Farmland India
Flat paddy plain with a wetland edge, mustard patches, bamboo and areca clumps in Nagaon district, Assam

District guide

Buying Land in Nagaon

A central Assam rice and river district where the Kaziranga road upgrade, Kopili floods and municipal limits shape the plot you can buy.

  • 2,287 sq km

    District area (district profile)

  • 85.675 km

    Kaliabor–Numaligarh NH-715 (CCEA, Oct 2025)

  • 181

    High and very high flood-prone villages (district plan)

  • 3%

    Stamp duty, men (CAG)

District land record — Nagaon

Rev. 2026 · Farmland India desk

State

Assam (not a Sixth Schedule district)

Formation and division

District headquartered at Nagaon town in central Assam. Hojai was carved out of Nagaon in 2015, merged back on 31 December 2022 and restored from 1 January 2024. Assam now lists 35 districts (Government of Assam[3])

Key markets

Nagaon town and Haibargaon, Raha, the Silghat–Kaliabor belt, and the Kopili flood plain around Dhing, Kampur and Samaguri

Demand anchors

The east-west highway through the district, the jute mill at Silghat, the rice trade of the Kolong valley and the Kaziranga approach on the Brahmaputra side

Rail

The district profile lists the stations at Nagaon, Haibargaon, Dhing, Silghat and Kampur, with Chaparmukh and Lumding as important junctions (district profile[4])

Size and population

The district profile gives 2,287 sq km, 7 revenue circles, 13 development blocks, 2 municipal boards (Nagaon and Raha) and 960 revenue villages. The 2011 Census count of 28.26 lakh was for the undivided district, including today’s Hojai (CGWB[5])

Pricing unit

Quote and compare land per acre or per sq yd. Local talk is in bigha and katha, so convert before comparing

Local units

Records and sellers use bigha, katha and lessa: 1 bigha is 5 katha and 1 katha is 20 lessa, and an Assam bigha is about 14,400 sq ft, roughly one-third of an acre. Convert every offer to acres or sq yd before comparing; this page does not price land per bigha

Land records portal

Jamabandi and chitha are viewed on the state land records system, ILRMS[6]; see the Assam land records guide for how to read them

District overview

Nagaon — a central Assam district on the Brahmaputra and Kolong rivers, where the Kopili floodplain meets the Kaziranga road upgrade

Nagaon (Nowgong in older records) lies in central Assam between the Brahmaputra on its northern edge and the hill districts to the south. The Kolong river runs through the middle of the district past Kaliabor, Nagaon and Raha, and the Kopili joins it near Jagiroad. Nagaon town is the district headquarters.

The district profile gives an area of 2,287 sq km, seven revenue circles and thirteen development blocks. The disaster plan names the revenue circles of Dhing, Kaliabor, Kampur, Nagaon, Raha and Samaguri (district plan[8]). Ask for the circle and the mouza of the plot first, because land officers work by those units.

Who buys: mostly local families, traders from Nagaon and Raha, and people with ties to the Kaliabor and Silghat belt. Buyers from Guwahati, about 120 km away by road, come mainly for weekend and farm use.

Why it matters: the Union Cabinet approved a 85.675 km four-lane Kaliabor–Numaligarh section of NH-715 on 1 October 2025, with a 34 km elevated corridor through Kaziranga and bypasses at Jakhalabandha and Bokakhat (The Assam Tribune[10]). That puts the Kaliabor side of Nagaon at the start of a major upgrade, though no timetable has been published.

What to check first: the revenue circle and mouza, the municipal limit, the embankment position, the forest boundary and the patta type.

  • Nagaon
  • Raha
  • Kaliabor
  • Silghat
  • Dhing
  • Samaguri
Locator map poster of Nagaon district in Assam, with Nagaon marked as district headquarters and Raha, Kaliabor, Silghat and Dhing as other towns

Transaction costs

Stamp duty & registration in Nagaon

1%

Stamp duty, woman solely (CAG)

on conveyance

2%

Stamp duty, joint with woman (CAG)

on conveyance

3%

Stamp duty, men and others (CAG)

on conveyance

These stamp duty rates on conveyance come from the Comptroller and Auditor General’s state revenue audit (CAG report[2]), which cites the Indian Stamp (Assam Amendment) Act 2021 and the notification of 16 September 2021. The registration fee in force since 22 September 2022 follows the same 1%, 2% and 3% pattern, and land in municipal areas carries a further 1% municipal surcharge. The audit covers the year to March 2024. Nagaon and Raha are municipal boards, so the 1% surcharge may apply to a plot inside their limits. Ask the sub-registrar at Nagaon for the rate on the day of registration.

Know the belt

What is moving prices in Nagaon

Land-use notes for each belt; no listing-site prices are used

Nagaon town and Haibargaon

District HQ and rail head

Nagaon town became a municipality in 1893, according to the district plan, and is the largest market in the district. Land close to the town is sold for housing and shops, and rail stations at Nagaon and Haibargaon feed the trade.

Check: the municipal boundary, the town’s master-plan zone if any and the drain and canal lines

Raha

Highway town on the Kolong

Raha is a municipal board on the east-west highway and on the Kolong river, where the plan records flood gauge readings. Roadside plots are priced for business use, while land across the river is more exposed to floods.

Check: the flood history of the mouza and the width of the highway right-of-way

Kaliabor and Silghat

Brahmaputra edge and the Kaziranga approach

Kaliabor sub-division faces the Brahmaputra and the park. Silghat has a rail station and a river crossing, and the NH-715 upgrade starts at the Kaliabor end. Embankment breaches in 2017 and 2024 show how quickly this belt floods.

Check: the embankment line, the forest or park boundary and the acquisition notice for the NH-715 upgrade

Dhing, Kampur and Samaguri

Kopili and Kolong plain

This is a rice and vegetable plain with rail stations at Dhing and Kampur. The Kopili reached 62.20 m at Kampur in June 2022 against a danger level of 60.50 m, so flood risk is part of the price.

Check: the last flood line, the date of the latest survey and the access road in the monsoon

Asking prices

No official farmland price series is published for Nagaon. Ask the sub-registrar for recent registered sale values in the village you are looking at Use the minimum zonal value from the sub-registrar as the legal floor and compare it with deeds registered in the same revenue village over the last year.

Connectivity

How Nagaon connects — road, rail and air

The east-west highway, the Silghat bridge and the north-bank rail link

🚗 By road

HighwaysThe district profile lists NH 36, NH 37 and NH 37A, which are older route numbers, and says Guwahati is about 120 km away by road (district profile[4]). Check current numbering with NHAI or the Public Works Department
Kaliabor–NumaligarhThe approved four-lane NH-715 upgrade runs from Kaliabor to Numaligarh and includes a Kaziranga elevated corridor (The Assam Tribune[10])
Across the riverThe Kolia Bhomora bridge near Silghat links Nagaon with Sonitpur and the north bank, and is the usual route today between the two banks in this reach (The Assam Tribune[11])

🚆 By rail and air

RailStations are listed at Nagaon, Haibargaon, Dhing, Silghat and Kampur, with Chaparmukh and Lumding as junctions
AirportThe district profile gives the nearest airport as Borjhar (Guwahati), about 140 km from Nagaon

Road and rail access is better in Nagaon than in most Assam districts, but that is mostly true on the main corridor. A plot on a rural road in the Kopili or Kaliabor plain can be hard to reach during floods.

Growth catalysts

Upcoming infrastructure & developments

One approved highway upgrade and one tunnel link change the map around Nagaon

00Open

02Catalysts

Approved · CCEA, 1 October 2025Kaliabor–Numaligarh NH-715 four-laning with Kaziranga corridor
Approved · CCEA, 14 February 2026Gohpur–Numaligarh tunnel and the Nagaon crossing
Approved · CCEA, 1 October 2025

Kaliabor–Numaligarh NH-715 four-laning with Kaziranga corridor

The Cabinet Committee on Economic Affairs approved a four-lane upgrade of 85.675 km of NH-715 at Rs 6,957 crore on EPC terms. About 34 km is an elevated corridor through Kaziranga for wildlife to cross, with 30.22 km of existing road upgraded and 21 km of greenfield bypasses at Jakhalabandha and Bokakhat. The report gave no construction or completion date.

Source: The Assam Tribune: Centre clears Rs 6,957 cr Kalibor–Numaligarh four-laning with 34 km Kaziranga corridor, 1 October 2025[10]

Length

85.675 km

Cost

Rs 6,957 crore

Land markets in the blast radius

  • Kaliabor
  • Jakhalabandha
Approved · CCEA, 14 February 2026

Gohpur–Numaligarh tunnel and the Nagaon crossing

The Gohpur–Numaligarh road-cum-rail tunnel under the Brahmaputra is meant to cut the roughly 240 km, six-hour road trip between the two sides via the Silghat bridge to about 34 km. It is in Biswanath and Golaghat rather than Nagaon, but it would take through traffic off the Silghat crossing. No start or completion date was given.

Source: The Assam Tribune: Centre clears India’s first Rs 18,662 cr rail-road tunnel under Brahmaputra, 14 February 2026[11]

Corridor

33.7 km

Cost

Rs 18,662 crore

Land markets in the blast radius

  • Silghat

Agriculture & terrain

Soil, crops & water in Nagaon

Rice, vegetables and jute on a flood-fed alluvial plain

Crops and land use

The 2026 disaster plan records a gross cropped area of 286,872 ha against a net cropped area of 271,285 ha, a cropping intensity of 192%, and about 120,105 ha under rice. Horticulture covers about 16,958 ha, with vegetables, areca nut, banana and pineapple among the crops, and irrigated area is only about 13,461 ha, roughly 2% of cultivated land (district plan[8]). The plan’s own area figures (4,002 and 3,831 sq km) differ from the district profile’s 2,287 sq km, so treat these tables as indicative.

  • Rice (ahu, sali and boro)
  • Vegetables and mustard
  • Areca nut and banana
  • Pineapple and citrus

Groundwater

The CGWB booklet for undivided Nagaon (3,993 sq km, 2009 resource data) put groundwater development at 39% and the district in the safe category, with no arsenic detected and iron and fluoride pockets in places (CGWB[5]). Both the area and the data are older than today’s boundaries. In the 2024 statewide assessment only one block, in Guwahati, was semi-critical (CGWB[9]).

Flood and erosion

The plan lists 75 very high and 106 high flood-prone villages, erosion at Bhurbandha, Rupahihat, Lawkhowa and Dhing, and floods in every year from 2010 to 2025. The Kopili reached a record 61.79 m at Kampur in 2004 and 62.20 m in 2022 (district plan[8]).

At a glance

Nagaon vs. nearby districts

DistrictLand and waterWhat links it to Nagaon
Hojai (south-east)Foothill and forest-edge district carved out of Nagaon in 2015, with the Kopili and Jamuna riversShared Kopili floodplain; records of the two districts overlap before 2015
Morigaon (west)Small, flood-prone district on the Brahmaputra and KolongAdjacent plain along the same east-west corridor
Karbi Anglong (south)Sixth Schedule hill district with its own land lawHill land is outside the 2015 Act and the reclassification route
Golaghat (east)Upper Assam district with the other half of KazirangaNH-715 upgrade ties Kaliabor to Bokakhat

All of these except Karbi Anglong run under the same Assam land law and stamp duty pattern. The plot-level facts of flood history, municipal limits and tribal belts do more to explain a price gap than the district name.

A Nagaon rice field on the Kolong plain with a tubewell, banana plants and a raised village road

District report — Nagaon

Farmland India view

Why investors look at Nagaon

Five reasoned points for Nagaon, each tied to a source on this page.

Stay on the high side of the embankment

Hatimura breached in 2017 and 2024, and the Kopili crossed its danger level at Kampur in 2022. The side of the embankment matters more than the distance to town.

Treat the Kaziranga road as a watch item

The upgrade is approved but not scheduled, and the elevated corridor is a wildlife measure, not a land-development plan. Acquisition for bypasses at Jakhalabandha comes first.

Buy in the established belt for liquidity

Nagaon, Raha and the Silghat stretch have a deeper resale market than the interior circles. A farm plot far from the highway is slower to sell.

Plan conversion early

Farm land used for a non-farm purpose needs reclassification and Deputy Commissioner permission, with a premium, under the 2015 Act. Plots inside the Nagaon or Raha municipal limits are outside the Act.

Browse reviewed land across Assam, including Nagaon

Confirm the jamabandi (record of rights), khasra number, mutation, zoning and acquisition status directly — these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Nagaon

District-specific risks. Read the Assam state page for the general risks on ceiling, conversion and records.

Floods and embankment breaches

Floods have been recorded every year from 2010 to 2025. Ask neighbours about the worst year, not the average one.

Forest, park and sanctuary edges

Plots near Kaziranga or Lawkhowa can touch forest or eco-sensitive limits. Ask for the position in writing.

Tribal belt or block

If the plot is in a notified belt or block, only protected classes of buyers can acquire it, and section 164 of the 1886 Regulation restricts sale, mortgage and lease. Ask the Circle Officer for a written position.

Project land acquisition

Plots on the NH-715 bypass alignments can be taken for the project. Compensation depends on the land class on the notification date.

Records and mutation

Records are online, but delayed mutation and boundary gaps still happen. Hojai-era records need extra checking for villages on the old district boundary.

Inter-religion transfers

A cabinet SOP of 27 August 2025 sets a screening step by the Deputy Commissioner for transfers between people of different religions (The Assam Tribune[12]). Transfers within the same religion are unaffected.

Who to contact

Local revenue & planning offices

The Deputy Commissioner’s office at Nagaon is the district authority for land revenue and reclassification; the Circle Officers (Nagaon, Raha, Kaliabor, Dhing, Kampur, Samaguri and others) handle mutation and records; the sub-registrar registers deeds. Check the jamabandi on ILRMS[6] and ask for the minimum zonal value at the sub-registrar’s office.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Nagaon.

Visit full wiki

01 of 04

Is Nagaon a Sixth Schedule district?

No. Nagaon is not among the Sixth Schedule areas, which are Karbi Anglong, West Karbi Anglong, Dima Hasao and the Bodoland region. Parts of a plains district can still lie in a notified tribal belt or block, so ask the Circle Officer in writing.

Transparency

Sources and references

Law and courts

Government

News

Data-currency note: Sources reviewed in November 2026. Project status, the benchmark valuation and land rules change often; check the linked source and the relevant office before relying on any figure.

For developers

Ready to explore Nagaon farmland?

Browse reviewed projects and individual land parcels across Nagaon — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.