Buying Land in Aurangabad

A Sone canal-irrigated paddy district on NH-139, with a 36 km bypass DPR, a Daudnagar bypass near tender and a stalled Bihta rail line.

  • 3,300 sq km

    Area (ICAR-CRIDA)

  • 1,035 mm

    Normal annual rainfall

  • 89%

    Canal share of irrigation

  • 152%

    Cropping intensity

District land record — Aurangabad

Rev. 2026 · Farmland India desk

State

Bihar

Sub-divisions

Two sub-divisions, Aurangabad and Daudnagar, and eleven blocks: Aurangabad, Barun, Daudnagar, Deo, Goh, Haspura, Kutumba, Madanpur, Nabinagar, Obra and Rafiganj, per the district contingency plan (ICAR-CRIDA).

Key markets

Aurangabad town · Daudnagar · Obra · Nabinagar

Demand anchors

A 36 km greenfield bypass for Aurangabad, Amba and Rishiyap has a DPR ready (Prabhat Khabar, 1 May 2026). An 8 km Daudnagar bypass near tender covers 29.08 ha (Prabhat Khabar, 2 Oct 2026). NH-139 four-laning was reported cleared in October 2026 (Prabhat Khabar).

Rail

Anugrah Narayan Road station; the 118 km Bihta–Aurangabad line is only partly built.

Size and population

About 3,300 sq km of land, of which about 168,000 ha is net sown, across eleven blocks.

Pricing unit

Asking prices are usually quoted in kattha or decimal; no sourced price series is shown

Local units

Kattha and bigha vary in size across Bihar and are not fixed by a single official conversion; 1 decimal is one-hundredth of an acre (435.6 sq ft). Always convert to acres or sq ft on the deed.

Land records portal

biharbhumi.bihar.gov.in for Jamabandi, mutation and maps

District overview

Aurangabad — a capital district with a new metro, a second airport and a Tal farm belt

Aurangabad district covers about 3,300 sq km of the Sone valley in south-western Bihar, on the Jharkhand border, in eleven blocks and two sub-divisions (ICAR-CRIDA contingency plan). It is a paddy and wheat district: about 168,000 ha is net sown, rice covers about 105,000 ha and wheat about 52,000 ha, and canals water nearly nine-tenths of the irrigated land. The soil is overwhelmingly clay, which holds paddy water well.

Much of the recent news is about bypasses and a railway. Prabhat Khabar reports that a 36 km greenfield bypass joining Aurangabad, Amba and Rishiyap to the Varanasi–Kolkata expressway has a DPR ready (Prabhat Khabar, 1 May 2026), and that the 8 km Daudnagar bypass on NH-139 will cost about Rs 288 crore on 29.08 ha (Prabhat Khabar, 2 Oct 2026). NH-139 itself has been cleared for four-laning from Naubatpur to Hariharganj (Prabhat Khabar, 18 Oct 2026). The 118 km Bihta–Aurangabad rail line is held up on its first 13 km by a 2 km land dispute (Prabhat Khabar, 24 Oct 2026). The cabinet also approved a heliport in Aurangabad on 12 October 2026 (Prabhat Khabar).

For farmland buyers, Aurangabad splits into three working belts. The Aurangabad–Amba–Rishiyap stretch on NH-139 is where bypass and expressway land matters most. Daudnagar and the northern blocks sit on the Patna side, with a bypass at tender and the rail line crossing the Son nearby. Obra, Nabinagar, Deo, Rafiganj and the other blocks are canal-fed farm country, where soil and canal access drive land use more than roads do. Land with a clear title away from the proposed alignments is the simplest to buy.

  • Sone canal plain
  • Aurangabad town
  • Daudnagar
  • Obra and Nabinagar
  • Paddy and wheat belt
  • Jharkhand border
Locator map of Aurangabad district in Bihar

Transaction costs

Stamp duty & registration in Aurangabad

7%

General stamp duty from 19 June 2026, up from 6%

as reported by Prabhat Khabar; confirm at the sub-registrar office

2%

Registration fee on a conveyance deed

as stated in the 2017-18 state audit; confirm the current fee

19 June 2026

Revised MVR in force statewide

urban and peripheral areas doubled, rural raised 60%

Aurangabad follows the state rates. Prabhat Khabar reported that from 19 June 2026 the MVR was doubled in urban and peripheral areas and raised 60% in rural areas, with the general stamp duty at 7% (6% before) and a 0.5 percentage point concession for women buyers (Prabhat Khabar, June 2026). The CAG audit for 2017-18 gives a 2% registration fee (CAG report No. 2 of 2019). The MVR then rises 5% every financial year and is reviewed every three years. Converting farmland to non-farm use outside the urban area adds a fee of 10% of market value (Conversion Act 2010). Our stamp duty guide and MVR guide explain how to look up the rate on Nibandhan.

Know the belt

What is moving prices in Aurangabad

Reported bypass, highway and rail developments; no listing-site prices are used.

Aurangabad town and the Amba–Rishiyap corridor

Bypass DPR ready, May 2026

Aurangabad town is the district headquarters, with Amba and Rishiyap on the same stretch of NH-139. The proposed 36 km greenfield bypass starts at Khairi Mod in Aurangabad Sadar block and joins the Varanasi–Kolkata expressway (Prabhat Khabar). NH-139 widening is also planned from Arka Colony to Dhanibar and Pola, with a separate Obra bypass. Land near these alignments carries the most acquisition uncertainty.

Check: the final bypass alignment, whether the plot is inside the municipal area, and any acquisition notice at the circle office.

Daudnagar: the Patna-side market

Bypass near tender, Oct 2026

Daudnagar is the second sub-divisional town, on NH-139 towards Patna and Arwal. An 8 km bypass costing about Rs 288 crore needs 29.08 ha from the mauzas of Amauna, Sipaha, Nima, Ankorha, Tarari, Pilchi, Tarar and Mahawar (Prabhat Khabar, 2 Oct 2026). The proposed Bihta–Aurangabad railway would also improve links (Prabhat Khabar).

Check: whether the plot is in one of the eight listed mauzas and the Jamabandi area against the field.

Obra, Amba and Nabinagar: the Amba–Nabinagar road side

Bypass and underpass planned, May 2026

The 36 km DPR also provides for a separate Obra bazaar bypass and an underpass on the Amba–Nabinagar road (Prabhat Khabar, 1 May 2026). Farm plots here lie in the canal command, so check irrigation access as well as road frontage.

Check: the alignment of both bypasses, canal distributary access, and mutation history.

Deo, Rafiganj, Madanpur and Goh: canal-fed farm blocks

Rice and wheat country

These blocks sit in the Sone canal command. ICAR-CRIDA records clay on 81.5% of the district and canals on 89% of irrigated land (ICAR-CRIDA), so plots with a reliable canal outlet are the safest paddy land. Delayed canal water is the main hazard.

Check: the canal distributary serving the plot, the water release record, and mutation history.

Asking prices

We found no newspaper or official price series for Aurangabad farmland, so no price band is shown. Use the MVR and registered deeds.

Connectivity

How Aurangabad connects — road, rail and air

NH-139, planned bypasses and a rail line held up by land. Drive times are not given because no source was found.

🚗 By road

NH-139 (Naubatpur–Arwal–Aurangabad–Hariharganj)Runs from Patna through Daudnagar and Aurangabad to the Jharkhand border; about 88 km of four-laning was reported cleared in October 2026 (Prabhat Khabar).
Aurangabad–Amba–Rishiyap bypass36 km greenfield bypass, DPR ready, joining the Varanasi–Kolkata expressway (Prabhat Khabar, 1 May 2026).
Daudnagar bypass8 km, about Rs 288 crore, tender at the final stage in October 2026 (Prabhat Khabar).
Varanasi–Kolkata expresswayA Bharatmala expressway that the new bypass would pass under, per Prabhat Khabar (Prabhat Khabar).

✈️ By air

Aurangabad heliportCabinet approved heliports in nine districts, including Aurangabad, on 12 October 2026 (Prabhat Khabar).
Gaya and PatnaThe nearest airports with scheduled services are at Gaya and Patna.

🚆 By rail

Anugrah Narayan RoadStation on the Grand Chord, and the planned first-phase start of the Bihta–Aurangabad line.
Aurangabad (proposed)Planned terminus of the 118 km Bihta line, held up by land (Prabhat Khabar).

No drive times are given because we found no source for them. The first 13 km of the rail line cannot open until about 2 km of land near Jokahri and Jagdishpur is acquired.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in November 2026. Government-announced timelines are not guaranteed; items with a single or older source say so.

00Open

04Catalysts

DPR ready May 2026Aurangabad–Amba–Rishiyap greenfield bypass
Tender final stage Oct 2026Daudnagar bypass (NH-139)
Approved Oct 2026NH-139 four-lane (Naubatpur–Hariharganj)
Under construction stalled on landBihta–Aurangabad rail line
DPR ready May 2026

Aurangabad–Amba–Rishiyap greenfield bypass

A 36 km four-lane greenfield bypass on NH-139 starting at Khairi Mod in Aurangabad Sadar block and joining the Varanasi–Kolkata expressway. Prabhat Khabar reports that the DPR is ready and that approval will start the next steps; an Obra bypass and an Amba–Nabinagar underpass are also planned.

Source: Prabhat Khabar, 1 May 2026

Length

About 36 km

Stage

DPR ready

Starts at

Khairi Mod

Joins

Varanasi–Kolkata expressway

Land markets in the blast radius

  • Aurangabad
  • Amba
  • Obra
Tender final stage Oct 2026

Daudnagar bypass (NH-139)

An 8 km bypass at Daudnagar on NH-139 at about Rs 288 crore, needing 29.08 ha of land from the mauzas of Amauna, Sipaha, Nima, Ankorha, Tarari, Pilchi, Tarar and Mahawar.

Source: Prabhat Khabar, 2 Oct 2026

Length

About 8 km

Cost

About Rs 288 crore

Land

29.08 ha

Stage

Tender, final stage

Land markets in the blast radius

  • Daudnagar
  • Haspura
Approved Oct 2026

NH-139 four-lane (Naubatpur–Hariharganj)

About 88 km of NH-139 from Naubatpur through Arwal and Aurangabad to Hariharganj on the Jharkhand border was reported cleared for four-laning at about Rs 2,500 crore, with bypasses at five places.

Source: Prabhat Khabar, 18 Oct 2026

Length

About 88 km

Cost

About Rs 2,500 crore

Bypasses

Five places

Corridor

Naubatpur to Hariharganj

Land markets in the blast radius

  • Daudnagar
  • Aurangabad
  • Amba
Under construction stalled on land

Bihta–Aurangabad rail line

A 118 km new line linking Patna, Arwal, Daudnagar and Aurangabad. The first 13 km from Anugrah Narayan Road to Aurangabad cannot start because about 2 km of land between Jokahri and Jagdishpur is unacquired; owners want four times the circle rate.

Source: Prabhat Khabar, 24 Oct 2026

Length

118 km

First phase

13 km

Land gap

About 2 km

Stage

Stalled on acquisition

Land markets in the blast radius

  • Daudnagar
  • Aurangabad

Agriculture & terrain

Soil, crops & water in Aurangabad

Crop areas, soils and irrigation from the ICAR-CRIDA district contingency plan.

Crops

Rice is the main kharif crop on about 105,300 ha, followed in rabi by wheat on 52,500 ha, with lentil, chickpea and khesari as pulses (ICAR-CRIDA). Net sown area is about 168,000 ha and cropping intensity is 152%, with about 88,000 ha sown more than once.

  • Rice, then wheat
  • Rice on about 105,300 ha
  • Wheat on about 52,500 ha
  • Khesari on about 14,500 ha
  • Lentil on about 12,700 ha

Soils

ICAR-CRIDA puts clayey soil on 81.5% of the district, fine sandy loam on 8%, sandy soil on 4.8% and coarse sandy loam on 3.9%.

  • Clayey soil on 81.5% of the area
  • Fine sandy loam on 8%
  • South Bihar Alluvial Plain zone (NARP BI-3)
  • Middle Gangetic Plain, hot subhumid

Horticulture

Mango is grown on about 1,225 ha, with guava, lemon and banana in smaller areas. Potato (5,700 ha), tomato, cauliflower, brinjal and onion are the main vegetables.

  • Mango on about 1,225 ha
  • Potato on about 5,700 ha

Water and irrigation

About 100,300 ha is irrigated, of which canals serve 89%, dug and shallow wells 7% and open wells 4% (ICAR-CRIDA). The contingency plan rates all eleven blocks as groundwater safe, and lists drought and delayed canal water release as the regular hazards.

Rainfall and flooding

Normal annual rainfall is 1,035 mm, of which 912 mm falls from June to September (ICAR-CRIDA).

At a glance

Patna vs. nearby districts

DistrictLand and waterWhat links it to Patna
Arwal (north)Smaller and similarly alluvial, with irrigation more from wells and tubewells than from canals; rainfall about 1,014 mm normal.NH-139 continues through Arwal, where land surveys cover 17 mauzas (Prabhat Khabar, 13 Oct 2026).

No price series is shown for any district because none is sourced. Aurangabad figures are from ICAR-CRIDA and Prabhat Khabar. Compare the MVR for each mauza before assuming land across a district line is cheaper.

Flooded paddy field with a field bund and an irrigation canal outlet on a farm plot in Aurangabad district

District report — Aurangabad

Farmland India view

Why investors look at Aurangabad

What the bypasses, the rail dispute and the new government rate mean for a buyer.

Bypasses that are still plans

The 36 km Aurangabad–Amba–Rishiyap bypass has a DPR but needs approval and acquisition (Prabhat Khabar). The Daudnagar bypass is nearer, at the final tender stage (Prabhat Khabar). Land near either line may gain access but may also be partly acquired.

A railway that depends on land

The Bihta–Aurangabad line is 118 km long, but its first phase between Anugrah Narayan Road and Aurangabad is stuck on 2 km of unacquired land (Prabhat Khabar). Buyers should treat any price premium for rail-side land as speculative until land is acquired.

A higher government floor

The June 2026 revision doubled urban and raised village government rates by about 60%, with stamp duty reported at 7% (Prabhat Khabar). Budget the duty on the higher of the deed value and the MVR.

Canal access decides farm value

Canals serve nearly nine-tenths of the irrigated land, so a plot without a canal outlet depends on dug wells and rain (ICAR-CRIDA). Ask for the distributary name and the recent water release record.

Farm returns come from paddy and wheat

About 105,300 ha is under rice and 52,500 ha under wheat, with pulses on a further 32,000 ha or so (ICAR-CRIDA). Cropping intensity is 152%, so most land grows one or two crops a year.

Confirm Jamabandi, mutation, zoning and acquisition status directly — these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Aurangabad

District-specific risks. Read the state page for the general Bihar risks on ceiling, conversion and records.

Acquisition and alignment uncertainty

Prabhat Khabar reports bypass land to be acquired at Daudnagar and a new 36 km bypass (Daudnagar, Aurangabad). Acquired land is paid at government-fixed compensation, and a notice can reduce the plot you thought you bought.

Rail land disputes

Owners near the Son have demanded four times the circle rate for rail land (Prabhat Khabar, 24 Oct 2026). Disputes like this can freeze a project for years and leave nearby land in limbo.

Drought and canal delay

ICAR-CRIDA lists drought and delayed canal water release as the regular hazards, with floods not occurring (ICAR-CRIDA). Rain-fed plots without a canal outlet carry the most risk.

Special survey in progress

Bihar’s special survey is targeted for December 2027 (Prabhat Khabar, 11 Mar 2026). Records may change as the survey reaches the mauza, so check the survey stage and any pending corrections.

Mismatched records

Old Khatiyan, digitised Jamabandi and the special survey's new records may not agree on area or owners. Compare all three with the physical plot and check the map before you pay (Bhu Naksha guide).

Joint family land

Unpartitioned land sold by one brother or heir can be challenged by the others. Ask for a partition deed or the written consent of every heir, and read the mutation history.

Colonies on farmland

Plotted colonies on agricultural land without conversion or an approved layout can leave buyers with plots they cannot legally build on or get a power connection for.

Under-valued deeds

Registering below the revised MVR invites a deficit-duty demand and penalties. Pay duty on the real value and keep payment records through banks.

Who to contact

Local revenue & planning offices

The Collectorate at Aurangabad, under the District Magistrate, runs the district. The sub-divisional officers at Aurangabad and Daudnagar and the Anchal (circle) offices in the eleven blocks handle mutation, conversion and survey claims, and registration is done at the sub-registry offices listed on the Nibandhan portal. Official pages: Bihar Bhumi and Parimarjan.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Aurangabad.

Visit full wiki

01 of 04

Is there a price guide for farmland in Aurangabad?

We found no newspaper or official price series for Aurangabad farmland, so none is shown. Check the Minimum Value Register for the mauza and land category and compare it with recent registered deeds in the same village before you negotiate.

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: sources were read in November 2026. Project status, the MVR and township rules change often; check the linked source and the relevant office before relying on any figure.

For developers

Ready to explore Aurangabad farmland?

Browse reviewed projects and individual land parcels across Aurangabad — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.