Farmland India
Aerial view of paddy fields and forest near Gadchiroli, Maharashtra, with the Wainganga river in the distance

District guide

Buying Land in Gadchiroli

A forest-heavy tribal district of paddy farms on the Wainganga plain, with an approved expressway, an airport plan on hold, iron-ore mining and an estimated land price* that varies widely by belt.

  • 14,412 sq km

    Area (district portal)

  • 38.70%

    Scheduled Tribe share (Census 2011)

  • ₹1–25 lakh per acre

    Estimated land price*

  • 94.241 km, acquisition approved Feb 2026

    Bhandara–Gadchiroli expressway

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

District land record — Gadchiroli

Rev. 2026 · Farmland India desk

State

Maharashtra (Vidarbha); a tribal district, 38.70% Scheduled Tribe population in Census 2011 (Gadchiroli district portal profile)

Sub-divisions

The district portal lists 12 tehsils: Gadchiroli, Armori, Kurkheda, Dhanora, Chamorshi, Sironcha, Desaiganj (Wadsa), Korchi, Bhamragad, Mulchera, Aheri and Etapalli (Gadchiroli district portal profile), in six sub-divisions (Gadchiroli district portal, about the district)

Key markets

Gadchiroli town · Chamorshi · Armori · Desaiganj (Wadsa) · Kurkheda

Demand anchors

Bhandara–Gadchiroli expressway (land acquisition approved Feb 2026) · Chamorshi airport and industrial land (on hold Jun 2026) · iron-ore mining and steel expansion (reported Aug 2025)

Rail

We found no sourced rail-line figure or station list for the district; check Indian Railways

Size and population

14,412 sq km · 10,72,942 people (Census 2011) (Gadchiroli district portal profile); the ICAR-CRIDA plan gives 1,492 thousand hectares, so sources differ (ICAR-CRIDA Gadchiroli plan)

Estimated land price*

₹1–25 lakh per acre depending on the belt, with limited saleable stock in tribal and forest areas (indicative; see the note under the price table)

Pricing unit

₹/acre (farm land) · ₹/guntha or ₹/sq m for small plots

Local units

Acre = 40 gunthas = 43,560 sq ft; 1 guntha = 1,089 sq ft; 1 hectare = 2.47 acres. Local terms vary by tehsil, so convert any quote

Land records portal

Digital 7/12 and 8A extracts through the state land-records portal; the portal was not opened for this page

District overview

Gadchiroli — a forest-heavy tribal district with an expressway, an airport plan and iron-ore mining

Gadchiroli district has 14,412 sq km and 10,72,942 people in the 2011 Census, of whom 38.70% are Scheduled Tribe, and it was created on 26 August 1982 out of Chandrapur (Gadchiroli district portal profile; Gadchiroli district portal, about the district). The Godavari forms its southern boundary, the Pranhita is formed near Chaprala village in Chamorshi taluka, and the Wainganga, Indravati and others drain it. The district portal calls paddy the main crop and bamboo and tendu leaves the best-known forest produce, and forest covers somewhere between about 70% and 90% of the area depending on the source.

We found no registered-deed series for farm land and no district ready-reckoner table. A reported compensation outlay for the Chamorshi airport is the only dated land-cost signal we found, and it covers one site (The Hitavada, May 2026). The estimated bands on this page, from about ₹1 lakh to ₹25 lakh per acre*, are wide and indicative: the Wainganga plain around Gadchiroli town, Chamorshi and Armori sits at the top, and the remote forest and tribal tehsils at the bottom.

Three state decisions drive the news. A land-acquisition approval of Rs 931.15 crore for the 94.241 km Bhandara–Gadchiroli expressway came in February 2026 (Swarajya, February 2026), the Chamorshi airport acquisition was paused in June 2026 after a farmers’ march (Swarajya, June 2026), and iron-ore mining and steel expansion were reported in August 2025 (The Week, August 2025).

  • Gadchiroli town
  • Chamorshi
  • Armori
  • Desaiganj
  • Kurkheda
  • Bhandara–Gadchiroli expressway
Locator map of Gadchiroli district in Maharashtra showing Gadchiroli, Chamorshi, Armori, Desaiganj and Kurkheda

Transaction costs

Stamp duty & registration in Gadchiroli

5% + 1%

Municipal corporation and council areas

of market value in the Act text to May 2019; a further 1% from 8 Feb 2019 in notified areas

4%

Gram panchayat and other areas

of market value in the same Act text

1%

Registration fee

capped at Rs 30,000 in the same text

The figures above come from a reproduction of Article 25 of the Maharashtra Stamp Act, 1958 amended to May 2019 (Maharashtra Stamp Act text to May 2019), and the Rs 30,000 registration-fee cap is repeated in a May 2025 report (Free Press Journal, May 2025). The additional 1% for metro and infrastructure was still mentioned as current in April 2025 (Business Standard, April 2025). The grantee bears the duty unless the parties agree otherwise, and an understated value draws the shortfall plus a penalty of 2% a month, capped at four times the deficit (Maharashtra Stamp Act PDF, IGR). The IGR home page we opened gives no rate table (IGR Maharashtra), so the current schedule is unconfirmed; read it from the department or the Sub-Registrar before budgeting. The May 2025 cabinet waived the registration fee on partition documents for agricultural land, not on sale deeds, and a May 2026 report of an exemption on land purchases did not say which purchases it covers (Nation Press, May 2026). For tribal sellers the registration also depends on the permission and status checks on this page, so budget time for them, not only duty.

Know the belt

What is moving prices in Gadchiroli

Expressway, airport and mining news, plus wide indicative price bands marked *. No registered-deed series was found.

Gadchiroli town, Chamorshi and Armori (Wainganga plain)

Estimated land price*: ₹6–25 lakh per acre

This is where the expressway interchanges, the airport proposal and the industrial land pursuit all sit (Swarajya, February 2026; The Hitavada, May 2026; Swarajya, June 2026). We found no dated rate for farm land, so the band is a wide, rounded range by analogy with comparable Vidarbha districts and is not a deal price.

Check: acquisition notifications, forest status and the access road in the record.

Kurkheda, Desaiganj, Dhanora and Aheri

Estimated land price*: ₹2–10 lakh per acre

Paddy is the main crop in the plan, on mostly deep black soils (ICAR-CRIDA Gadchiroli plan). We found no dated rate here, so the band is a wide, indicative range.

Check: tribal-holder status, forest-rights entries and irrigation source.

Sironcha, Bhamragad, Etapalli, Korchi and Mulchera

Estimated land price*: ₹1–5 lakh per acre

These are remote, forest-heavy tehsils where legal status decides saleability more than price. We found no dated rate, so the band is a wide, indicative range for the few parcels that can be sold.

Check: whether the land is revenue land, tribal-held or forest, and whether road access is recorded.

Chamorshi airport site

Reported acquisition, now paused

The state approved Rs 104 crore to acquire about 311.81 hectares, of which 245.75 ha is private land, with Rs 76.99 crore for private-land compensation, in Chamorshi taluka (The Hitavada, May 2026). The acquisition was paused on 5 June 2026 (Swarajya, June 2026). The report’s own figures do not fully add up, so treat them as reported.

Check: whether a parcel is in the affected mouzas and the current status.

Ready Reckoner 2025-26 and 2026-27

Rural +3.36% (2025-26); unchanged (2026-27)

The state raised rural rates by 3.36% for 2025-26 (IANS via Investment Guru India, April 2026) and kept all rates unchanged for 2026-27 (The Hitavada, April 2026). We found no Gadchiroli table.

Check: the rate in force for the village on the deed date.

Units: acres, gunthas and hectares

Records and the Act texts use acres, gunthas and hectares: 1 acre = 40 gunthas = 43,560 sq ft, 1 guntha = 1,089 sq ft (The Week, July 2025) and 1 hectare = 2.47 acres. Local trade terms can differ between tehsils, so ask the seller for the 7/12 area and convert every quote to acres before comparing offers.

Connectivity

How Gadchiroli connects — road, rail and air

Only items with a source are listed; train services, bus links and flight schedules were not researched for this page.

By road

Bhandara–Gadchiroli expressway94.241 km access-controlled; land acquisition Rs 931.15 crore (Feb 2026) (Swarajya, February 2026)
Navegaon More–Konsari to Surjagad roadAbout 86 km greenfield road, approved May 2026; Surjagad end in Gadchiroli (Swarajya, May 2026)
Existing highwaysThe expressway article names NH 53 at Koknagad and NH 353D at Armori (Swarajya, February 2026)

By rail

Rail line in districtNo sourced figure found
ServicesNot researched for this page; check Indian Railways

By air

Proposed Chamorshi airportAbout 311.81 ha; Rs 104 crore approved (May 2026); acquisition paused 5 Jun 2026 (The Hitavada, May 2026; Swarajya, June 2026)
Site choiceThe Airport Authority of India reportedly recommended Chamorshi from three proposed sites (The Hitavada, May 2026)

The practical question is the last leg from the highway to the parcel; ask for the access road in the revenue record. Full rules for buyers: state-wise land laws.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked reported rest on a single outlet.

01Open or inaugurated

03In progress or pending

Land acquisition approved · Feb 2026 Bhandara–Gadchiroli Expressway
Approved May 2026 · reported Navegaon More–Konsari–Surjagad road
Acquisition paused · 5 Jun 2026 Chamorshi airport and industrial land
Operating and expanding · reported Aug 2025 Iron-ore mining and steel expansion
Land acquisition approved · Feb 2026

Bhandara–Gadchiroli Expressway

Swarajya reported on 19 February 2026 that the state granted administrative approval of Rs 931.15 crore for land acquisition for a 94.241 km access-controlled expressway, in two stretches: Savarkheda interchange on the Nagpur–Gondia corridor to Koknagad on NH 53 (24.705 km) and Borgaon interchange to Armori on NH 353D (69.536 km) (Swarajya, February 2026). MSRDC was authorised to start land acquisition at once; tendering follows cabinet clearance. The report names no villages or hectares. Rs 534.46 crore of the sum is principal compensation and Rs 396.69 crore anticipated interest (Swarajya, February 2026).

Source: Swarajya, February 2026; Swarajya, May 2026

Length

94.241 km

Land acquisition

Rs 931.15 crore

Stretches

24.705 km + 69.536 km

Status

Acquisition, not tendered

Land markets in the blast radius

  • Gadchiroli
  • Armori
  • Kurkheda
Approved May 2026 · reported

Navegaon More–Konsari–Surjagad road

Swarajya, citing the Times of India, reported on 15 May 2026 that the state cleared an 86 km greenfield road, placing the Navegaon More–Surjagad stretch in Gadchiroli and the Konsari end in Chandrapur, with a direction to connect it to the Samruddhi Expressway for mineral freight (Swarajya, May 2026). It rests on one outlet and gives no alignment.

Source: Swarajya, May 2026

Length

~86 km

Purpose

Mineral freight link

Executing agency

MSRDC

Status

Approved, reported

Land markets in the blast radius

  • Gadchiroli
  • Etapalli
Acquisition paused · 5 Jun 2026

Chamorshi airport and industrial land

The Hitavada reported on 13 May 2026 that the state chose Chamorshi taluka for an airport, needing about 311.81 ha (245.75 ha private, 34.38 ha forest, 31.38 ha government) at a sanctioned Rs 104 crore (The Hitavada, May 2026). On 7 June 2026 Swarajya reported that after a farmers’ march of about 6,000 people on 5 June the state paused the airport acquisition until the Chief Minister decides, and extended the objection period for about 3,000 hectares of industrial land in Chamorshi by 90 days (Swarajya, June 2026).

Source: The Hitavada, May 2026; Swarajya, June 2026

Airport land

~311.81 ha

Sanctioned

Rs 104 crore

Industrial land

~3,000 ha pursued

Status

Paused

Land markets in the blast radius

  • Chamorshi
  • Gadchiroli
Operating and expanding · reported Aug 2025

Iron-ore mining and steel expansion

The Week reported in August 2025 that an iron-ore mine in the district, described as India’s largest, was being expanded to 26 million tonnes a year of dispatchable capacity, with an integrated steel plant of 4.5 million tonnes a year expected within 30 months and about 14,000 jobs created so far (The Week, August 2025). It is a magazine report, not an official statement, and the same article gives forest cover as about 70%.

Source: The Week, August 2025

Mine capacity

26 MTPA (planned)

Steel plant

4.5 MTPA (planned)

Jobs reported

~14,000

Report date

Aug 2025

Land markets in the blast radius

  • Etapalli
  • Gadchiroli
  • Chamorshi

Agriculture & terrain

Soil, crops & water in Gadchiroli

A paddy-first district on mostly deep black soils, irrigated from wells, tanks and canals, with very large forest cover and tribal land.

🌾 Soil and crops

The ICAR-CRIDA plan (undated; crop data 2008-09) puts deep black soils on 72.3% of the area, medium-deep on 20.2% and shallow on 7.4%, with net sown area of 148 thousand hectares, cropping intensity 133.1% and paddy (149.6 thousand hectares in kharif) the main crop, followed by pigeon pea, soybean and rabi sorghum (ICAR-CRIDA Gadchiroli plan). The district portal also names bamboo and tendu leaves among forest produce (Gadchiroli district portal, about the district).

  • Paddy
  • Pigeon pea
  • Soybean
  • Bamboo

💧 Irrigation

The plan gives net irrigated area of 56.3 thousand hectares from canals, tanks, open wells and a few bore wells, but the table is garbled and its percentages overlap (ICAR-CRIDA Gadchiroli plan), so read it as a mix of sources and not a precise split. Rainfed area is 135.9 thousand hectares, so water access varies a lot by village.

  • Tanks
  • Open wells
  • Canals

🌊 Rivers and forest

The Godavari, Pranhita, Wainganga, Indravati and several smaller rivers drain the district (Gadchiroli district portal profile; Gadchiroli district portal, about the district). Forest figures range from about 70% to 90% of the area by source, as the legal notes explain. Forest and river-bank parcels need a written status from the Forest Department.

  • Godavari
  • Pranhita
  • Wainganga
  • Forest

💧 Rainfall & groundwater

Average rainfall is 1,430.8 mm on the district portal (1,467.4 mm in 2023) and a normal of 1,428.5 mm in the plan (Gadchiroli district portal profile; ICAR-CRIDA Gadchiroli plan). The CGWB 2024 report lists Gadchiroli among districts with sporadic fluoride and nitrate readings (CGWB Maharashtra report, 2024); we found no district stage-of-extraction figure. Test the water of any parcel before buying.

📐 Measurement units

Records use acres, gunthas and hectares: 1 acre = 40 gunthas and 1 hectare = 2.47 acres (The Week, July 2025). Local terms vary by tehsil, so convert every quote before comparing offers. Price a parcel on legal status and access, not on crop income.

At a glance

Gadchiroli vs. nearby districts

District / beltEstimated land price* (per acre)Basis
Gadchiroli — town, Chamorshi and Armori₹6–25 lakh*Indicative estimate; wide band
Gadchiroli — Kurkheda, Desaiganj, Dhanora, Aheri₹2–10 lakh*Indicative estimate; wide band
Gadchiroli — Sironcha, Bhamragad, Etapalli, Korchi, Mulchera₹1–5 lakh*Indicative estimate; wide band
ChandrapurNot estimated hereSee the Chandrapur page
GondiaNot estimated hereSee the Gondia page
NagpurNot estimated hereSee the Nagpur page

*Indicative only, not a valuation or an offer; prices vary by plot, road access and title. Check the guideline or ready-reckoner rate with the Sub-Registrar. See the Chandrapur page, the Gondia page, the Bhandara page and the Nagpur page for nearby districts.

Fenced farm plot with boundary stones and paddy fields near Gadchiroli, Maharashtra

District report — Gadchiroli

Farmland India view

Why investors look at Gadchiroli

Five reasoned points, with an honest note that this is a legally complex district where price evidence is thin and several projects are paused or at approval stage.

An expressway with acquisition funding

The 94.241 km Bhandara–Gadchiroli corridor has Rs 931.15 crore approved for land acquisition, but tendering waits for cabinet clearance (Swarajya, February 2026). Price on today’s roads.

A mining and steel economy

The Week reported mine expansion and steel plans with about 14,000 jobs so far (The Week, August 2025). Demand may follow near the road and industrial land, but leases and acquisition also take land out of the market.

An airport that is paused

The Chamorshi airport acquisition was paused on 5 June 2026 after a farmers’ march (Swarajya, June 2026). Do not price a parcel on an airport that may move or stall.

Low entry prices, high legal friction

Our indicative bands* are among the lowest in the state, but tribal-land rules, forest status and acquisition notices can make a cheap parcel unsaleable.

A paperwork-led market

Farmer-status, tribal-holder, forest-rights and acquisition status are all parcel-specific. The return case rests on clean title and permitted use, not on crop yield.

Browse reviewed land in Maharashtra

Confirm land-use, tribal-land and ready-reckoner status directly; these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Gadchiroli

Read these before shortlisting in Gadchiroli specifically.

Tribal and forest land

Where the seller is a Scheduled Tribe member, section 63-1A and the 1974 Act apply (Indian Kanoon text of section 63-1A), and forest cover is between about 70% and 90% by source (Gadchiroli district portal profile; The Week, August 2025). Get written status.

Acquisition and protest

About 6,000 farmers marched on 5 June 2026 and the airport acquisition was paused (Swarajya, June 2026). Status can change within weeks.

Mining and leases

Mine expansion and about 3,000 hectares of industrial land in Chamorshi are in play (The Week, August 2025; Swarajya, June 2026). Ask whether a parcel is inside a lease or notification.

Stamp duty and rates

The Act text gives 5% plus 1% and 4%, with the schedule unconfirmed (Maharashtra Stamp Act text to May 2019). The state held Ready Reckoner rates for 2026-27 (The Hitavada, April 2026); no Gadchiroli table was found.

Announced is not delivered

The expressway has acquisition funding but no tender in the report we read, and the airport is paused (Swarajya, February 2026; Swarajya, June 2026). Price on today’s fundamentals.

Access, security and data gaps

Remote tehsils can lack recorded road access, and we found no sourced current security assessment, so check conditions locally. Area, forest share and tehsil sub-division figures vary by source, and the bands on this page are indicative estimates*, not deal prices.

Who to contact

Local revenue, planning & forest offices

Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil under the District Collector, Gadchiroli; the district portal lists 12 tehsils in six sub-divisions (Gadchiroli district portal, about the district). Sale-deed registration is handled by the local Sub-Registrar, tribal-holder and Scheduled Area questions go to the Collector’s office and the tribal development office, and forest status goes to the Forest Department’s divisional office. We opened the district portal profile pages (Gadchiroli district portal profile) but not the Mahabhumi portal, the IGR rate pages or any Scheduled Area notification, so check them directly.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Gadchiroli.

Visit full wiki

01 of 04

What does farm land cost in Gadchiroli?

Our estimate is about ₹1 lakh to ₹25 lakh per acre*, depending on the belt: roughly ₹6–25 lakh around Gadchiroli town, Chamorshi and Armori, ₹2–10 lakh in Kurkheda, Desaiganj, Dhanora and Aheri, and ₹1–5 lakh in the remote tehsils, where few parcels can be sold. These are wide, rounded, indicative estimates, not a valuation or an offer. Check the Ready Reckoner rate with the Sub-Registrar.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: the district portal gives area, population and tehsils, while crop, soil and irrigation data come from an undated ICAR-CRIDA plan with 2008-09 crop figures and a garbled irrigation table. Infrastructure and acquisition statuses were read in October 2026 and change quickly; Ready Reckoner items are reports, not notified schedules; estimated land prices are indicative and are not taken from any registered deed. Pages marked “not opened” are named only as places to check. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Gadchiroli farmland?

Browse reviewed projects and individual land parcels across Gadchiroli — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.