Land Along the Dwarka Expressway: New Gurgaon and Farmland Pockets (2026)
The 19 km Haryana section, master plan context, licence and setback rules, and a parcel checklist.
The Dwarka Expressway's Haryana section is 19 km and eight lanes according to the PMO page on its March 2024 opening, and most land beside it is already in urban sectors. This guide shows what is confirmed, what is not, and how to check a parcel.
The Dwarka Expressway at a glance
The Dwarka Expressway links Dwarka in Delhi with the Gurugram stretch of NH-48. The Prime Minister's Office page on its inauguration, dated 11 March 2024, says the Haryana section is 19 km, eight lanes, at a cost of about Rs 4,100 crore. It was built in two sections: 10.2 km from the Delhi-Haryana border to the Basai rail-over-bridge, and 8.7 km from Basai to Kherki Daula. The page says it gives direct connectivity to Delhi's IGI Airport and to the Gurugram bypass.
| Item | Detail | Source |
|---|---|---|
| Haryana section | 19 km, eight lanes | PMO, 11 March 2024 |
| Cost of Haryana section | About Rs 4,100 crore | PMO |
| Packages | 10.2 km (border to Basai ROB) and 8.7 km (Basai ROB to Kherki Daula) | PMO |
| Opened | 11 March 2024 | PMO |
| Total length incl. Delhi part | We could not confirm on an official page; press says about 28.5 to 29 km | Press |
| Authority | NHAI (national highway project) | Project listing |
A road this short means few villages touch it directly. Most of the land beside it in Haryana is already in urban sectors. Farmland pockets exist, but the buyer should expect urban rules, licensed colonies and high land values rather than village-style open farmland.
Master plan context: Gurgaon-Manesar
The corridor sits inside the Gurgaon-Manesar Urban Complex. Our research notes record a Final Development Plan 2031 AD notified on 15 November 2012 (reference CCP(NCR)/FDP-2031/GGN/2012/3541), taken from a third-party copy of the notification, which says it was made under section 5(7) of Punjab Act 41 of 1963. We could not find a notified 2041 plan, and we did not open the official TCP Haryana page, so we cannot say which plan version governs a specific sector today. Read our Gurgaon master plan page and how to read a master plan before you rely on any zoning map.
Press reports name sectors in the 99 to 115 range as lying on the road, and name Global City Gurugram, a Haryana State Industrial and Infrastructure Development Corporation (HSIIDC) project of about 1,000 acres around sectors 36 to 37, as reported. Those are secondary sources; the plan drawing is the authority.
How the land was acquired and what remains
The road is a national highway project, so land acquisition for the carriageway falls under the National Highways Act, 1956. Section 3D of that Act is headed "Declaration of acquisition", and once a declaration is published the land "shall vest absolutely in the Central Government free from all encumbrances" (indiankanoon copy we opened). We did not find the Dwarka Expressway notifications for Haryana villages, so we cannot say which survey numbers were notified.
The buyer's practical question is different: is the parcel in a licensed colony, a sector reserved for a plan use, or still a farmer's remaining holding? Under the Haryana Development and Regulation of Urban Areas Act, 1975 (our library reads section 3 as requiring a licence to convert land into a colony, and section 7 as barring plot transfer, advertisement or taking money without a licence), a seller who cannot show a licence cannot lawfully sell "plots". Read the LARR explainer if compensation is in dispute.
Rules that govern buying near the road
- Controlled area and urbanisable zone. See controlled area vs urbanisable area in Haryana. Land outside the urbanisable zone cannot simply be built on.
- Change of land use. Our library records section 7 of the 1963 Act as barring a change of use in a controlled area without the Director's permission. See CLU in Haryana.
- Distance from the road. The 1963 Act section 3, as read in our library, bars building within thirty metres of the road reservation of a scheduled road, and notes 100 m for a bypass or expressway after a 2004 amendment. We have not verified that this road is covered, so ask the Director, TCP, and read our setback note.
- Aravalli and green belt. Parts of Gurugram carry Aravalli restrictions; see Aravalli and green belt restrictions in NCR and PLPA section 4 and gair mumkin pahar.
- Farmhouses. See farmhouse rules in Haryana.
How to check a specific parcel on the Dwarka Expressway
- Alignment. Match the village and khasra number against the road's edge. Our KML guide shows the method, but the line is indicative.
- 3A/3D notice. Ask NHAI for the notified survey-number list for the village. If your khasra is on a 3D declaration, the strip belongs to the Centre.
- Interchange distance. Identify the nearest named junction or sector road and measure drive distance. We could not confirm an official interchange list for the Haryana section.
- Master-plan zone. Read the zone for the sector on the DTCP drawing. Residential, commercial, green and agricultural zones allow different things, and sector roads can cut across a farmer's parcel.
- Floodplain and forest overlays. Check Aravalli notified areas, seasonal drains and low-lying pockets. Ask for local flooding history in monsoons.
- Licence and title. Ask for the DTCP licence number of any colony, confirm it on the Haryana TCP site, pull the jamabandi through Haryana's portal and run an encumbrance search. Also see our due diligence checklist.
Collector rates are not prices
Haryana raises collector rates in steps, so compare any offer with the current collector rate for the exact village. See circle rate vs market rate in our guide; we state no price per acre here.
Red flags
- "Farmland on the Dwarka Expressway" offered as plots without a DTCP licence. See how to spot unapproved plotting.
- Claims that a sector road or interchange will be built next to the parcel, with no layout plan.
- A seller with a power of attorney rather than title. Read GPA land sale risk.
- Any promise of returns. We make none, and no document supports one.
The KMP and Delhi-Mumbai roads feed the same region; see our KMP guide and Delhi-Mumbai Expressway land impact.
What we could not confirm
On official pages we could not confirm: the total length including the Delhi section, interchange list, the notified survey numbers, the current toll, the governing master plan version (2031 final versus any 2041 draft), the Global City status, and whether this road is a scheduled road under the 1963 Act. This page is a screening guide, not legal advice.
Frequently Asked Questions
How long is the Haryana section?
What did the Haryana section cost?
What are its two sections?
Is there farmland left along it?
Which master plan applies?
Can I build within 30 m of the road?
Do I need a licence to sell plots?
Is Global City relevant?
Are there price figures on this page?
Is this legal advice?
Sources
- PMO India: Dwarka Expressway inauguration, 11 March 2024, opened October 2026
- National Highways Act, 1956 section 3D (indiankanoon), opened October 2026
- Punjab Act 41 of 1963 as applied in Haryana (read in our legal library)
- Haryana Development and Regulation of Urban Areas Act, 1975 (read in our legal library)
- Haryana TCP development plan page (listed, not opened)





