Farmland India
Aerial view of agricultural land and farm fields near Dahod, Gujarat

District guide

Buying Land in Dahod

A tribal border district in eastern Gujarat: section 73AA sanction, locomotive unit and NH-56 four-laning, 2011 groundwater data and no sourced price series.

  • 3,642 sq km

    Area (district portal)

  • About 21.2 lakh

    Population (district portal)

  • 9

    Talukas

  • 49.87%

    Groundwater development (2011)

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

District land record — Dahod

Rev. 2026 · Farmland India desk

State

Gujarat

Sub-divisions

9 talukas: Dahod, Limkheda, Devgadbaria, Jhalod, Fatepura, Dhanpur, Sanjeli, Singhvad and Garbada (Dahod district portal, October 2026)

Key markets

Dahod city · Devgadh Baria · Jhalod · Limkheda · Garbada · Fatepura

Demand anchors

Railway locomotive manufacturing unit inaugurated May 2025 · NH-56 four-laning in progress · Narmada-fed regional water scheme reported

Rail

Dahod station, with a railway workshop set up in 1926 (narendramodi.in event report)

Size and population

3,642 sq km · about 21.2 lakh people (Dahod district portal, October 2026; the page does not state the Census year)

Pricing unit

₹/vigha or ₹/acre (farmland) · ₹/sq yd or ₹/sq m (plots)

Local units

Guntha ≈ 1,089 sq ft · 40 gunthas = 1 acre · vigha varies by region

Land records portal

AnyROR (Gujarat Revenue Department); the portal refused automated access, so check records there

District overview

Dahod — a tribal border district with a railway locomotive unit and a four-laning highway

Dahod is an eastern Gujarat district of 3,642 sq km with about 21.2 lakh people on the district portal (Dahod district portal, October 2026). It borders Mahisagar and Rajasthan's Banswara to the north and Madhya Pradesh's Jhabua to the south-east, and was created in 1997 out of Panchmahal (same portal). The portal lists nine talukas: Dahod, Limkheda, Devgadbaria, Jhalod, Fatepura, Dhanpur, Sanjeli, Singhvad and Garbada (tehsil page). That is two more than the seven in the CGWB profile, which dates its taluka list to 2011 (CGWB Dahod profile); PTI reported two new talukas for Dahod when the cabinet approved 17 across the state in September 2025 (PTI via The Week, September 2025).

We publish no per-acre price band for Dahod. No registered-deal series or jantri schedule for the district could be opened, so the market notes below describe what is reported to be changing around the land, not what it sells for. Jantri rates were reported doubled from 15 April 2023 (DeshGujarat, February 2023), but that is a state-wide statement, not a Dahod figure.

The land is farm and forest first. The Mahi is the main river, and CGWB records average rainfall of 745 mm for 1982 to 2011 with most irrigation from dug wells (CGWB Dahod profile). Industry arrived in 2025, when a 9,000 hp electric locomotive unit was inaugurated at Dahod (Indian Infrastructure, May 2025), and NH-56 is being widened to four lanes through the tribal belt (NBM&CW, March 2026).

  • Dahod
  • Devgadh Baria
  • Jhalod
  • Limkheda
  • NH-56
  • Mahi basin
Locator map of Dahod district in Gujarat

Transaction costs

Stamp duty & registration in Dahod

4.9%

Stamp duty on conveyance

CAG audit, year ended 31 Mar 2018; current rate to confirm

Not sourced

Registration fee

no rate for land conveyances found; ask the Sub-Registrar

2x

Jantri revision (reported)

reported doubled from 15 Apr 2023; no Dahod schedule opened

The Comptroller and Auditor General's audit for the year ended 31 March 2018 states stamp duty on a conveyance deed at 4.9 per cent of the greater of consideration and market value, and gives no registration-fee rate for conveyances (CAG, Report 3 of 2019). Jantri rates were reported doubled from 15 April 2023 (DeshGujarat, February 2023) and a revised draft was reported pending in November 2024 (The Secretariat, November 2024). Registration runs through gARVI 2.0 in 294 Sub-Registrar offices, according to an Inspector General of Registration summary (IGR summary). We found no Dahod jantri schedule and the registration portal did not open for us, so ask the Sub-Registrar for the duty, fee and jantri on the survey number. A sale by a tribal holder also needs the Collector's sanction under section 73AA (see the legal note).

Know the belt

What is moving prices in Dahod

Reported developments rather than price data: no jantri schedule or registered-deal series for Dahod was available.

Locomotive manufacturing unit

Inaugurated 26 May 2025

Indian Infrastructure reports a unit built for about Rs 21,400 crore that makes 9,000 hp electric locomotives, with capacity for 120 a year and room to scale to 150 (Indian Infrastructure, May 2025). ETV Bharat put the investment at Rs 20,000 crore under a public-private partnership and expected about 10,000 direct and indirect jobs (ETV Bharat, May 2025); the two figures differ. The Dahod workshop itself dates from 1926 (event report).

Check: whether any supplier or housing demand has materialised in the survey number's own village; we found no data.

NH-56 four-laning

Work started Nov 2025 on part of the corridor

NHAI is upgrading the 175 km Jambugam (Bodeli) to Malotha section of NH-56 in four packages; two are awarded with work started in November 2025 and a two-year target, and the other two stretches, 107.67 km at Rs 4,583.64 crore, were approved in February 2026 (NBM&CW, February 2026). Six and seven bids were received by March 2026 and no award was reported (NBM&CW, March 2026).

Check: which taluka the awarded packages cross; the reports do not say.

Water supply and city works

Reported at a 2022 event

The Prime Minister's office report lists a Rs 840 crore Narmada-based regional water scheme serving about 280 villages in Dahod district and Devgadh Baria, and five Dahod Smart City projects worth about Rs 335 crore (event report). The page gives no date and we did not check current delivery.

Check: which villages are on the scheme and whether supply is running.

Asking prices

No sourced price series

No registered-deal series, jantri schedule or compensation figure for Dahod was available to us. Any per-acre or per-vigha quote you receive is unreviewed.

Check: registered sale deeds in the same village before negotiating.

Units: guntha, acre, vigha

A guntha is about 101 sq m or 1,089 sq ft, and 40 gunthas make an acre; the 2026 fragmentation amendment sets the rural standard area at 10 gunthas, or 1,012 sq m (DeshGujarat, September 2026). The vigha is a regional unit that varies, and we found no official conversion, so ask for the area of the survey number in gunthas or hectares and convert it yourself.

Connectivity

How Dahod connects — road, rail and air

Distances are not given because no official or news source for Dahod was found. Journey times vary with traffic and road works.

By road

NH-56 (Bodeli to Malotha)175 km being upgraded to four lanes; two stretches awarded Nov 2025, two stretches (107.67 km) approved Feb 2026
Corridor linksReported to link to NH-53, NH-48 and the Delhi-Mumbai Expressway
Delhi-Mumbai ExpresswayVadodara-Navsari packages open on trial (Jan 2026); not a Dahod road

By air

Airport in the districtNone found in the sources read
Nearest airportNot sourced; check before planning travel

By rail

Dahod stationRailway workshop set up in 1926
Locomotive unitInaugurated 26 May 2025
Vadodara-Ratlam third and fourth lines259 km, foundation stone 8 Sep 2026; stations not listed

The practical question is the last leg from the highway to the survey number; ask for the access road in the revenue record. NH-56 and rail details come from NBM&CW, February 2026, NBM&CW, March 2026, Indian Infrastructure, September 2026 and DeshGujarat, January 2026. Full state rules: Gujarat agricultural land rules.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked confirm have a single or an older source.

03Open or inaugurated

03In progress or pending

Inaugurated · 26 May 2025 Dahod locomotive manufacturing unit
Inaugurated · event report, 2022 Southern Area regional water supply (Narmada)
Part inaugurated · date to confirm Dahod Smart City works
Under construction · two-year target from Nov 2025 NH-56 Bodeli to Movi / Nasarpore four-laning
Approved Feb 2026 · bids received, no award reported NH-56 Dhamasiya-Movi and Nasarpore-Malotha
Foundation stone · 8 Sep 2026 Vadodara-Ratlam third and fourth rail lines
Inaugurated · 26 May 2025

Dahod locomotive manufacturing unit

Indian Infrastructure reports that the Union Government inaugurated the unit on 26 May 2025, built with an investment of about Rs 21,400 crore, producing 9,000 hp electric locomotives that haul 4,600 tonnes, with capacity for 120 a year and potential for 150 (Indian Infrastructure, May 2025). ETV Bharat, before the opening, gave Rs 20,000 crore under a public-private partnership, 1,200 engines over 10 years and about 10,000 direct and indirect jobs (ETV Bharat, May 2025). The figures differ, so confirm the investment with Indian Railways.

Source: Indian Infrastructure, 27 May 2025; ETV Bharat, 21 May 2025

Output

120 a year (up to 150)

Locomotive

9,000 hp electric

Investment

Rs 20,000-21,400 crore (reports differ)

Status

Inaugurated

Land markets in the blast radius

  • Dahod
Inaugurated · event report, 2022

Southern Area regional water supply (Narmada)

The Prime Minister's office report lists a Rs 840 crore Southern Area Regional Water Supply Scheme, drawing on the Narmada basin, serving about 280 villages in Dahod district and Devgadh Baria city (Prime Minister event report, Dahod (narendramodi.in; the page gives no date, its content points to 2022)). The page carries no date, and we did not check whether supply is running.

Source: narendramodi.in event report (undated; content points to 2022)

Cost

~Rs 840 crore

Villages

~280 plus Devgadh Baria

Source

Narmada basin

Status

Inaugurated; delivery to confirm

Land markets in the blast radius

  • Dahod
  • Devgadh Baria
Part inaugurated · date to confirm

Dahod Smart City works

The same report lists five Dahod Smart City projects worth about Rs 335 crore inaugurated, among them a command and control centre, storm-water drainage, sewerage, solid waste management and rainwater harvesting, with further works worth about Rs 175 crore at foundation-stone stage (Prime Minister event report, Dahod (narendramodi.in; the page gives no date, its content points to 2022)). We did not find a later status report, so confirm what has been completed.

Source: narendramodi.in event report (undated)

Inaugurated

~Rs 335 crore

Foundation stones

~Rs 175 crore

Area

Dahod city

Status

Later works to confirm

Land markets in the blast radius

  • Dahod
Under construction · two-year target from Nov 2025

NH-56 Bodeli to Movi / Nasarpore four-laning

NHAI is upgrading the congested Jambugam (Bodeli) to Malotha section of NH-56, 175 km, to four lanes in four packages. The Jambugam (Bodeli) to Dhamasiya and Movi to Nasarpore stretches are awarded, with work started in November 2025 and a two-year target (NBM&CW, February 2026). The report names Dahod and Chhota Udepur as tribal areas the project connects but does not say which stretch crosses which district.

Source: NBM&CW, 16 Feb 2026

Section

Bodeli to Malotha, 175 km

Mode

Four lanes

Started

Nov 2025

Target

About Nov 2027

Land markets in the blast radius

  • Dahod
  • Chhota Udaipur
Approved Feb 2026 · bids received, no award reported

NH-56 Dhamasiya-Movi and Nasarpore-Malotha

The Union Cabinet approved two four-lane stretches of NH-56, Dhamasiya to Bitada/Movi (47.46 km) and Nasarpore to Malotha (60.21 km), at a total capital cost of Rs 4,583.64 crore under the hybrid annuity model (NBM&CW, February 2026). By 12 March 2026 NHAI had six bids for the first and seven for the second, with award expected in the financial year (NBM&CW, March 2026). We found no award report.

Source: NBM&CW, 16 Feb and 12 Mar 2026

Length

107.67 km

Cost

Rs 4,583.64 crore

Mode

Hybrid annuity

Status

Bids in; no award found

Land markets in the blast radius

  • Dahod
  • Chhota Udaipur
Foundation stone · 8 Sep 2026

Vadodara-Ratlam third and fourth rail lines

Indian Infrastructure reports that foundation stones were laid on 8 September 2026 for third and fourth lines on the 259 km Vadodara to Ratlam route, at Rs 88.85 billion (Indian Infrastructure, September 2026). The report lists no stations, so confirm with Indian Railways which Dahod-district stretches are included before pricing land near the track.

Source: Indian Infrastructure, 9 Sep 2026

Length

259 km

Cost

Rs 8,885 crore

Works

Third and fourth lines

Status

Foundation stone laid

Land markets in the blast radius

  • Dahod

Agriculture & terrain

Soil, crops & water in Dahod

A rain-fed Mahi-basin district with sandy and black soils where dug wells carry most irrigation; its groundwater profile is from 2011 and so dated.

🌾 Farmland and crops

The CGWB profile gives sandy, yellowish-brown and black cotton soils and lists maize, wheat, rice, gram, other pulses, groundnut and sesamum, though its crop table mixes units, so we give no acreage (CGWB Dahod profile). Maize is the first crop it names. Dahod has no sourced crop-value series.

  • Maize
  • Wheat
  • Pulses
  • Rice

🌊 Mahi basin

The Mahi is the main river and is perennial; its left-bank tributaries Panam, Hadap, Goma, Kharod, Anas, Kali, Khan, Machchhan and Chibota are ephemeral (CGWB Dahod profile). Ask the seller about drainage lines and seasonal flow on any survey number near a tributary.

  • Mahi
  • Panam
  • Kali

🌲 Forest edge

Ratanmahal Wildlife Sanctuary, declared in March 1982, lies on the Gujarat-Madhya Pradesh border in the district (Gujarat Tourism, Ratanmahal Sloth Bear Sanctuary). We found no buffer-zone notification; forest status is a parcel check, not a district fact.

  • Ratanmahal
  • Forest check

💧 Water & rainfall

CGWB records average annual rainfall of 745 mm for 1982 to 2011, mostly in the south-west monsoon. In 2006-07 dug wells irrigated 471 sq km of a net irrigated area of 545 sq km, with canals 63 sq km and tanks 48 sq km (the profile mixes units). The stage of groundwater development was 49.87 per cent as on 2011, with all seven talukas then classed safe, from 33.98 per cent at Garbada to 56.94 per cent at Fatehpura (CGWB Dahod profile). That is 15 years old, and the 2024 state assessment gives no district-wise stage (CGWB, Gujarat 2024), so ask a local borewell contractor about current depths. The Narmada main canal network is largely complete statewide (DeshGujarat, March 2025); we did not find which Dahod villages it serves.

📐 Measurement units

Guntha ≈ 1,089 sq ft; 40 gunthas = 1 acre; vigha varies by region with no official conversion found. Convert every quote to gunthas or acres before comparing two offers. Mandi prices are on Agmarknet (not opened for this page); crop income is modest next to land values, so price a parcel on its location, tenure and permitted use.

At a glance

Dahod vs. its neighbours

District / beltPrice band* (per acre)Evidence
DahodNo sourced price seriesNo figure used on this page
MahisagarNo sourced price seriesNo figure used on this page
PanchmahalNo sourced price seriesNo figure used on this page

*We found no registered-deal or jantri series for these districts, so no figures are compared. See the Mahisagar page and the Panchmahal page for the neighbouring belts, and the Chhota Udaipur page for the other tribal district on the NH-56 corridor.

Farmhouse plot with boundary stones near Dahod, Gujarat

District report — Dahod

Farmland India view

Why investors look at Dahod

Four reasoned points, with an honest note that the price evidence is missing and several catalysts are still pending.

A rail manufacturing town

The locomotive unit was inaugurated in May 2025 and the town has had a railway workshop since 1926. That is an employer, not a land price series; check whether demand has reached the village you are looking at.

A highway being widened

NH-56 is being taken to four lanes in stages, two awarded in November 2025 and two awaiting award as of March 2026. Price on today's road and treat the widening as a possible future change.

Tribal land rules narrow the field

Section 73AA gives the Collector a say in any sale by a tribal holder. That limits supply and adds a step, so a buyer who documents sanction early is better placed than one relying on a broker summary.

Thin price evidence

Neither a jantri schedule nor a registered-deal series was available for Dahod. The return case here is location, tenure and permitted use, not an observed price trend.

Confirm tribal-land sanction, NA and forest status directly; these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Dahod

Read these before shortlisting in Dahod specifically.

Tribal-land sanction

A sale by a Scheduled Tribe holder needs the Collector's previous sanction under section 73AA, and a case index reports that a transfer in breach is void. Ask for the sanction order and the holder's class in the record.

Forest and sanctuary edge

Ratanmahal Wildlife Sanctuary lies in the district. We found no buffer-zone notification, so ask the forest division about any survey number near forest land.

Disturbed Areas Act

Transfers in a notified area need the Collector's prior sanction. We obtained no list of notified areas, so ask whether the survey number is in one.

Farmer-status rule

Section 63 bars transfers to non-agriculturists, and farmer status is checked from records back to 6 April 1995. A non-farmer buyer should confirm eligibility before paying.

Dated groundwater data

The district profile is from 2011 and puts the stage of development at 49.87 per cent; recent borewell depths are unknown to us. Check them locally.

Announced is not delivered

Two NH-56 stretches had bids but no reported award by March 2026, and the Dahod water and smart-city works come from an undated 2022 report. Price on today's fundamentals.

No sourced price series

No jantri schedule or registered-deal series was available. Collect registered comparables before negotiating.

Who to contact

Local revenue, planning & forest offices

Mutation and revenue-record matters go through the Mamlatdar of the relevant taluka (Dahod, Limkheda, Devgadbaria, Jhalod, Fatepura, Dhanpur, Sanjeli, Singhvad, Garbada), as listed on the Dahod district portal. The District Collector sanctions tribal-land transfers under section 73AA and NA permission under section 65 of the Land Revenue Code, and the Prant (sub-division) office handles appeals. The Deputy Conservator of Forests, Bariya division, deals with forest status. Sale-deed registration is handled by the local Sub-Registrar, and records and jantri are on the Gujarat Revenue Department and IGR portals, which did not open for us, so check them directly.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Dahod.

Visit full wiki

01 of 04

What does agricultural land cost in Dahod?

We publish no per-acre or per-vigha band for Dahod, because we could not open a jantri schedule or a registered-deal series for the district. Jantri rates were reported doubled across Gujarat from 15 April 2023 (DeshGujarat, February 2023), which is not a Dahod figure. Ask the Sub-Registrar for registered sales in the same village.

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: area and population are district-portal figures with no stated Census year; the groundwater profile dates to 2011; infrastructure statuses were read in October 2026 and change quickly; the water-supply and smart-city items come from an undated report. The Gujarat Revenue Department, AnyROR, gARVI and IGR portals and the Land Revenue Code text did not open for us. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Dahod farmland?

Browse reviewed projects and individual land parcels across Dahod — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.