00 Acre | 11 |
| New Hapur Industrial Pledge Park | Hapur | 12.29 Acre | 35 |
| Hindustan Industrial Pledge Park | Sambhal | 23.00 Acre | 151 |
| Meerut Industrial Pledge Park, Phase 1 | Meerut | 10.00 Acre | 23 |
| Vrindavan Industrial Pledge Park, Jaint | Mathura | 17.00 Acre | 72 |
| PLEDGE Park Amroha | Amroha | 15.00 Acre | 53 |
| PLEDGE Park Sitapur | Sitapur | 12.00 Acre | 31 |
| Shri Ram Pledge Park | Unnao | 10.00 Acre | 37 |
| PLEDGE Park Moradabad | Moradabad | 12.00 Acre | 42 |
| Total | 178.29 Acre | 641 |
Construction World reported that the Saharanpur and Moradabad approvals took the number of private industrial parks to 13, and Invest UP's MSME page mentions the 11th park opening in Jhansi. The state list above shows 12, so the count may differ by date; use the live list.
Near Delhi-NCR
Of the listed parks, Hapur, Meerut and Mathura are the closest to Delhi-NCR. Our Ghaziabad–Hapur–Meerut guide covers the Hapur and Meerut parks alongside UPSIDA estates and IMLC Meerut.
7. Buying a plot in a PLEDGE park
- Check the park on the state's PLEDGE list and confirm it has a Letter of Comfort and an approved layout.
- Ask the developer for the layout plan, your plot number, its size in Sq.Mt. and Sq.Yd., and the price per Sq.Yd., in writing.
- Ask what is built: internal roads, drains, power, water and street lights, and the dates for anything still pending.
- Check which industry categories the park can take. Under the 2025 amendment as reported, parks on 7 m roads are limited to green and orange category units.
- Ask the District Industries Centre about the stamp duty exemption for your plot purchase or lease, and any MSME Policy 2022 incentives you may qualify for.
- Read the sale or lease deed for construction deadlines, transfer rules and maintenance charges before you pay.
Prices
PLEDGE parks are private, so each developer sets its own plot prices. The state does not publish them. Prices are subject to change and availability.
8. PLEDGE park, UPSIDA estate or private licensed park?
| PLEDGE park | UPSIDA estate | Development authority (Noida, YEIDA) | |
|---|---|---|---|
| Who sells | Private developer | UPSIDA | The authority |
| Size of park | 10–50 Acre | Large estates | Large sectors |
| Typical location | District towns | Across UP | Delhi-NCR and expressways |
| How you buy | Direct from developer | Nivesh Mitra, e-auction above 75% allotment | Scheme draw, interview or e-auction |
| Price | Set by developer | UPSIDA rate list | Authority rate list or auction |
See our guides to UPSIDA plots, Noida and YEIDA for the government routes.
9. How a developer applies
- Submit the application at the District Industries Centre (DIC) of the district where the land is.
- The district-level committee considers and approves it.
- Submit the Detailed Project Report to the PLEDGE Cell.
- The PLEDGE Cell evaluates the project.
- The state issues a Letter of Comfort, after which the loan and other support follow.
Source: UP MSME 1-Connect.
10. Common mistakes
- Counting agricultural land as ready: the scheme needs an industrial land-use record; agricultural land must be converted first.
- Too few plots: the minimum units per Acre rule means a park of a few large plots will not qualify.
- Forgetting the 10% support land: under the 2025 amendment as reported, a tenth of the park goes to support facilities, not sellable industrial plots.
- Buyers assuming a government price: plots are sold by private developers at their own prices.
11. Glossary
- DIC: District Industries Centre, the district office of the industries department and the first stop for an application.
- Letter of Comfort: the state's in-principle approval of a PLEDGE park after evaluation.
- RAMP: Raising and Accelerating MSME Performance, a central programme that funds part of PLEDGE support.
- Green / orange / red category: pollution categories that decide which industries a site can host.
- Circle rate: the government's minimum land value for stamp duty in an area.
12. Talk to our industrial land team
Farmland India's industrial land team can shortlist parks in Uttar Pradesh by plot size, budget and pollution category, and line up site visits. Browse industrial parks listed on Farmland India or compare nearby belts: Ghaziabad–Hapur–Meerut, UPSIDA, IMLC Meerut.
Frequently Asked Questions
What is a PLEDGE park?
What does PLEDGE stand for?
How much land is needed for a PLEDGE park?
What loan does the state give?
How many PLEDGE parks are there?
Are there PLEDGE parks near Delhi?
Who sets plot prices in a PLEDGE park?
Is there stamp duty relief for plot buyers?
How does a developer apply?
Does Farmland India sell PLEDGE park plots?
Sources
- UP MSME 1-Connect: PLEDGE support page and park list
- Invest UP: MSME opportunities (PLEDGE corpus)
- Invest UP: MSME sector page
- UP MSME Promotion Policy 2022 (English translation)
- UP Private Industrial Park Promotion Scheme 2017
- Indian Masterminds: PLEDGE scheme amended (26 Nov 2025, reported)
- Organiser: first PLEDGE Hardware Park, Aligarh (June 2023, reported)
- Construction World: Saharanpur and Moradabad PLEDGE parks approved (reported)
Spotted an error? Write to wiki@farmlandindia.com and we will correct it.