Farmland India
Aerial view of agricultural land and farm fields near Morbi, Gujarat

District guide

Buying Land in Morbi

A ceramic-cluster district in Saurashtra: section 63 farmer status, NA premiums, brackish groundwater, a state ceramics park and no sourced price series.

  • 4,872 sq km

    Area

  • 9.60 lakh

    Population (Census 2011)

  • 5

    Talukas

  • ~1,200

    Cluster units (press, Mar 2026)

*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.

District land record — Morbi

Rev. 2026 · Farmland India desk

State

Gujarat

Sub-divisions

5 talukas: Morbi, Maliya, Tankara, Wankaner and Halvad; Wankaner came from Rajkot district and Halvad from Surendranagar (Morbi district portal, October 2026)

Key markets

Morbi city · Wankaner · Halvad · Maliya · Tankara

Demand anchors

Ceramic and tile manufacturing cluster · Machhu river town · state ceramic-park land at Paneli · SAUNI Link-1 starts at Machhu-2 dam

Rail

Not sourced for this page; ask Indian Railways which stations and services serve the parcel

Size and population

4,872 sq km · 9,60,329 people at Census 2011 (Morbi district portal, October 2026)

Pricing unit

Asking prices are usually quoted per vigha or per acre; no sourced price series is shown

Local units

Guntha ≈ 1,089 sq ft (about 101 sq m) · 40 gunthas = 1 acre · vigha varies by region, no official conversion found

Land records portal

AnyROR Gujarat (did not open for us; check records there)

District overview

Morbi — an industrial district built around a ceramic cluster

Morbi was created on 15 August 2013 and has five talukas: Morbi, Maliya, Tankara, Wankaner (formerly in Rajkot district) and Halvad (formerly in Surendranagar) (Morbi district portal, October 2026). The district portal gives 4,872 sq km and 9,60,329 people at Census 2011 (same portal). Morbi city sits on the Machhu river about 60 km from Rajkot and about 35 km from the sea, with Kutch to the north, Surendranagar to the east, Rajkot to the south and Jamnagar to the west (district map page).

The economy is industrial. ThePrint reported in March 2026 that Morbi has about 1,200 manufacturing units producing 60 lakh tonnes a year, with exports of about Rs 15,000 crore in 2024-25, and that a propane shortage had closed more than 200 factories (ThePrint, March 2026). Its December 2023 report counted over 800 tile factories within a 60 km radius (ThePrint, December 2023); the two counts do not agree, so read both as press figures. None of these reports gives a land price.

We publish no per-vigha or per-acre band for Morbi. No registered-deal series or district jantri schedule was found, and the page uses no listing-site asking prices. Where land is farmed, the old Rajkot district booklet puts groundwater development at 63.43% in Morvi taluka and 62.37% in Wankaner as on March 2011, both "safe" (CGWB Rajkot booklet, compiled November 2013); that predates the district's creation and Halvad, Maliya and Tankara are not in it. Water from the Narmada system reaches Saurashtra through SAUNI, whose Link-1 pipeline starts at Machhu-2 dam in Morbi district (Ministry of Jal Shakti SAUNI report).

  • Morbi
  • Wankaner
  • Halvad
  • Maliya
  • Tankara
  • Machhu river
Locator map of Morbi district in Gujarat

Transaction costs

Stamp duty & registration in Morbi

4.9%

Stamp duty on conveyance (audit year 2017-18)

rate recorded by the CAG for the year ended 31 Mar 2018; current schedule not opened

Not sourced

Registration fee on land deeds

no government schedule found; ask the Sub-Registrar

Doubled

Jantri from 15 Apr 2023

reported by DeshGujarat, Feb 2023; no district schedule obtained

Duty is charged on the higher of the deed value and the jantri (guideline) value, as the state's registration system is generally described; we did not open a schedule to confirm that rule for Morbi. The Comptroller and Auditor General's audit of the year ended 31 March 2018 records stamp duty of 4.9% on conveyance (CAG Report 3 of 2019, chapter 4); a later change is not ruled out. We found no government page giving the registration fee on a land deed or a concession for women buyers, so we state neither. The state doubled its jantri rates from 15 April 2023 after about twelve years (DeshGujarat, February 2023), and a revised draft for agricultural land was reported pending in November 2024 (The Secretariat, November 2024). Registration runs through the gARVI 2.0 system in 294 Sub-Registrar offices (Inspector General of Registration summary); the gARVI portal itself did not open for us, so check it directly. Neither the 4.9% figure nor the jantri doubling has been matched to a Morbi village.

Know the belt

What is moving land in Morbi

Press figures on the ceramic cluster and one acquisition report; no price series and no district jantri schedule was found.

Morbi cluster: scale as reported

About 1,200 units (ThePrint, Mar 2026)

ThePrint's March 2026 report, citing Gujarat Industries and Mines Department data, gives about 1,200 manufacturing units, 60 lakh tonnes a year and nearly 9 lakh livelihoods (ThePrint, March 2026). Its December 2023 report said over 800 tile factories lie within 60 km of Morbi and put the first plant at 1985 (ThePrint, December 2023). The unit counts differ and neither article quotes a land price.

Check: whether a plot is zoned and permitted for the use you intend, not the cluster's headline size.

Fuel shock, March 2026

Reported: 200+ factories shut

The March 2026 report says factories rely mainly on propane that reaches Kandla port and is trucked about 130 km to Morbi, and that over 200 had shut while others ran short of gas (ThePrint, March 2026). A DeshGujarat headline of 31 December 2025 records a state cut in natural gas prices for Morbi and Thangadh ceramic units; we saw the headline on a tag page and did not open the article (DeshGujarat Morbi tag page).

Check: current gas supply and any factory closures near the parcel before assuming industrial demand.

Ceramics park land at Paneli

425 ha acquired (ThePrint, Dec 2023)

ThePrint reported the state had acquired 425 hectares at Paneli village, about 45 km from Morbi city, for a park expected to hold about 1,600 units, and noted that officials gave conflicting opening timelines (ThePrint, December 2023). We found no later status report.

Check: the survey number against the park boundary, and ask the Collector for the park's current status.

Asking prices and jantri

No sourced price series

No registered-deal series or district jantri schedule was found. The state doubled jantri rates from 15 April 2023 (DeshGujarat, February 2023) and a revised draft was reported pending in November 2024 (The Secretariat, November 2024); neither is a Morbi figure.

Check: registered sale deeds in the same village, and the jantri for the survey number at the Sub-Registrar.

Units: guntha, acre, vigha

Gujarat land is measured in gunthas (about 1,089 sq ft, or 101 sq m), with 40 gunthas to the acre; the new fragmentation standard of 10 gunthas is 1,012 sq m. The vigha varies by region and we found no official conversion, so ask for every quote in acres or gunthas and check the area in the village record. We did not open a revenue manual for these definitions.

Connectivity

How Morbi connects — road, rail and air

Only distances and facts found in the portal and press are given. Highway numbers, rail services and airport distances were not sourced for Morbi and are left out.

By road

Morbi to RajkotAbout 60 km (district portal)
Morbi to the seaAbout 35 km (district portal)
Kandla port to MorbiAbout 130 km by truck (ThePrint, Mar 2026)
National highwaysNot sourced for this page

By air

Rajkot new airportInterim terminal in use; canopy collapse reported Jun 2024 (ThePrint tag, headline only)
Distance from MorbiNot sourced
Morbi airstrip or airportNone found

By rail & metro

Stations in districtNot sourced for this page
Zone and divisionNot confirmed; ask Indian Railways
MetroNone found

The practical question is the last leg from the main road to the parcel; ask for the access path in the village record. Rules for buyers from outside Gujarat: Gujarat agricultural land rules.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government timelines are not guaranteed; every item here has a single or an older source and is marked confirm.

00Open or inaugurated

03In progress or pending

Land acquired · timeline unclear (Dec 2023) Ceramics park at Paneli
Listed in SAUNI report · Link-1 status not stated SAUNI Link-1 from Machhu-2 dam
Tender underway · headline only (Feb 2026) Agriculture college at Morbi
Land acquired · timeline unclear (Dec 2023)

Ceramics park at Paneli

The state acquired 425 hectares at Paneli village, about 45 km from Morbi city, for a ceramics park meant to host about 1,600 units, according to ThePrint's December 2023 report (ThePrint, December 2023). That report gave conflicting opening dates and mentioned a target of around June of the following year. We found no later report, so treat the park as pending and confirm status with the Collector or the state industrial body.

Source: ThePrint, 19 Dec 2023

Land

425 ha

Units expected

About 1,600

Distance

~45 km from Morbi city

Status

Confirm

Land markets in the blast radius

  • Morbi district
Listed in SAUNI report · Link-1 status not stated

SAUNI Link-1 from Machhu-2 dam

The Ministry of Jal Shakti report on SAUNI describes Link-1 as a 208 km pipeline from Machhu-2 dam in Morbi district to Sani dam in Devbhumi Dwarka district. SAUNI covers 115 reservoirs in 11 districts over 1,371 km, with phase III ongoing (Ministry of Jal Shakti SAUNI report). The extract we read does not say whether Link-1 is complete or how many Morbi villages it irrigates, so confirm with the Narmada water authority before pricing land on irrigation.

Source: Ministry of Jal Shakti SAUNI report (undated)

Pipeline

208 km

Starts at

Machhu-2 dam

Scheme

115 reservoirs, 11 districts

Status

Confirm

Land markets in the blast radius

  • Morbi district
Tender underway · headline only (Feb 2026)

Agriculture college at Morbi

A DeshGujarat headline dated 20 February 2026 says Morbi will get an agriculture college with the tender process under way. We saw the headline on the site's Morbi tag page and did not open the article, so the location, cost and timeline are unknown (DeshGujarat Morbi tag page).

Source: DeshGujarat, 20 Feb 2026 (headline only)

Type

Institution

Stage

Tender

Cost

Not seen

Status

Confirm

Land markets in the blast radius

  • Morbi district

Agriculture & terrain

Soil, crops & water in Morbi

A dry-farming cotton and oilseed region on clay soils, where groundwater is brackish in places and canal and pipeline water arrives by SAUNI.

🌾 Clay plains (Morbi and Wankaner)

The CGWB Rajkot booklet groups Wankaner and Morvi in a central zone of clayey loam to clay soil, moderately deep to deep. For the whole old Rajkot district in 2006-07 it gives cotton on 2,530 sq km, oilseeds on 4,370 sq km and wheat on 840 sq km, from a net sown area of 7,657 sq km; these are pre-2013 district-wide figures, not Morbi's (CGWB Rajkot booklet). Village-level soil data: Soil Health Card portal (not opened for this page).

  • Cotton
  • Oilseeds
  • Wheat
  • Bajra

🧂 Water quality at depth

The booklet says groundwater in Wankaner is brackish to saline at depth, advises sealing saline zones during tubewell construction, and describes the Malia and Morvi alluvium as a poor aquifer limited by quality. Dug wells are typically 15 to 30 m deep and tubewells 100 to 200 m (CGWB Rajkot booklet, November 2013). The 2024 state assessment lists Morbi among districts in its EC, fluoride and nitrate anomaly lists (CGWB Gujarat 2024, as read through an automated summary).

  • Brackish water
  • Fluoride
  • Nitrate

💧 SAUNI and the Machhu

Machhu-2 dam is the starting point of SAUNI Link-1, a 208 km pipeline to Sani dam (Ministry of Jal Shakti SAUNI report). The state reports 63,908 km of a 69,830 km Narmada canal network built as of January 2025 (DeshGujarat, March 2025), but that article does not name Morbi. Ask whether the survey number lies in a command area.

  • SAUNI
  • Machhu
  • Link-1

💧 Water & rainfall

The Rajkot booklet gives a district average rainfall of 592 mm (year not stated) and 709.8 mm at the Rajkot station for 1951 to 1980, which do not agree, so we give both. Stage of groundwater development as on March 2011 was 63.43% in Morvi taluka and 62.37% in Wankaner, both "safe" (CGWB Rajkot booklet). Statewide, CGWB puts 2024 extraction at 54.21% with 22 of 252 units over-exploited (CGWB, Gujarat 2024); a September 2026 press report names Mehsana, Banaskantha, Patan, Gandhinagar, Ahmedabad and Kutch as stressed, not Morbi (Gujarat Samachar, September 2026). No Morbi-specific 2024 stage was found.

📐 Measurement units

Guntha ≈ 1,089 sq ft; 40 gunthas = 1 acre; the vigha varies by region. Convert every quote to acres or gunthas before comparing offers. Live mandi prices are on Agmarknet (not opened for this page). Cotton and oilseed income is modest next to an industrial-zone plot, so price a parcel on location and permitted use.

At a glance

Morbi vs. its neighbours

District / beltPrice band* (per acre)Evidence
Morbi (this district)No sourced price seriesNo district jantri or registered-deal series found
RajkotNo sourced price seriesBorders Morbi to the south; Wankaner taluka was transferred from it (district portal)
KutchNo sourced price seriesBorders Morbi to the north (district portal)
SurendranagarNo sourced price seriesBorders Morbi to the east; Halvad taluka was transferred from it (district portal)
JamnagarNo sourced price seriesBorders Morbi to the west (district portal)

*No price band is shown for any district because none could be sourced. Compare registered deeds and the jantri, not asking prices. For another Gujarat belt on this site see the Narmada page, which is a tribal and tourism district rather than an industrial one.

Farmhouse plot with boundary stones near Morbi, Gujarat

District report — Morbi

Farmland India view

Why investors look at Morbi

Five reasoned points, with an honest note that the price evidence is missing and the catalysts are unconfirmed.

A district with an industrial anchor

Reports describe about 1,200 units, 60 lakh tonnes a year and exports near Rs 15,000 crore in 2024-25. That is demand for sheds, labour housing and logistics land, but the press reports give no land prices, so the effect on farmland is unproven.

Fuel supply can break the story

In March 2026 more than 200 factories were reported shut over a propane shortage. A cluster this dependent on one fuel is a risk as well as a draw; check what the seller's neighbours are doing.

Water links are listed, not proven

SAUNI Link-1 starts at Machhu-2 dam, and the state describes a Narmada canal network that is largely built. Neither source says which Morbi villages receive water, so ask for the command-area status of the parcel.

Land for the ceramics park is already taken

The state acquired 425 hectares at Paneli. Land beside that boundary may be sold on its promise, and the park's timeline was reported as unclear. This desk reads it as optionality.

A market that rewards paperwork

Farmer status, NA permission, the fragmentation limit and the Disturbed Areas check are all parcel-specific. A buyer who documents each one is better placed than one relying on a broker summary.

Confirm farmer status, NA permission and Disturbed Areas status directly; these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Morbi

Read these before shortlisting in Morbi specifically.

Farmer-status bar (section 63)

A non-agriculturist cannot buy farmland, and the state's reform proposal had not been enacted by October 2026 on our searches. Ask a lawyer to read the seller's title and the buyer's eligibility together.

NA premium and zoning

NA permission carries a reported premium of about 35% to 40% of land value and a deemed-grant clock of three months. Obtain the order, not a promise.

Single-industry dependence

The cluster relies on propane and natural gas, and more than 200 factories were reported shut in March 2026. A slump can hit demand for adjacent land.

Brackish groundwater

The CGWB booklet reports brackish to saline groundwater at depth in Wankaner and a poor aquifer in the Malia and Morvi alluvium. Check borewell yield and quality before assuming irrigation.

Disturbed Areas check

Transfers inside a notified area need the Collector's sanction. We obtained no list and nothing specific to Morbi, so the check is the buyer's to make.

Announced is not delivered

The Paneli ceramics park had conflicting opening dates in 2023 and we found no status report. SAUNI Link-1 status is unstated. Price on today's roads and water.

No sourced price series

We use no listing-site prices for Morbi and no district jantri schedule was found. Collect registered comparables before negotiating.

Who to contact

Local revenue, planning & forest offices

Mutation and revenue-record matters go through the Mamlatdar of the relevant taluka (Morbi, Maliya, Tankara, Wankaner, Halvad); the Morbi district portal lists the talukas and the Collector's office at Morbi. Farmer-status clearance, NA permission and the tenure permissions under sections 43 and 63 go to the Collector, with the Prant (sub-division) office handling cases that the Collector delegates; we did not find a Morbi-specific list of Prant offices. Sale-deed registration is handled by the local Sub-Registrar through gARVI (gARVI portal, which did not open for us), and records are on AnyROR (also not opened). Town planning for any urban development authority area falls under the Gujarat Town Planning and Urban Development Act, 1976 (India Code, not opened). Check each portal directly; we give no phone numbers or officials' names.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Morbi.

Visit full wiki

01 of 04

What does farmland cost in Morbi?

We publish no per-vigha or per-acre band for Morbi. No registered-deal series or district jantri schedule was found, and listing-site asking prices could not be traced to registered sales. The state doubled its jantri from 15 April 2023 (DeshGujarat, February 2023), but that is a state-wide fact, not a Morbi rate.

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: area and population are district-portal figures for Census 2011; groundwater and crop data come from a booklet compiled in November 2013 for the old Rajkot district and a 2024 state assessment; the cluster figures are press reports of 2023 and 2026; infrastructure statuses were read in October 2026 and change quickly. Pages marked "not opened" or "did not open" are named only as places to check. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Morbi farmland?

Browse reviewed projects and individual land parcels across Morbi — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.