Farmland India
Peri-urban paddy and vegetable fields near Guwahati in Kamrup Metropolitan, Assam, with low green hills and a hazy sky

District guide

Buying Land in Kamrup Metropolitan (Guwahati)

Assam's capital district: Guwahati and its fringe, two Brahmaputra bridges, a new airport terminal and master plan zoning that decides land use.

  • 1,528 sq km

    Area (district portal)

  • 12,60,419

    Population (Census 2011)

  • 5

    Revenue circles

  • Semi-critical

    Guwahati block groundwater (CGWB 2024)

District land record — Kamrup Metropolitan

Rev. 2026 · Farmland India desk

State

Assam

Revenue structure

One sub-division with five revenue circles: Guwahati, Dispur, Sonapur, Chandrapur and Azara, plus three development blocks (Chandrapur, Dimoria and Rani) and 316 villages, as listed on the district portal[2].

Key markets

Guwahati city (Dispur, Beltola, Khanapara, Jalukbari, Six Mile) · Sonapur · Azara · Chandrapur · Garchuk

Demand anchors

State capital at Dispur · Lokpriya Gopinath Bordoloi International Airport · two Brahmaputra crossings at Guwahati · Guwahati Municipal Corporation (31 wards)

Planning body

Guwahati Metropolitan Development Authority (GMDA): Guwahati Master Plan 2025 as modified, with a Draft Master Plan 2045 under discussion

Size and population

About 1,528 sq km and 12,60,419 people at the 2011 Census (district portal[2])

Pricing unit

No official farmland price series is published for Kamrup Metropolitan. Ask the sub-registrar for recent registered sale values in the village you are looking at.

Local units

Records use bigha, katha and lessa (1 bigha = 5 katha; 1 katha = 20 lessa; one Assam bigha is about 14,400 sq ft, roughly a third of an acre)

Land records portal

ILRMS at ilrms.assam.gov.in for the jamabandi, Bhunaksha for maps, Basundhara for mutation; see our Assam land records guide

District overview

Kamrup Metropolitan — Guwahati, the capital district

Kamrup Metropolitan is the district around Guwahati, Assam's largest city and the seat of the state government at Dispur. It covers about 1,528 sq km and had 12,60,419 residents at the 2011 Census (district portal[2]). It is administered as a single sub-division with five revenue circles (Guwahati, Dispur, Sonapur, Chandrapur and Azara) and three development blocks.

The city is built along the Brahmaputra. The main city lies on the south bank, while North Guwahati, IIT Guwahati and Amingaon lie across the river in rural Kamrup, which has its own page. Two road links cross the river at Guwahati: the older Saraighat rail-cum-road bridge and the Kumar Bhaskar Varma Setu, an extradosed bridge that Prime Minister Modi inaugurated on 14 February 2026 (Lokmat Times[10]).

Kamrup Metropolitan was split from the original Kamrup district, and the remaining rural Kamrup is a separate district with its own page. In this district, the land buyer meets three markets at once: urban plots inside municipal limits, peri-urban land in the circles around the city, and farm and hill land at the edges. Each is governed differently, which is why the zoning and record checks above matter more here than anywhere else in the state.

Buyers are mostly local residents and families from across Assam and the north-east, plus business owners and investors from outside the state who want a base in Guwahati. Farmland proper is a smaller part of the district than in neighbouring Kamrup; the agriculture figures later on this page come from a plan that covers both districts together.

Daily life and demand follow the airport, the state government and the education and health institutions. The new terminal at Lokpriya Gopinath Bordoloi International Airport became operational on 23 February 2026 (Sentinel Assam[9]).

Read the Assam guide for the statewide rules, then use this page for the district specifics. Browse reviewed land through the Kamrup Metropolitan listings below, and ask before relying on any parcel, because the same revenue village can mix residential, agricultural, hill and wetland zones.

  • Guwahati and Dispur
  • 1,528 sq km
  • Five revenue circles
  • South bank of the Brahmaputra
  • Master plan area
  • Airport district
Locator map of Kamrup Metropolitan district in Assam with Guwahati marked and nearby towns

Transaction costs

Stamp duty & registration in Kamrup Metropolitan

Stamp duty

Conveyance of land

1% for a woman buyer alone, 2% joint with a woman, 3% for a man or other buyer (Assam amendment of 2021, per the CAG report to March 2024)

Registration fee

Same 1 / 2 / 3% pattern

Effective 22 September 2022; the male rate was 2% earlier ([CAG audit report 2025](https://cag.gov.in/uploads/download_audit_report/2025/Chapter-VI-069a1724c0cdaa1.48254278.pdf))

Surcharge

1% in municipal areas

Applies to land in municipal areas; check whether the plot is inside Guwahati Municipal Corporation limits or another municipal town

These rates are from the CAG audit report for the year ended March 2024 and later changes were not checked, so confirm the current figure with the sub-registrar before signing. The Deputy Commissioner's land settlement branch in Kamrup Metro issued revised zonal valuation notices for the Guwahati, Dispur, Sonapur, Chandrapur and Azara circles in 2023, with residential values rising in every revenue village and by as much as 260% in Sahar Bharalumukh (Business Northeast, 13 Jun 2023[7]). Zonal values differ by land class (for example Bari, Bhal Bari, tea and industrial), so find the class for your dag before estimating duty.

Know the belt

What is moving prices in Kamrup Metropolitan

Four pockets that shape land interest in the district

Guwahati city and Dispur

Urban core

Plots inside municipal limits are priced on location, road width and master-plan zone. The September 2025 central-business-district zoning near Kahilipara and Beltola is the largest recent change.

Check: zone on the current master plan, road reservation and GMC holding status

Jalukbari and the bridge approaches

River edge

Interest follows the two Brahmaputra crossings. Land across the river at North Guwahati and Amingaon is in rural Kamrup, not this district. The ring road and the second Saraighat bridge would add to this edge, but both are still pre-completion.

Check: distance from the bridge approaches, flood level and any acquisition notice

Sonapur, Azara and the airport side

West and south-west

Circles around the airport and the western approach to the city. Activity here tracks the airport expansion and the planned Airport–Jalukbari elevated corridor.

Check: acquisition notices for road or corridor alignments, and the land class

Chandrapur and the rural fringe

Farm and hill edge

The least urban part of the district, with paddy and areca land and hill slopes. Prices and rules differ sharply from the city.

Check: patta type, slope and drainage, and whether any belt or block applies

Asking prices

Asking prices in Guwahati vary widely with zone and road access. Compare any quote with registered deeds for the same revenue village.

Connectivity

How Kamrup Metropolitan connects — road, rail and air

Road, rail and air links for the district

🚗 By road

Within the districtThe city sits mainly on the south bank; the Saraighat bridge and the Kumar Bhaskar Varma Setu are the road crossings to the north bank
Planned bypassA 121 km Guwahati ring road with a 3 km Brahmaputra bridge is planned to take through-traffic off the city (Assam Tribune, 4 Apr 2025[8])

✈️ By air

Lokpriya Gopinath Bordoloi International AirportNew terminal operational from 23 February 2026, designed for 13.1 million passengers a year (Sentinel Assam[9])
AccessAn elevated corridor from the airport to Jalukbari is among projects announced in July 2026 (IANS via NewKerala, 18 Jul 2026[12])

🚆 By rail

StationsGuwahati and Kamakhya are the main stations; Maligaon hosts the Northeast Frontier Railway headquarters
Second Saraighat bridgeA rail-cum-road bridge, with a double rail line on the lower deck, is planned between Kamakhya and Agthori

Guwahati is the road, rail and air hub for the north-east, so almost every location in the district is within an hour or two of an airport and a railway station, subject to city traffic. The more useful question for a buyer is which crossing or corridor serves the plot.

Growth catalysts

Upcoming infrastructure & developments

Project status as reported, with the source and date for each

02Open

06Catalysts

Operational · terminal opened 23 Feb 2026LGBI Airport new terminal
Operational · inaugurated 14 Feb 2026Kumar Bhaskar Varma Setu
Approved · construction status not reportedGuwahati ring road (121 km)
Tendered · piling scheduled Oct 2026Second Saraighat rail-cum-road bridge
Announced · July 2026Airport–Jalukbari elevated corridor
Notified · effective 1 Sep 2025Central business district zoning
Operational · terminal opened 23 Feb 2026

LGBI Airport new terminal

The new terminal at Guwahati's Lokpriya Gopinath Bordoloi International Airport was inaugurated on 20 December 2025 and became operational on 23 February 2026, with capacity for 13.1 million passengers a year.

Source: Sentinel Assam[9]

Capacity

13.1 million a year

Opened

23 Feb 2026

Phase

Terminal in service

Land markets in the blast radius

  • Azara
  • Sonapur
Operational · inaugurated 14 Feb 2026

Kumar Bhaskar Varma Setu

An extradosed bridge across the Brahmaputra linking Guwahati and North Guwahati, described by the press as the first of its kind in the north-east. It was inaugurated by Prime Minister Modi on 14 February 2026.

Source: Lokmat Times, 14 Feb 2026[10]

Type

Extradosed bridge

Link

Guwahati to North Guwahati

Opened

14 Feb 2026

Land markets in the blast radius

  • Jalukbari
  • Bharalumukh
Approved · construction status not reported

Guwahati ring road (121 km)

A 121 km project of Rs 5,729 crore on a build-operate-toll basis, with a 56 km four-lane northern bypass, an 8 km NH-27 bypass widened to six lanes, 58 km of NH-27 improvement and a 3 km Brahmaputra bridge. The article reports no award or start date.

Source: Assam Tribune, 4 Apr 2025[8]

Length

121 km

Cost

Rs 5,729 crore

Model

BOT, 30-year concession

Land markets in the blast radius

  • Chandrapur
  • Jalukbari
Tendered · piling scheduled Oct 2026

Second Saraighat rail-cum-road bridge

A 1.3 km double-deck bridge with rail on the lower deck and road above, part of the Agthori–Kamakhya doubling. Geotechnical work is complete, design and drawings are being prepared, and land and utility issues are being worked through.

Source: Construction World, 28 Sep 2026[11]

Bridge length

1.3 km

Decks

Rail below, road above

Piling

From Oct 2026

Land markets in the blast radius

  • Kamakhya side
  • Agthori side
Announced · July 2026

Airport–Jalukbari elevated corridor

Part of a Rs 17,235 crore programme described by the Chief Minister, along with four-laning of Baihata Chariali–Mission Chariali and a new Brahmaputra bridge linking Morigaon and Darrang. No start dates or contractors were reported.

Source: IANS via NewKerala, 18 Jul 2026[12]

Programme

Rs 17,235 crore

Corridor

Airport to Jalukbari

Status

Proposed

Land markets in the blast radius

  • Azara
  • Jalukbari
Notified · effective 1 Sep 2025

Central business district zoning

GMDA modified the master plan to create a central business district, reclassifying 1,064 bighas 2 katha 4 lessa in Jatia, Bhoger Gaon Grant, No. 2 Kahilipara and part of Beltola mouza as Composite Use-I, allowing high-order commercial, financial and hospitality uses.

Source: Sentinel Assam, 29 Sep 2025[5]

Area

1,064 bigha 2 katha 4 lessa

New zone

Composite Use-I

Effective

1 Sep 2025

Land markets in the blast radius

  • Kahilipara
  • Beltola

Agriculture & terrain

Soil, crops & water in Kamrup Metropolitan

Combined Kamrup data: rice, areca nut and fruit, mostly rain-fed

Crops

The ICAR-CRIDA contingency plan covers Kamrup and Kamrup Metropolitan together and uses 2008–10 data, so treat it as a guide (ICAR-CRIDA[3]). Winter rice was grown on 92,570 ha, summer rice on 43,828 ha and autumn rice on 15,305 ha, with rapeseed-mustard, pulses, areca nut (7,300 ha), banana, orange and pineapple.

  • Winter rice
  • Summer rice
  • Areca nut
  • Banana and orange

Rainfall and irrigation

The combined plan gives a normal annual rainfall of 1,796 mm, mostly from the south-west monsoon, and records only 2.58% of cultivated land as irrigated, with bore wells making up most of that (ICAR-CRIDA[3]).

Groundwater and floods

The CGWB 2024 assessment lists one semi-critical block in all of Assam, and it is Guwahati (CGWB[4]). Flood is a regular contingency in July–August in the combined Kamrup plan.

At a glance

Kamrup Metropolitan vs. nearby districts

DistrictLand and waterWhat links it to Kamrup Metropolitan
Kamrup (rural)Rice, areca and fruit land, mostly rain-fedCarved from the same original district; the ICAR plan covers both and many buyers compare the two
Morigaon (east)Flood-plain plains of the BrahmaputraA new Brahmaputra bridge between Morigaon and Darrang is among the projects announced in July 2026
Darrang (north bank)North-bank plains and char landAnother north-bank market served by the same proposed bridge programme

The city is the main reason to look at Kamrup Metropolitan rather than its neighbours. Rural Kamrup and the districts beyond the river offer larger parcels at the cost of weaker urban services.

Paddy field with an earthen bund and areca palms on the fringe of Guwahati, Kamrup Metropolitan, Assam

District report — Kamrup Metropolitan

Farmland India view

Why investors look at Kamrup Metropolitan

Five reasoned points for Kamrup Metropolitan, each tied to a source on this page.

The capital and airport anchor demand

Dispur is the seat of the state government and the new airport terminal opened in February 2026, which supports long-run demand for land. That demand mostly concentrates inside the city rather than on farmland at the edge.

Two bridges and a ring road reshape access

One new Brahmaputra bridge is open, a second rail-cum-road bridge is moving towards piling, and the ring road is approved but not reported under construction. Land near approaches to each can gain, but acquisition notices can also cut a plot, so ask before paying an advance.

Master plan zoning is the main value lever

A plot's zone often matters more than its soil or size. The September 2025 central-business-district notification shows that zoning can change in a stroke, and the 2045 draft shows further change is possible, so buy against the plan in force and not the draft.

City plots and farm plots are different assets

Inside municipal limits the stamp duty carries a 1% surcharge and the 2015 reclassification Act is described as excluding such areas. At the edge, farm land follows the agricultural rules on the state page. Decide which you are buying before you compare quotes.

No published price series, so use the zonal value

Use the current zonal value for your village and class as the floor of your analysis and check registered deeds for the market.

Browse reviewed land across Assam, including Kamrup Metropolitan

Confirm the record of rights (jamabandi and chitha), mutation, zoning and acquisition status directly — these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Kamrup Metropolitan

District-specific risks. Read the Assam state page for the general risks on ceiling, conversion and records.

Flooding and waterlogging

Low-lying parts of the city and the beel areas flood in heavy rain, and the state record shows about 40% of Assam as flood-prone. Visit the plot in the monsoon and ask about past water levels.

Hill slopes and wetlands

Guwahati has protected hills and wetlands in its master plan, and the draft proposes mixed use near Silsako and Jalah beels. Check the zone and any restriction on cutting or filling.

Master plan changes

The September 2025 central-business-district notification and the 2045 draft show that zones can change. A plot that is residential today may be reclassified, and the reverse.

Groundwater stress

Guwahati is the only semi-critical block in Assam on the CGWB 2024 assessment. Ask about water supply and borewell depth, particularly for bulk plots.

Government land and encroachment

Hill and wetland land is sometimes government land, and some plots have a history of encroachment. Ask the circle office to confirm the land's classification and ask for the chitha and the latest mutation.

Acquisition for roads and bridges

The ring road, bridge approaches and the elevated corridor all need land. Ask whether the plot lies on an alignment before paying an advance.

Who to contact

Local revenue & planning offices

Start at the Deputy Commissioner's office, Kamrup Metropolitan, Guwahati (district portal[2]), which runs the land settlement branch and the five revenue circle offices (Guwahati, Dispur, Sonapur, Chandrapur and Azara). Registration is at the sub-registrar offices under the Inspector General of Registration, Assam. For zoning and building permissions, approach GMDA and Guwahati Municipal Corporation. Online record services are at ILRMS, Bhunaksha and Basundhara; see the Assam land records guide.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Kamrup Metropolitan.

Visit full wiki

01 of 04

Which rules apply to land inside Guwahati city limits?

Two checks come first: whether the plot lies inside Guwahati Municipal Corporation limits or the GMDA planning area, and which master plan zone it sits in. Assam's 2015 reclassification Act excludes municipal corporation areas, so the route to non-agricultural use can differ inside and outside city limits. Get the answer in writing from the circle office.

Transparency

Sources and references

Law and courts

Government

News

Data-currency note: sources were read in November 2026. Project status, the benchmark valuation and land rules change often; check the linked source and the relevant office before relying on any figure.

For developers

Ready to explore Kamrup Metropolitan farmland?

Browse reviewed projects and individual land parcels across Kamrup Metropolitan — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.