An NCR Haryana district where all five groundwater blocks are rated safe, the Rohtak–Hansi line and an elevated rail track already run, and no per-acre price series could be sourced.

  • 5 of 5

    Groundwater blocks safe (Mar 2024)

  • 51.14%

    District extraction (CGWB, via Tribune)

  • Opened Feb 2024

    Rohtak–Hansi rail line

  • Operating since Mar 2021

    Elevated rail track

District land record — Rohtak

Rev. 2026 · Farmland India desk

State

Haryana

Key farmland belts

Rohtak · Meham · Kalanaur · Sampla · Lakhan Majra

Pricing unit

₹/acre (farmland) · ₹/sq yd (plots)

Legal status

Open — CLU and controlled-area checks decide usability

Planning authorities

HSVP · DTCP Haryana

Demand anchors

HSIIDC industrial model town · rail upgrades · NCR Haryana sub-region

Land records portal

Jamabandi.nic.in

District overview

Rohtak — an NCR Haryana district with upgraded rail links and safe groundwater blocks

Rohtak sits in the NCR's Haryana sub-region. The district website says the district consists of the Rohtak and Meham tehsils (Rohtak district website), and the five blocks are Rohtak, Meham, Kalanaur, Sampla and Lakhan Majra. Area and population differ by source: the CGWB district booklet gives 1,745 sq km, the MSME-DI industrial profile gives 1,668 sq km and 1,058,683 people at the 2011 Census. The same profile calls Rohtak city the "city of fastener" and describes an industrial model town set up by HSIIDC on Delhi Road; its unit counts date from about 2011.

The Delhi side of the NCR is the buyer geography. Two rail upgrades are already in use: the 68.5 km Rohtak–Meham–Hansi line carried its first passenger train on 16 February 2024 (The Tribune, February 2024), and the 4.8 km elevated track on the Rohtak–Gohana line became operational in March 2021 (The Tribune, March 2021). The first five packages of the Delhi–Amritsar–Katra Expressway were inaugurated on 17 July 2026 (Swarajya, July 2026); the reports we read describe it as improving connectivity to Rohtak but name no interchange in the district. Buyers usually compare Rohtak with Gurgaon and Sonipat, which lie on the same side of Delhi.

What the land is. The industrial profile says 83% of the district's area is under cultivation, with wheat, gram, sugarcane and bajra the main crops. The CGWB booklet reports about 840 sq km irrigated by canals and 16,995 tubewells and borewells. On groundwater the district is unusual in Haryana: all five blocks are in the safe category in the Haryana Water Resources Authority notice (31 Mar 2024), and The Tribune, January 2025 put district extraction at 51.14%, against a state figure of 135.96% in the CGWB 2024 assessment. Quality is the weaker point: the industrial profile notes brackish water and waterlogging, and the CGWB report lists electrical conductivity, fluoride, nitrate and arsenic as anomalous at scattered locations in Rohtak.

What it costs. We found no sourced per-acre price series for Rohtak, and listing-site asking prices could not be traced to registered deals, so none are shown. The dated reference points are draft collector rates reported by The Tribune on 29 March 2026: residential land at Pump House Chowk to Jhajjar Railway from Rs 13,900 to Rs 24,325 per sq yd, and commercial land at Bharat Colony on the Delhi Bypass from Rs 52,800 to Rs 92,400 per sq yd, both up 75% in the draft. These are city rates, not farmland, and no agricultural per-acre rate for Rohtak was found.

  • Rohtak
  • Meham
  • Kalanaur
  • Sampla
  • Lakhan Majra
  • Rohtak–Hansi rail
  • Delhi-Amritsar-Katra Expressway
  • Industrial model town
Locator map of Rohtak district in Haryana

Transaction costs

Stamp duty & registration in Rohtak

7%

Stamp duty — men

state statement, includes 2% development fee (Tribune, Aug 2025)

5%

Stamp duty — women

state statement, includes 2% development fee (Tribune, Aug 2025)

Confirm

Rural rate and registration fee

not found in any official page or news report we opened

A Haryana government statement reported by The Tribune on 28 August 2025 said sale-deed duty has stayed at 7% for men (including a 2% development fee) and 5% for women since 2008, and the same report announced a stamp-duty waiver for residential plots up to 50 sq yd in urban areas and 100 sq yd in rural areas under housing schemes. It gives no separate rural rate and no registration fee, so we show neither. Confirm the rate that applies to your deed, and the notified collector rate for the village, with the Sub-Registrar; the Haryana revenue portal (Haryana Revenue Department portal, not opened) is where collector rates are published.

Know the belt

What is moving prices in Rohtak

Reference points are draft collector rates reported by The Tribune in March 2026. They are city rates, not farmland prices, and may have changed after objections.

Rohtak city, residential

Rs 24,325 per sq yd (draft), up from Rs 13,900

Pump House Chowk to Jhajjar Railway, a 75% proposed rise reported by The Tribune on 29 March 2026. It is a city-residential benchmark, not a farmland rate.

Check: whether the rate was notified unchanged after the objection window closed on 30 March 2026.

Bharat Colony, Delhi Bypass

Rs 92,400 per sq yd (draft), up from Rs 52,800

Commercial land on the Delhi Bypass, also proposed at +75% in the same draft. It shows how the city's commercial frontage is rated, and it says nothing about farmland.

Check: the zoning of the parcel and the notified rate before comparing it with anything else.

Expressway interchange

No Rohtak interchange named in the reports we read

The Swarajya and Business Standard reports of 17 July 2026 describe the first five packages and say the project improves connectivity to Rohtak, but neither names an interchange in the district. We therefore do not treat any village as an interchange village.

Check: the interchange locations on the NHAI alignment map before paying any expressway premium.

Rail upgrades

Delivered, not proposed

The Rohtak–Hansi line (opened February 2024) shortens the Rohtak–Hisar rail distance from 109 km via Bhiwani to about 90 km, and the elevated track on the Rohtak–Gohana line has run since March 2021 (The Tribune). Both help the city and the Meham side; neither sets a farmland price.

Check: distance from the station or road you are relying on, since the benefit fades quickly away from the city.

Industry

Older counts, context only

The industrial profile counts 4,761 registered units and 1,435 industrial units (undated table; year-wise data run to 2010-11) and says HSIIDC established an industrial model town on Delhi Road. Treat the counts as history.

Check: current allotment status with HSIIDC before assuming nearby land will be absorbed.

Units: killa, kanal, marla

Haryana land is quoted in killa (1 acre), kanal (605 sq yd) and marla (30.25 sq yd). Jamabandi records use kanal-marla, so convert any quote before comparing it. See the land measurement units guide.

Connectivity

How Rohtak connects — road, air and rail

Road distances are not given where we opened no official or news source; journey times vary with traffic and road works. Delhi is the buyer base.

By road from Delhi and nearby

New DelhiDistance not sourced here; check a road map
National highwaysLane counts not sourced; check the NHAI map
Delhi–Amritsar–Katra ExpresswayPackages 1 to 5 inaugurated 17 Jul 2026; no Rohtak interchange named in reports
Jind–Gohana highway (NH-352A)40.6 km, opened 17 Jul 2026; Jind to Gohana in about 40 min
ChandigarhNot sourced; check a road map

By air

IGI Airport, DelhiMain hub; road time not sourced
Noida International (Jewar)Flights from 15 Jun 2026 (ETV Bharat); road time not sourced
Local airportNone sourced for Rohtak

By rail & metro

Rohtak JunctionRohtak–Gohana line has a 4.8 km elevated section, operating since Mar 2021
Rohtak–Meham–Hansi line68.5 km, first train 16 Feb 2024; Rohtak–Hansi about 90 km by rail
Kamakhya–Rohtak Amrit Bharat ExpressFlag-off scheduled 18 Jan 2026; timetable to confirm
Delhi MetroBahadurgarh to Asaudha: study decided Oct 2024
Rohtak or Sampla metroDemand only; no study or timeline reported

Delhi is the buyer geography here. The rail upgrades are in use and the expressway packages were inaugurated in July 2026; the metro is at study stage and the RRTS is not in the July 2026 report round, so price on what runs today. Rules that apply to a purchase are in the state-wise land laws guide.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked confirm have single or conflicting sources.

04Operational links

02Pipeline projects

Operational · inaugurated Jul 2026 Delhi–Amritsar–Katra Expressway (Haryana packages)
Operational · opened Feb 2024 Rohtak–Meham–Hansi rail line
Flag-off scheduled 18 Jan 2026 (confirm) Kamakhya–Rohtak Amrit Bharat Express
Study stage · Oct 2024 Delhi Metro: Bahadurgarh–Asaudha extension
Proposed · no DPR reported Delhi–Bahadurgarh–Rohtak RRTS
Operational · since Mar 2021 Rohtak city elevated rail track
Operational · inaugurated Jul 2026

Delhi–Amritsar–Katra Expressway (Haryana packages)

PM Modi inaugurated Packages 1 to 5, a 157.92 km four-lane, access-controlled stretch costing about ₹9,680 crore, at Jind on 17 July 2026. Neither report names an interchange in Rohtak district, and Business Standard says only that the projects improve connectivity to Rohtak, Panipat and Delhi-NCR; confirm any interchange on the NHAI map. Swarajya reports the full 667 km corridor is scheduled for March 2027.

Source: Swarajya, 17 Jul 2026; Business Standard, 17 Jul 2026

Length

157.92 km (Packages 1 to 5)

Corridor

Delhi–Katra, 667 km in all

Cost

~₹9,680 crore

Status

Operational

Land markets in the blast radius

  • Not mapped; check the NHAI map
Operational · opened Feb 2024

Rohtak–Meham–Hansi rail line

The first passenger train ran on 16 February 2024. The 68.5 km line (68 km in one passage of the report) has stations at Dobh Bahali, Mokhra Madina, Meham, Mundhal Kalan and Garhi, and cuts the Rohtak–Hansi rail distance from 109 km via Bhiwani to about 90 km. The report says land acquisition delayed the project and that Haryana met half the ₹889.28 crore cost.

Source: The Tribune, 16 Feb 2024

Length

68.5 km

Corridor

Rohtak–Meham–Hansi

Cost

₹889.28 crore

Status

Operational

Land markets in the blast radius

  • Meham
  • Mokhra Madina
Flag-off scheduled 18 Jan 2026 (confirm)

Kamakhya–Rohtak Amrit Bharat Express

An AIR News bulletin of 18 January 2026 lists the Kamakhya–Rohtak Amrit Bharat Express among two new trains to be flagged off that day from Kaliabor in Assam. We opened no timetable, so frequency, distance and running days are unconfirmed; check Indian Railways before relying on it. It is a long-distance link, not a Delhi commuter service.

Source: AIR News, 18 Jan 2026

Distance

Not sourced

Frequency

Confirm timetable

Terminus

Rohtak

Status

Operational

Land markets in the blast radius

  • Rohtak city
Study stage · Oct 2024

Delhi Metro: Bahadurgarh–Asaudha extension

The Tribune reported on 30 October 2024 that the state had decided to study extending the metro from Bahadurgarh to Asaudha, with a final passenger survey to precede a detailed project report. Extension up to Sampla in Rohtak district was a stated demand in the 2024 elections, but the article reports no study, approval or timeline for it. Treat Rohtak metro access as a proposal.

Source: The Tribune, 30 Oct 2024

Segment

Bahadurgarh → Asaudha

Length

Not sourced

Rohtak leg

Demand only (Sampla)

Status

Study stage

Land markets in the blast radius

  • Bahadurgarh
  • Asaudha
Proposed · no DPR reported

Delhi–Bahadurgarh–Rohtak RRTS

The Swarajya report of 28 July 2026 lists Delhi–Bahadurgarh–Rohtak among the eight corridors identified in the NCR-2032 transport plan. The four corridors with detailed project reports at that date were Delhi–Karnal, Delhi–Bawal, Bawal–Behror and Ghaziabad–Noida International Airport, not Rohtak. No approval or start date was found.

Source: Swarajya, 28 Jul 2026

Corridor

Delhi–Bahadurgarh–Rohtak

Plan reference

NCR-2032 transport plan

DPR

Not among the 4 DPRs

Status

Proposed

Land markets in the blast radius

  • Sampla
  • Rohtak city
Operational · since Mar 2021

Rohtak city elevated rail track

The Tribune reported on 16 March 2021 that the 4.8 km elevated railway track at Rohtak, costing ₹315.71 crore, had become operational after a high-speed trial run by the Commissioner of Railway Safety. Its foundation stone was laid in March 2018, and it was meant to finish by September 2019 but was delayed by legal issues and the Covid lockdown. Trains on the Rohtak–Gohana line now run above the road crossings.

Source: The Tribune, 16 Mar 2021

Length

4.8 km

Track cost

₹315.71 crore

Foundation

Mar 2018

Status

Operational

Land markets in the blast radius

  • Rohtak city

Agriculture & terrain

Soil, water & crops in Rohtak

Canal-and-tubewell wheat country with a safe groundwater category, brackish and waterlogged pockets, and soil data that is more than a decade old.

🌾 Sandy-loam plains (most of the district)

The industrial profile says 83% of the district is under cultivation (2010-11 land use), with wheat, gram, sugarcane and bajra the main crops. The CGWB booklet gives net sown area of 1,430 sq km on arid brown (solonised) and sierozem soils, and normal rainfall of 592 mm over 23 rainy days. Both are older data, so use them for the crop pattern, not current counts.

  • Wheat
  • Gram
  • Sugarcane
  • Bajra

🚰 Canal-fed belts

The CGWB booklet lists about 840 sq km irrigated by canals, 16,995 tubewells and borewells, and 377 tanks and ponds. Canal outlet rights are worth asking about when comparing two parcels, because they decide how much a borewell has to carry.

  • Canals
  • Tubewells

🧂 Brackish and waterlogged pockets

The industrial profile says the district faces brackish water and waterlogging in many parts. In the CGWB booklet electrical conductivity ranged from 565 to 12,300 µS/cm, with about 60% of samples below 3,000. Test borewell water and inspect the plot after the monsoon.

  • Salinity
  • Drainage

🌾 Mandi reference

Wholesale prices for Rohtak-district markets are published daily on Agmarknet (not opened), and the Soil Health Card portal (not opened) has village soil data. Farm income is small next to city land rates, so price a parcel on location and permitted use, not yield.

  • Wheat
  • Gram

💧 Water & rainfall

The Haryana Water Resources Authority notice (categorisation as on 31 March 2024; the notice shows no issue date) lists all five blocks, Rohtak, Meham, Kalanaur, Sampla and Lakhan Majra, as safe, and The Tribune, January 2025 put district extraction at 51.14%. The older CGWB booklet (2009 assessment) had Rohtak and Lakhan Majra semi-critical, with Lakhan Majra at 111%, so check the block for any parcel. Statewide, the CGWB 2024 assessment found 88 of 143 units over-exploited and an extraction stage of 135.96%.

📐 Measurement units

Haryana land units: 1 killa = 1 acre; 1 kanal = 605 sq yd; 1 marla = 30.25 sq yd. Convert every quote to acres or sq yd before comparing two listings, and ask for the khasra area in the jamabandi.

At a glance

Rohtak vs. its neighbours

District / beltDraft collector rate*Source
Rohtak — residential, Pump House Chowk to Jhajjar RailwayRs 13,900 to Rs 24,325 per sq yd (+75%)Draft, The Tribune, 29 Mar 2026
Rohtak — commercial, Bharat Colony (Delhi Bypass)Rs 52,800 to Rs 92,400 per sq yd (+75%)Draft, The Tribune, 29 Mar 2026
Sonipat — agricultural, KishoraRs 1.43 crore to Rs 2.5 crore per acre (+75%)Draft, The Tribune, 29 Mar 2026
Sonipat — commercial, Housing Board ColonyRs 55,000 to Rs 96,250 per sq yd (+75%)Draft, The Tribune, 29 Mar 2026

*Draft collector-rate proposals reported by The Tribune on 29 March 2026; the notified rates may differ after objections, and the rows are not like-for-like (residential, commercial and agricultural). The Tribune names only Rohtak and Sonepat among our neighbours here. See the Gurgaon page for the deepest farmhouse market on the same side of Delhi.

Farmhouse plot with boundary stones near Rohtak, Haryana

District report — Rohtak

Farmland India view

Why investors look at Rohtak

Five reasoned points, with an honest note that price evidence is thin and the metro and RRTS are proposals.

Rail that already works

Rail already runs, and has improved. The Rohtak–Hansi line opened in February 2024 and the elevated track has been operating since March 2021. These help the city and the Meham side more than distant villages.

Safe groundwater category

All five blocks are in the safe category in the 31 March 2024 categorisation, and district extraction is 51.14% against a state figure of 135.96%. Brackish water still needs testing, but water is less likely to cap what you can do than in the most over-exploited districts.

An expressway without a named interchange

The first five packages of the Delhi–Amritsar–Katra Expressway were inaugurated in July 2026 and the reports describe better connectivity to Rohtak. No Rohtak interchange is named, so the benefit to any one village is unproven.

Pipeline is upside, not the case

The Bahadurgarh–Asaudha metro extension was at study stage in October 2024, and the Delhi–Bahadurgarh–Rohtak RRTS is not among the four corridors with project reports in July 2026. If either arrives it is a bonus; it should not be in the price you pay today.

Thin evidence rewards diligence

No sourced per-acre series exists, and the dated reference points are city collector rates. The buyer who gathers registered deeds and village collector rates has a real edge in negotiation.

Browse reviewed land in Rohtak

Confirm CLU and controlled-area status, water quality and the collector rate directly; these are not certified by Farmland India's review.

STRAIGHT TALK

Risks & challenges in Rohtak

Read these before shortlisting in Rohtak specifically.

No sourced price series

We found no sourced per-acre price for Rohtak farmland, and listing asks are excluded. Gather registered deeds and village collector rates before negotiating.

Brackish water and waterlogging

The industrial profile reports both, and CGWB flags conductivity, fluoride, nitrate and arsenic at scattered locations. Test borewell water, ask about drainage, and inspect in the monsoon.

CLU, controlled areas and licences

Non-farm use needs CLU, and under section 7 of the 1975 Act plots in an unlicensed colony cannot be lawfully sold or advertised. Ask which one is on offer.

Collector rates in transition

Draft 2026-27 rates were posted on 28 March 2026 and The Tribune reported proposed rises of up to 75%. Confirm the final rate for the village.

Metro and RRTS are proposals

The Asaudha extension was at study stage in October 2024, the Rohtak leg is a demand with no timeline, and the RRTS is not in the July 2026 report round. Price on today's roads and rail.

Interchange claims

Reports of the July 2026 inauguration name no Rohtak interchange. Treat any "expressway-facing" claim for a parcel as unconfirmed until it is placed on the NHAI map.

Conflicting district statistics

Area is 1,745 or 1,668 sq km across the CGWB and MSME-DI documents, and their district data are about a decade old. Use the figures as orders of magnitude.

Who to contact

Local revenue & registration offices

Mutation, jamabandi extracts and record corrections are handled at the tehsil (the district website names Rohtak and Meham tehsils), with the Deputy Commissioner's office as the district authority; the Rohtak district website carries contacts and the draft collector-rate notice. Sale-deed registration is at the local Sub-Registrar, and records are read on Jamabandi.nic.in (not opened). CLU and controlled-area queries go to the Directorate of Town & Country Planning; collector rates are published on the Haryana revenue portal (not opened). Confirm the exact office for your village with the Deputy Commissioner's office.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Rohtak.

Visit full wiki

01 of 04

Can I buy agricultural land in Rohtak?

We found no domicile bar for Indian buyers in the texts we opened, but we did not read Haryana's revenue statutes in full, so confirm with a Haryana revenue lawyer. The Ceiling on Land Holdings Act, 1972 caps a holding at 7.25 hectares of two-crop assured-irrigation land, 10.9 hectares for one crop and 21.8 hectares for other land (section 4). NRIs and OCIs cannot buy agricultural land, a farm house or plantation property under RBI's 2018 regulations.

Ready to look at what is available?

Browse reviewed listings

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: the CGWB booklet and MSME-DI profile are about a decade old; the HWRA categorisation is as on 31 March 2024 and its notice shows no issue date; collector rates are drafts; infrastructure statuses were read on 12 October 2026 and change quickly. Government homepages marked "not opened" were not read. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Rohtak farmland?

Browse reviewed projects and individual land parcels across Rohtak — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.