The Regional Plan 2041 is the top-level land-use framework for the National Capital Region, sitting above every master plan in Delhi, Haryana, Uttar Pradesh and Rajasthan. This guide explains what the December 2021 draft proposed, what the NCR Planning Board changed at its June 2026 meeting, which parts are still not in force, and how to read the plan before you buy farmland, a farmhouse plot or a corridor parcel anywhere in the NCR.

~19 min readMaster Plan & ZoningUpdated 13 Nov 2026Farmland India Editorial
55,083
Square kilometres of NCR, the extent the Board decided to keep in June 2026
81.7%
Share of NCR land under agriculture in the 2015-16 land-use survey used by the draft
1 km
Depth on each side of highways and transit lines the draft treats as a corridor zone
2021
Regional Plan still legally in force until RP-2041 is notified

Every land seller in the NCR has a story about a road, a metro or a new city coming next door. The Regional Plan 2041 is where many of those stories begin, and also where most of them get exaggerated. It is a long, cautious document written by the National Capital Region Planning Board (NCRPB) under the Ministry of Housing and Urban Affairs, and it sets the rules that the master plans of Gurugram, Noida, Faridabad, Meerut, Alwar and every other NCR town must follow. If you are buying agricultural land or a farmhouse plot in Haryana, western Uttar Pradesh, the Alwar and Bharatpur belt of Rajasthan or Delhi itself, it is worth understanding what this plan does, what it does not do, and what is still undecided.

NCR Regional Plan 2041RP-2041NCRPBNCR Planning BoardDraft Regional Plan 2041Regional Plan 2021Natural Conservation ZoneAravalli NCZCentral NCRHighway Corridor ZoneTransit Oriented Development NCRNamo Bharat RRTSNamo CitiesCRE-II expresswayOrbital rail corridorCounter magnet areasNCR boundary 100 kmNCR districts listSub-Regional PlanFarmland near Delhi NCRNCRPB Act 1985Green buffer NCRLand use zones explainedAravalli and green belt rulesChange of land use (CLU)

What the Regional Plan Is

The National Capital Region was created by the National Capital Region Planning Board Act, 1985. The Act set up the NCRPB and gave it one main instrument: a Regional Plan that guides land use and infrastructure across the whole region, not just Delhi. Three plans have been prepared so far. Regional Plan 2001 was notified in 1989. Regional Plan 2021 (RP-2021) was notified on 17 September 2005 and is the one still in force today. Regional Plan 2041 (RP-2041) is meant to replace it.

The plan sits at the top of a ladder. Below it, each participating state prepares a Sub-Regional Plan for its part of the NCR. Below those come District Development Plans, then the master plans or development plans of individual towns, and at village level the Gram Panchayat Development Plans. Each lower plan is supposed to conform to the one above it. The draft RP-2041 sets out this hierarchy in its implementation chapter, with timelines for each level.

Two sections of the 1985 Act explain why land buyers should care. Section 27 gives the Act overriding effect over other laws where they conflict, and Section 29 bars development in the region that is inconsistent with the Regional Plan. In practice, though, the Regional Plan works mostly through the state plans and the state town planning departments. You will rarely see "RP-2041" written on a land record. What you will see is the zone your khasra falls in on a state master plan, and that zone is shaped by the Regional Plan.

βœ“

Think of it as the rulebook for the rulebooks

A buyer almost never applies the Regional Plan directly. You apply the town master plan, the state's change of land use rules and the revenue record. The Regional Plan tells you which way those lower rules are likely to move over the next fifteen years.

Where RP-2041 Stands in 2026

This is the single most important point in this guide: as of November 2026, Regional Plan 2041 has been approved by the Board but we could not find a gazette notification of the final plan. Until it is notified, RP-2021 remains the legally operative Regional Plan.

The timeline so far:

  • 12 October 2021: the NCRPB gave in-principle approval to the draft at its 41st meeting.
  • December 2021: the full Draft Regional Plan 2041 was published on the NCRPB website for public suggestions and objections, which were invited until early January 2022.
  • December 2023: a parliamentary committee asked the Board to finalise and notify the plan within six months. That did not happen.
  • Mid-2023 onwards: news reports pointed to the treatment of the Natural Conservation Zone as the main issue holding up notification.
  • 16 June 2026: the Board, at its 42nd meeting chaired by Union Housing and Urban Affairs Minister Manohar Lal, approved final modifications to RP-2041. Reports say more than 4,500 objections and suggestions were considered.
  • 2 July 2026: the Ministry updated the Schedule of the NCRPB Act to match Rajasthan's new district boundaries. Reporting at the time noted that RP-2041 itself had still not been notified.

So when a broker quotes "the 2041 plan", ask which version. Much of what circulates online is from the December 2021 draft, and some of the draft's biggest proposals were reversed in June 2026.

What changed between the 2021 draft and the June 2026 approval

  • NCR boundary: the draft proposed shrinking the NCR to roughly a 100 km radius from Rajghat, plus notified towns and 1 km corridors along highways beyond that radius. The Board instead decided to keep the existing 55,083 sq km extent.
  • Conservation zone: the draft proposed replacing the Natural Conservation Zone with a looser "Natural Zone". The Board decided to retain the Natural Conservation Zone and the RP-2021 safeguards.
  • New cities: the draft spoke of five to eight greenfield townships. The June 2026 decisions refer to four transit-oriented "Namo Cities" along Namo Bharat (RRTS) corridors, with a reported β‚Ή5,000 crore support package of β‚Ή1,000 crore in grants and β‚Ή4,000 crore in loans and guarantees.
  • Green incentives: green canopy credits and Special Development Rights were proposed to reward private landowners who add tree cover.
  • Population: the 2021 draft projected about 11.3 crore people by 2041. Reporting on the June 2026 approval cites a rise from 7.86 crore to 14.73 crore.

The final text of the approved plan was not public when this guide was written. Everything below that comes from the 2021 draft is labelled as such, and should be checked against the notified plan once it appears.

How Big the NCR Is, and Why It Matters

The NCR has grown in steps, from about 30,242 sq km in the first plan to 55,083 sq km after districts were added in 2013, 2015 and 2018. The draft notes that the region is now larger than several Indian states. It covers all of NCT Delhi (1,483 sq km), 14 districts of Haryana, 8 districts of Uttar Pradesh, and the Rajasthan districts carved out of the old Alwar and Bharatpur districts.

After the July 2026 notification, the Rajasthan part reads as follows: Alwar, the new Khairthal-Tijara district, Bharatpur and the new Deeg district are included in full. Kotputli-Behror is only partly included, with Behror, Neemrana, Bansur, Mandan and Narayanpur tehsils inside the NCR and Kotputli, Viratnagar and Pavta tehsils outside it. If you are looking at land around Neemrana or Bhiwadi, that tehsil line matters.

Why does inclusion matter to a buyer? Being inside the NCR brings a district under NCR transport, infrastructure financing and planning policies, including NCRPB loans for projects. It also brings it under the NCR's planning discipline and its conservation rules. The draft's 100 km proposal would have taken large parts of outer Haryana, such as Jind, Karnal, Bhiwani and Mahendragarh, out of the NCR's main area, keeping only towns and highway strips. That proposal is now off the table, so these districts stay fully inside the NCR.

!

"NCR" in an ad is not proof of anything

Being in the NCR does not make agricultural land buildable, nor does it guarantee price growth. A parcel 140 km from Delhi in Jind is legally in the NCR. It is still agricultural land under Haryana's rules, and still needs a change of land use for anything beyond farming and permitted farmhouse use.

Population and Urban Growth

The draft's projections give a sense of scale. It projected the NCR's population at 718 lakh in 2021, 896 lakh in 2031 and 1,130 lakh in 2041, with Uttar Pradesh holding about a third, Haryana about 30%, Delhi about 27% and Rajasthan about 10% by 2041. It expected the urban share to rise from about 59% in 2021 to about 68% in 2041, with NCT Delhi fully urban by 2031. The 2026 figures reported after the Board meeting are higher still.

Among individual cities, the draft projected Delhi at about 3.08 crore, Gurugram about 96 lakh, Faridabad about 68 lakh, Ghaziabad about 47 lakh and Meerut about 37 lakh by 2041. It also listed the design populations of planned areas such as Greater Noida (12 lakh), YEIDA (20 lakh) and the Manesar-Bawal Investment Region (about 33 lakh).

For a farmland buyer, these numbers point to one thing. The region expects to absorb several crore more people, mostly in cities that will expand outward into what is now farmland. That expansion happens through master plan revisions, which convert agricultural zones to residential, industrial or institutional zones one revision at a time. The Regional Plan does not tell you which village will be next. It tells you the direction of travel.

The Policy Zones

The draft divides the NCR into five policy zones. Each has a different development intent, and each translates into different expectations for land in it. Read these as directions from the draft, not as final rules.

1. NCT Delhi

Delhi is treated as static in area at 1,483 sq km, with growth to be vertical and planned. The draft talks of higher floor area ratios around transit, Transferable Development Rights (TDR), strict water rules for large buildings and no heavy industry. It also raised the idea of reviewing the Delhi Land Reforms Act to deal with Lal Dora and extended Lal Dora areas. Delhi's own land rules sit in the separate Master Plan for Delhi 2041.

2. Central NCR (CNCR)

Central NCR is the ring around Delhi, described in the draft as extending from the Delhi boundary to about 5 km beyond the first ring of expressways, that is, the Eastern and Western Peripheral Expressways (the draft calls this ring CRE-I). The draft wants the whole of CNCR covered by a development authority, closing pockets that are not notified for planned development. It favours logistics, warehousing and industry, treats warehousing as industrial use, and proposes townships inside the expressway ring to take pressure off Delhi.

The draft is inconsistent in places about whether the outer edge follows the Western Peripheral or the KMP Expressway, so treat the exact line as unsettled until the final maps are released.

3. Highway Corridor Zone and Transit Oriented Development

This is the zone most often quoted in land ads. The draft proposes intensive development up to 1 km on either side of rail transit corridors, expressways and national highways, and transit-oriented development (TOD) areas of roughly 0.5 to 2 km around stations, with high floor area ratios and mixed use. It also proposes green buffers outside urban limits along expressways, highways and rail lines, where only limited uses such as farming, horticulture, fuel stations, EV charging and trauma care would be allowed.

Two cautions. First, a corridor zone in a Regional Plan is a policy direction. It becomes usable only when a state master plan or a notified controlled area actually zones the land for development. Second, access-controlled expressways do not give direct access to land along them; a parcel touching the expressway may have no legal entry from it at all. See our guide on land near highways and setback rules.

Access-controlled expressway on a viaduct over farmland with a village service road below
Illustrative image. Land beside an access-controlled expressway often has no legal entry from it; the usable access is the village or service road.

4. Natural Zone / Natural Conservation Zone

This covers forests, wildlife sanctuaries, eco-sensitive zones, wetlands, rivers and major water bodies, and in the NCR, crucially, the Aravalli hills. This zone is covered in its own section below because of the June 2026 decision.

5. Rest of NCR

Everything else, which is most of the region's farmland. The draft wants this area to remain mainly agricultural, with development concentrated in designated industrial zones, special economic zones, rural investment areas, agro parks and MSME clusters. It favours "negative lists" (stating what is prohibited) over long lists of what is allowed, to make approvals easier.

Natural Conservation Zone and the Aravallis

RP-2021 created the Natural Conservation Zone (NCZ) for ecologically sensitive areas: the extension of the Aravalli ridge in Rajasthan, Haryana and Delhi, forests, river banks, sanctuaries and major lakes. Within the NCZ, construction is restricted to a very small share of the area, widely cited as 0.5%, and states must enforce the conservation regime under central and state law and court directions.

The 2021 draft proposed renaming the category "Natural Zone" and, according to environmental groups and experts quoted in the press, protecting only features that were both notified and recorded in revenue documents. Critics argued that large parts of the Aravallis and many forests in Haryana fail one of those tests, so they would have lost protection. This was the main point of dispute for years.

Scrub-covered Aravalli hills with small farm fields at the foothills
Illustrative image of the Aravalli belt. Natural Conservation Zone, forest and PLPA restrictions here usually do not show on the jamabandi.

In June 2026 the Board decided to keep the Natural Conservation Zone and continue the RP-2021 safeguards. For buyers, that means:

  • Land in the Aravalli belt of Gurugram, Faridabad, Nuh, Rewari, Mahendragarh, Alwar and Khairthal-Tijara must be checked against the NCZ maps before purchase, regardless of what the revenue record calls it.
  • "Gair mumkin pahar" (uncultivable hill) entries, land covered under the Punjab Land Preservation Act, 1900 in Haryana, and areas treated as forest under court rulings each carry their own restrictions on top of NCZ.
  • A farmhouse plot inside the NCZ may be buildable only to a tiny footprint, or not at all. Several farmhouse colonies in the Aravalli foothills have faced demolition drives.

Our Aravalli and green belt guide and the Forest Conservation Act guide go into the details. When in doubt, ask the District Town Planner for a zoning confirmation in writing.

!

Cheap Aravalli land is usually cheap for a reason

If a "farmhouse plot" near Sohna, Damdama, Faridabad's Aravalli villages or the Alwar ridge is priced well below the nearby market, check the NCZ, forest and PLPA status first. Most of these restrictions do not appear on the jamabandi.

Agricultural and Rural Land

The draft's land-use survey (2015-16 satellite data) found that about 81.7% of the NCR was agricultural land, 8.3% built-up, 4.6% wasteland, 3.3% forest (about 83% of that in Rajasthan) and 1.6% water bodies. Agriculture remains the dominant use of land in the region by a very wide margin.

The draft's approach to that land is conservative:

  • Existing cropland is to be conserved, and irrigated multi-cropped land kept out of urban use where possible.
  • Rural areas outside notified urban zones are to remain primarily agricultural. Industry, SEZs and rural investment areas are allowed only where designated, and heavy or hazardous industry only in such zones.
  • Large educational, health and training campuses need planned layouts rather than piecemeal approvals.
  • Every village is to have at least two water bodies, and dairies are to move from city cores to the periphery.
  • The economy chapter proposes food processing parks at tehsil headquarters, land earmarked for milk processing, and conservation of special crop areas such as the Ratul mango belt of Baghpat.

Notice what the draft does not do. It does not create a farmhouse policy. Farmhouse rules in the NCR come from the states: Haryana's controlled-area rules, Uttar Pradesh's development authority regulations, Rajasthan's conversion rules under Section 90-A of its Land Revenue Act, and Delhi's master plan. The Regional Plan's influence on farmhouses is indirect: it pushes states to keep good farmland agricultural and to concentrate building in planned areas. See farmhouse rules in Haryana, Uttar Pradesh and Rajasthan.

Expressways, RRTS and Orbital Links

Transport is where the plan most directly affects land values, and where most exaggeration happens. The draft's transport chapter lists projects at very different stages, from complete to merely "tentative alignment". Here is what it says, grouped by type.

Circular Regional Expressways

  • CRE-I: the existing Eastern and Western Peripheral Expressways around Delhi.
  • CRE-II (proposed): Panipat, Shamli, Meerut, Jewar, Nuh, Bhiwadi, Rewari, Jhajjar, Rohtak and back to Panipat.
  • CRE-III (proposed): Karnal, Muzaffarnagar, Garhmukteshwar, Naraura, Aligarh, Mathura, Deeg, Alwar, Mahendragarh, Charkhi Dadri, Bhiwani, Jind, Kaithal and back to Karnal.

CRE-II and CRE-III are named routes through towns, not surveyed alignments. A town on the list tells you nothing about which villages a future road would pass through, or when.

Rail

  • RRTS (Namo Bharat): eight corridors identified, with Phase 1 being Delhi-Meerut, Delhi-Panipat and Delhi-Alwar. The draft wants all counter-magnet areas linked by RRTS by 2035. The June 2026 Namo Cities proposal ties new cities to these corridors.
  • Orbital Rail Corridors ORC-I, II and III: shown only as tentative alignments.
  • Elevated Outer Ring Road: proposed parallel to Delhi's Outer Ring Road, with spurs to Jewar and Hisar airports; alignment also tentative.
Regional rapid transit train on an elevated viaduct across wheat fields
Illustrative image. The draft ties transit-oriented development and the new Namo Cities to RRTS corridors.

Expressways and airports

The draft lists the Delhi-Meerut, Delhi-Mumbai, Ganga, Delhi-Amritsar-Katra, Delhi-Dehradun, Dwarka and Yamuna expressways and the six-lane Trans-Haryana highway, along with the dedicated freight corridors. On air connectivity it names the Noida International Airport at Jewar and Hisar. It also proposes bypasses around towns above 50,000 people, with land along bypasses notified as controlled areas, which in Haryana usually brings tighter rules on construction, not looser.

βœ“

Use a five-stage test for every road claim

Has it been (1) announced, (2) approved with a sanctioned budget, (3) given a notified alignment, (4) had land acquired, and (5) started construction? A line in the Regional Plan is usually stage one. Our guide on infrastructure and land prices explains why most of the price move happens at stages three to five.

Settlement Hierarchy and New Cities

The draft ranks every settlement in a seven-tier hierarchy for 2041: metro centres (10 lakh and above), regional centres (3 to 10 lakh, plus all district headquarters), sub-regional centres (1 to 3 lakh, plus tehsil headquarters), service centres (10,000 to 1 lakh, plus block headquarters), central villages, medium villages and small villages. Metro centres named include Delhi, Gurugram, Faridabad, Noida, Ghaziabad, Loni, Meerut and Muzaffarnagar.

Tier matters because infrastructure and planning effort follow it. A district or tehsil headquarters is expected to get a proper master plan, bypasses and services sooner than a village.

On new towns, the draft proposed five to eight greenfield townships and about eight smart greenfield cities modelled on AURIC (Aurangabad) and Dholera. The June 2026 decisions narrowed this to four "Namo Cities" along RRTS corridors. Their locations had not been officially published at the time of writing. Any seller claiming to know them should be asked for the government notification.

Beyond the NCR, the plan also keeps the idea of counter-magnet areas: cities such as Hisar, Ambala, Kota, Jaipur, Patiala-Rajpura, Kanpur-Lucknow, Bareilly, Gwalior and Dehradun that are meant to draw migration away from Delhi. The draft itself notes that only Jaipur and Kota had plans of action, so the policy has moved slowly.

How to Use the Plan Before You Buy

Here is a practical sequence for any NCR parcel. It takes a few hours and can save a bad purchase.

  1. Confirm the district and tehsil are in the NCR. Especially in Kotputli-Behror, where only some tehsils are included.
  2. Find the zone on the current master plan or development plan. Haryana publishes final development plans through its Town and Country Planning Department; UP development authorities such as YEIDA and GNIDA publish master plans; Rajasthan towns have master plans under the Urban Development and Housing Department. Our guides on Gurugram, Faridabad and YEIDA show how to read them.
  3. If the land sits outside any master plan, it is governed by the state's rural rules. In Haryana, check whether it is in a notified controlled area. In UP and Rajasthan, check the development authority's notified area and the conversion rules.
  4. Check NCZ, forest and Aravalli status. Ask for a written zoning or site report from the District Town Planner, and check the forest department and PLPA notifications for the village.
  5. Check acquisition notices. Planned roads and corridors mean land acquisition. A parcel on a proposed alignment may be bought by the government at a statutory price. See how to check acquisition notices and compensation under the LARR Act.
  6. Do the title work separately. Zoning tells you what you can do with land; it says nothing about who owns it. Follow the land due diligence checklist.
  7. Price on what is notified, not what is proposed. Pay for the zone the land is in today. Treat a future corridor as a possible upside, not as the basis of the price.

Claims to Treat With Caution

  • "This land is in the 1 km corridor zone, so it is commercial." No. A corridor zone in the draft Regional Plan is not a land use change. Agricultural land stays agricultural until the state zones it and a CLU is granted.
  • "NCR is shrinking, buy inside the 100 km circle." That was the 2021 draft. The Board kept the existing NCR boundary in June 2026.
  • "The Aravalli rules are going away." The proposal to dilute the Natural Conservation Zone was dropped in June 2026.
  • "A Namo City is coming here." Locations were not officially published when this guide was written. Ask for the notification.
  • "CRE-II passes through this village." CRE-II is a list of towns in a draft. There is no notified village-level alignment in the plan.
  • "RP-2041 is in force." Not until it is notified. Until then, RP-2021 applies.

Frequently Asked Questions

Is NCR Regional Plan 2041 notified?
The NCR Planning Board approved final modifications on 16 June 2026, but as of November 2026 we could not find a gazette notification of the final plan. Regional Plan 2021 remains in force until RP-2041 is notified. Check the NCRPB website for the latest status.
Will the NCR shrink to 100 km from Delhi?
That was proposed in the December 2021 draft. In June 2026 the Board decided to keep the existing NCR extent of 55,083 sq km, so districts such as Jind, Karnal and Bhiwani remain in the NCR.
Which districts are in the NCR?
All of NCT Delhi; 14 districts of Haryana; 8 districts of Uttar Pradesh; and in Rajasthan, Alwar, Khairthal-Tijara, Bharatpur and Deeg in full, plus five tehsils of Kotputli-Behror (Behror, Neemrana, Bansur, Mandan and Narayanpur) after the July 2026 notification.
What is the Natural Conservation Zone in the NCR?
It is a category created in Regional Plan 2021 for the Aravalli ridge, forests, rivers, sanctuaries and major water bodies, where construction is tightly restricted, commonly cited as 0.5% of the area. The Board decided in June 2026 to keep it in RP-2041.
Does the Regional Plan allow farmhouses on agricultural land?
The Regional Plan does not set farmhouse rules. Those come from each state's laws and master plans. The plan's general direction is to keep rural land agricultural and concentrate building in planned zones, so check the state rules for your parcel.
Does land within 1 km of an expressway become commercial?
No. The draft proposes a Highway Corridor Zone for planned development along expressways and highways, but the land use only changes when a state plan zones it and a change of land use is approved. Access-controlled expressways also do not give direct entry to roadside land.
Where are the four Namo Cities?
Reports after the June 2026 Board meeting describe four transit-oriented Namo Cities along Namo Bharat RRTS corridors, but their exact locations had not been officially published at the time of writing.
Where can I read the Regional Plan?
The Draft Regional Plan 2041 (December 2021) and Regional Plan 2021 are published on the NCR Planning Board website, ncrpb.nic.in. The final RP-2041 should appear there once notified.

Sources

This guide explains a planning document and is not legal advice. Zoning for a specific khasra must be confirmed with the state town planning department or development authority. Spotted an error? Write to wiki@farmlandindia.com.

Buying land in the NCR?

Every parcel on Farmland India is reviewed for title, zoning and access before it is listed. Start with land whose paperwork has already been checked.

Browse parcels

Related reading

From the blog

← All P07 Master Plan & Zoning guides

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction β€” including verification of land records, encumbrance searches, approvals and regulatory compliance β€” through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.