A city district on the Delhi-Mumbai corridor: farmer-status and zoning checks, an open expressway, a ring road and three rail projects in progress, over-exploited groundwater near the city and no sourced price series.

  • 922.7 mm

    Rainfall, Baroda IMD station

  • 103.10%

    Vadodara taluka groundwater (2002)

  • Vadodara–Navsari open

    Delhi–Mumbai Expressway

  • 259 km, started Sep 2026

    Vadodara–Ratlam rail lines

District land record — Vadodara

Rev. 2026 · Farmland India desk

State

Gujarat

Sub-divisions

The CGWB booklet lists 12 talukas; five of them (Chhota Udaipur, Kawant, Naswadi, Sankheda, Jetpur Pavi) are now in Chhota Udepur district, which CGWB describes as having six talukas (CGWB booklet; CGWB, October 2022). Booklet names that remain in Vadodara district: Vadodara, Padra, Karjan, Savli, Dabhoi, Shinor and Vaghodiya. We could not open the current official list, and talukas may have been added since

Key markets

Vadodara city edge · Padra · Karjan · Savli · Dabhoi · Vaghodiya · Shinor

Demand anchors

Delhi–Mumbai Expressway open from Vadodara · Vadodara ring road in progress · Vadodara–Ratlam rail lines started Sep 2026 · high-speed rail station under construction

Rail

Vadodara junction on Western Railway, linked to Mumbai, Delhi and Ahmedabad (Vadodara district portal); the high-speed rail station is under construction (NHSRCL)

Size and population

No current figure obtained. The CGWB booklet gives 7,548.50 sq km and 36,41,802 people at the 2001 Census for the older 12-taluka district, which included areas now in Chhota Udepur (CGWB booklet)

Pricing unit

Asking prices are usually quoted per vigha or acre; no sourced price series is shown

Local units

Guntha = 1,089 sq ft · 40 gunthas = 1 acre · Vigha varies by region and no official conversion was found (DeshGujarat, September 2026 for 10 gunthas = 1,012 sq m)

Land records portal

anyror.gujarat.gov.in (fetch refused for this page; check records there)

District overview

Vadodara — a city district with an expressway, three rail projects and an older farm belt

Vadodara city lies on the Vishwamitri river, 139 km from Gandhinagar, on the Delhi-Mumbai rail line and national highway (Vadodara district portal). The same portal page puts it 112 km from Ahmedabad and 420 km from Mumbai, with buses to Ahmedabad every 15 minutes taking about two hours (Vadodara district portal); the page is undated. The district was larger in the CGWB booklet: 7,548.50 sq km and 12 talukas, several of which now form Chhota Udepur district (CGWB booklet). We found no current area or population for the present district.

We publish no per-acre or per-vigha price band for Vadodara. No registered-deal series or district jantri schedule could be opened, and Gujarat's jantri was reported doubled from 15 April 2023 with a revised draft still pending in November 2024 (DeshGujarat, February 2023; The Secretariat, November 2024). Collect registered comparables from the same village before negotiating.

The farm belt has black and alluvial soils between the Narmada on the north-west boundary and the Mahi on the south. Rainfall at the Baroda IMD station is 922.7 mm a year, and wells supply about 95% of irrigation. In the 2002 assessment Vadodara taluka was over-exploited at 103.10% groundwater development, with Karjan (85.37%) and Shinor (79.96%) semi-critical (CGWB booklet); the data are old.

  • Vadodara city edge
  • Padra
  • Karjan
  • Dabhoi
  • Delhi–Mumbai Expressway
  • Vadodara–Ratlam
Locator map of Vadodara district in Gujarat

Transaction costs

Stamp duty & registration in Vadodara

4.9%

Stamp duty on a conveyance deed

CAG audit for the year ended 31 Mar 2018; current rate to confirm

Not sourced

Registration fee on land deeds

no rate found; ask the Sub-Registrar

2x

Jantri doubled from 15 Apr 2023

reported statewide; no Vadodara schedule opened

The Comptroller and Auditor General's audit for the year ended 31 March 2018 states stamp duty on a conveyance deed at 4.9% of the greater of consideration and market value, and gives no registration-fee rate for conveyances (CAG, Report 3 of 2019). Jantri rates were reported doubled from 15 April 2023 after about twelve years (DeshGujarat, February 2023), and a revised draft was reported pending in November 2024 (The Secretariat, November 2024). Registration runs through gARVI 2.0 across 294 Sub-Registrar offices (Inspector General of Registration summary); we could not open the portal (gARVI), so we quote no women's concession and no Vadodara guideline value. Ask the Sub-Registrar for the duty, fee and jantri on your survey number.

Know the belt

What is moving prices in Vadodara

Reported corridor, rail and groundwater developments; no listing-site prices are used.

The expressway belt

Packages 1-3 open since Feb 2024; Vadodara–Navsari open Jan 2026

DeshGujarat reported that packages 1 to 3, running from Vadodara towards Bharuch, have been operational since February 2024 and that the whole Vadodara-Navsari stretch was open by 12 January 2026, light vehicles only and with toll collection not started (DeshGujarat, January 2026). In October 2025 package 30, Kalol Interchange to Pratapnagar (21.5 km), was 98% complete, with Pratapnagar described as in Vadodara district (DeshGujarat, October 2025). The reports do not list interchange villages.

Check: where the nearest interchange is, and whether the access road to the parcel is a public road in the revenue record.

Ring road and the city edge

Ring road: Rs 1,500 crore, progressing (Apr 2026)

DeshGujarat's March 2026 roundup says the Rs 1,500 crore Vadodara Ring Road project is progressing, and carries a headline about a Rs 225 crore bridge over the Narmada to improve Vadodara-Bharuch connectivity; we did not open that second article (DeshGujarat, April 2026). The alignment is not given.

Check: whether any survey number sits on the ring road alignment, and ask the Collectorate for the notified plan.

Karjan and Dabhoi: rail projects

Foundation stones laid 8 Sep 2026

Indian Infrastructure reported foundation stones on 8 September 2026 for the 37 km Miyagam Karjan-Choranda-Malsar gauge conversion (Rs 4.5 billion) and the 33 km Vishwamitri-Dabhoi doubling (Rs 3.94 billion), alongside the 259 km Vadodara-Ratlam third and fourth lines (Rs 88.85 billion) (Indian Infrastructure, September 2026). No completion dates were given.

Check: whether the village is on or near the line and whether any acquisition notice has been issued.

Asking prices

No sourced price series

Listing-site asking prices for Vadodara could not be traced to registered deals, so none are shown. Jantri is the only official reference and it is a registration floor, not what a seller will accept.

Check: registered sale deeds in the same village before negotiating.

Units: guntha and vigha

A guntha is about 101 sq m or 1,089 sq ft and 40 gunthas make an acre; the fragmentation amendment uses 10 gunthas as 1,012 sq m (DeshGujarat, September 2026). The vigha varies by region and we found no official conversion, so convert any quote to gunthas or acres and confirm the share of the survey number being sold with the talati.

Connectivity

How Vadodara connects — road, rail and air

Distances come from an undated district portal page and are road figures to Ahmedabad and Mumbai. Drive times to the villages are not given because no source was found.

By road

Ahmedabad, Mumbai112 km and 420 km from Vadodara; the page names the highway NH 8 (Vadodara district portal)
Delhi–Mumbai ExpresswayVadodara–Navsari open Jan 2026 (DeshGujarat)
Ahmedabad–Vadodara ExpresswayEight-lane widening proposed (DeshGujarat, January 2026)
Vadodara Ring RoadRs 1,500 crore; progressing (Apr 2026 report)

By air

Vadodara airportThe portal lists domestic flights to Ahmedabad, Delhi, Mumbai, Daman and Pune but does not name the airport (Vadodara district portal)
Passenger dataNone found in sources

By rail

Vadodara junctionWestern Railway, linked to Mumbai, Delhi and Ahmedabad
High-speed rail stationUnder construction; concourse and rail-level slabs 425 m each (NHSRCL)
Amrit Bharat listVadodara among 87 Gujarat stations identified (DeshGujarat)
KavachCommissioned on Vadodara–Nagda section (Apr 2026 report)

Highway and rail facts come from DeshGujarat, January 2026, DeshGujarat, April 2026 and Indian Infrastructure, September 2026. The practical question is the last leg from the highway to the parcel; ask for the access road in the revenue record. Statewide rules for buyers are in the Gujarat agricultural land rules.

Growth catalysts

Upcoming infrastructure & developments

Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items with a single or older source say so.

01Open or inaugurated

06In progress or pending

Open · Jan 2026 Delhi–Mumbai Expressway, Vadodara–Navsari section
In progress · Apr 2026 Vadodara Ring Road
Proposed · Jan 2026 Ahmedabad–Vadodara Expressway, eight-lane widening
Foundation stone · 8 Sep 2026 Vadodara–Ratlam third and fourth lines
Foundation stone · 8 Sep 2026 Miyagam Karjan–Choranda–Malsar gauge conversion
Foundation stone · 8 Sep 2026 Vishwamitri–Dabhoi rail doubling
Station in progress · undated Mumbai–Ahmedabad high-speed rail, Vadodara station
Open · Jan 2026

Delhi–Mumbai Expressway, Vadodara–Navsari section

Packages 1 to 7 of the Vadodara-Virar section are open, with package 7 on a trial basis; light vehicles only and no toll yet. About 426 km of the 1,386 km expressway lies in Gujarat (DeshGujarat, January 2026). Packages 1 to 3 (23.74 km, 32 km and 31 km) were fully operational in October 2025, and package 30 from Kalol Interchange to Pratapnagar (21.5 km) was 98% complete (DeshGujarat, October 2025).

Source: DeshGujarat, 12 Jan 2026; DeshGujarat, 30 Oct 2025

Gujarat length

About 426 km

Open

Vadodara–Navsari

Vehicles

Light only

Toll

Not started

Land markets in the blast radius

  • Pratapnagar (package 30)
  • Interchange villages not named
In progress · Apr 2026

Vadodara Ring Road

DeshGujarat's March 2026 roundup describes the Rs 1,500 crore Vadodara Ring Road as progressing (DeshGujarat, April 2026). The report gives no length, alignment or completion date.

Source: DeshGujarat, 4 Apr 2026

Cost

Rs 1,500 crore

Status

Progressing

Alignment

Not given

Completion

Not given

Land markets in the blast radius

  • Alignment not published in sources
Proposed · Jan 2026

Ahmedabad–Vadodara Expressway, eight-lane widening

DeshGujarat's January 2026 roundup says the state has proposed widening the existing expressway to eight lanes to handle rising traffic (DeshGujarat, January 2026). No date, cost or approval was reported.

Source: DeshGujarat, 31 Jan 2026

Lanes

Eight (proposed)

Cost

Not given

Approval

Not reported

Date

Not given

Land markets in the blast radius

  • Alignment villages not named
Foundation stone · 8 Sep 2026

Vadodara–Ratlam third and fourth lines

Indian Infrastructure reported a foundation stone on 8 September 2026 for the 259 km third and fourth lines at Rs 88.85 billion; no completion date was given (Indian Infrastructure, September 2026).

Source: Indian Infrastructure, 9 Sep 2026

Length

259 km

Cost

Rs 88.85 billion

Foundation stone

8 Sep 2026

Completion

Not given

Land markets in the blast radius

  • Stations not listed in source
Foundation stone · 8 Sep 2026

Miyagam Karjan–Choranda–Malsar gauge conversion

A 37 km narrow-gauge to broad-gauge conversion at Rs 4.5 billion, with the foundation stone laid on 8 September 2026 (Indian Infrastructure, September 2026). Miyagam Karjan Jn is also on the Amrit Bharat identified list (PIB).

Source: Indian Infrastructure, 9 Sep 2026; PIB

Length

37 km

Cost

Rs 4.5 billion

Foundation stone

8 Sep 2026

Completion

Not given

Land markets in the blast radius

  • Karjan (station named in project)
Foundation stone · 8 Sep 2026

Vishwamitri–Dabhoi rail doubling

A 33 km doubling at Rs 3.94 billion, foundation stone laid on 8 September 2026 (Indian Infrastructure, September 2026). Vishvamitri Jn and Dabhoi Jn are on the Amrit Bharat identified list and not on the completed list (PIB).

Source: Indian Infrastructure, 9 Sep 2026; PIB

Length

33 km

Cost

Rs 3.94 billion

Foundation stone

8 Sep 2026

Completion

Not given

Land markets in the blast radius

  • Dabhoi (station named in project)
Station in progress · undated

Mumbai–Ahmedabad high-speed rail, Vadodara station

NHSRCL lists Vadodara as in progress, with 425 m concourse and rail-level slabs and the first-floor slab being cast; the page is undated (NHSRCL). The Surat-Vapi stretch is targeted for August 2027 and the full date is not set (Business Today, August 2026).

Source: NHSRCL (undated); Business Today, 16 Aug 2026

Concourse slab

425 m

Status

In progress

First service

Surat–Vapi, Aug 2027 target

Vadodara date

Not set

Land markets in the blast radius

  • Vadodara city

Agriculture & terrain

Soil, crops & water in Vadodara

A black and alluvial soil belt between the Narmada and the Mahi, irrigated almost entirely from wells, with the city taluka already over-exploited in the older assessment.

🌾 Soils and crops

The CGWB booklet names alluvial, black and hilly soils, and lists paddy, wheat, jowar, bajra, maize, pulses, sugarcane, cotton, groundnut and castor as the main crops. Gross cropped area was 5,64,043 ha, of which 4,75,520 ha was kharif, but the booklet covers the older 12-taluka district and gives no area by crop (CGWB booklet). Village-level soil data: Soil Health Card portal (not opened for this page).

  • Alluvial
  • Black soil
  • Paddy
  • Cotton
  • Sugarcane

🌊 Rivers

The Narmada flows along the north-western boundary and the Mahi along the south; the booklet lists the Dhadhar basin (Jambuva, Surya, Viswamitre, Dhadhar), the Mahi basin (Mesari, Goma, Karad) and the Narmada basin (Unch, Heran, Dev, Orsang, Karjan, Aswan, Bhukhi) (CGWB booklet). We found no sourced flood record, so ask the seller about low-lying parcels near these channels.

  • Narmada
  • Mahi
  • Vishwamitri
  • Dhadhar

🌧️ Rainfall

The CGWB booklet gives 922.7 mm a year at the Baroda IMD station, of which the June to September months account for about 871 mm on our sum of its monthly values (CGWB booklet). The station is in the city and the data are dated.

  • 922.7 mm a year
  • Monsoon June–Sep

💧 Water & groundwater

In 2002 the booklet put groundwater development at 103.10% in Vadodara taluka (over-exploited), 85.37% in Karjan and 79.96% in Shinor (semi-critical), and 68.78% in Padra, 68.74% in Dabhoi, 52.65% in Savli and 23.01% in Vaghodiya (safe); it gives a district total of 67.59%, though elsewhere it quotes 53.50%. Wells supplied about 95% of the 2,35,860 ha irrigated, and canals only 4,818 ha gross (CGWB booklet). The 2024 CGWB assessment for Gujarat reports 22 over-exploited units statewide but, in the report we read, no district-wise stage, and lists Vadodara among districts with sporadic high conductivity, fluoride and nitrate (CGWB, Gujarat 2024). Test the water and check borewell yield for any parcel.

📐 Measurement units

Gujarat land units: guntha about 1,089 sq ft; 40 gunthas = 1 acre; vigha varies by region with no official conversion found. Convert every quote to gunthas or acres before comparing two offers. Live mandi prices are on Agmarknet (not opened for this page); farm income is modest next to land values near the city, so price a parcel on location and permitted use.

At a glance

Vadodara vs. nearby districts

District / beltPrice band* (per acre)Evidence
Vadodara (all talukas)No sourced price seriesNo figure used; jantri doubled statewide from 15 Apr 2023 (DeshGujarat, Feb 2023)
BharuchNo sourced price seriesExpressway packages 1 to 3 run from Vadodara to Manubar in Bharuch district (DeshGujarat, Jan 2026). No figure used on this page
Chhota UdepurNo sourced price seriesSeparate district with six talukas (CGWB, Oct 2022); five of its talukas were in the older Vadodara district (CGWB booklet). No figure used on this page
AnandNo sourced price seriesHigh-speed rail station reported complete, Vadodara still in progress (NHSRCL, undated). No figure used on this page

*No price band is shown because no registered-deal series or district jantri schedule was available. See the Tapi page for a Scheduled Area district in south Gujarat and the Gujarat page for the state overview.

Farmhouse plot with boundary stones near Vadodara, Gujarat

District report — Vadodara

Farmland India view

Why investors look at Vadodara

Five reasoned points, with an honest note that the price evidence is thin and several rail projects have only just started.

An expressway that is already open

The Delhi-Mumbai Expressway is open from Vadodara to Navsari, with light vehicles only and no toll yet. That is real access, but interchange locations are not published in the sources we read.

Three rail projects started in September 2026

A 259 km third and fourth line to Ratlam, a 37 km gauge conversion and a 33 km doubling had foundation stones on 8 September 2026, with no completion dates. They matter most for land near the lines.

A city with a ring road in progress

The Rs 1,500 crore ring road was reported progressing in April 2026, and the high-speed rail station is under construction. The alignment is not public in our sources, so the benefit is survey-number specific.

Groundwater is a real constraint

Vadodara taluka was over-exploited at 103.10% in the 2002 assessment and wells supply about 95% of irrigation. The data are old, so a borewell test matters.

A market that rewards paperwork

Farmer status, tribal-land sanction in the Scheduled Area parts, zoning and acquisition notices decide what a parcel can become. The case rests on location and permitted use, not crop yield.

Confirm farmer status, zone, NA and acquisition status directly; these are not certified by Farmland India’s review.

STRAIGHT TALK

Risks & challenges in Vadodara

Read these before shortlisting in Vadodara specifically.

Farmer-status rule

Section 63 bars transfers to non-agriculturists, and a state proposal to let non-farmers buy was under review in November 2024 with nothing enacted that we found. Ask for the seller's farmer evidence and the NA order.

Zone and boundary

Whether land is inside an urban development authority area changes what the fragmentation rule and building permission allow. We opened no authority page for Vadodara, so get the zone and boundary in writing.

Scheduled Area parts

Vadodara is partially covered by the Fifth Schedule and the page does not say which talukas. A transfer by a Scheduled Tribe holder without the Collector's sanction is reported to be void.

Acquisition notices

Rail, expressway and ring road works use survey-number notices. Search the Gazette for the survey number before paying a deposit.

Groundwater

Vadodara taluka was over-exploited in 2002 and the 2024 CGWB assessment lists Vadodara for sporadic quality issues. Check borewell depth, yield and water quality.

Disturbed Areas Act checks

Where a survey number lies in a notified area, the Collector's sanction is required and a transfer without it is void. We have no list, so ask the Collector or Sub-Registrar.

Announced is not delivered

The ring road has no completion date, the eight-lane widening is only proposed, and the new rail lines have no completion dates. Price on today's roads.

No sourced price series

We use no listing-site prices for Vadodara, and jantri is only a floor. Collect registered comparables before negotiating.

Who to contact

Local revenue & planning offices

Mutation and revenue-record matters go through the Mamlatdar of the taluka and the talati of the village, with the Prant officer (sub-divisional officer) above them and the District Collector at the top; the Vadodara district portal (Vadodara district portal) did not give a taluka list, so check the current taluka of any village. Zoning and building permission go through the local planning authority under the Gujarat Town Planning and Urban Development Act, 1976 (Act text, not opened); we opened no authority page for Vadodara. NA permission is applied for to the Collector, and acquisition notices appear in the Gazette. Sale-deed registration is handled by the Sub-Registrar office for the village, and land records are on AnyROR with registration on gARVI. We could not open the Revenue Department, AnyROR and gARVI portals, so check them directly.

COMMON QUESTIONS

Frequently asked questions

Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Vadodara.

Visit full wiki

01 of 04

What does agricultural land cost in Vadodara?

We publish no per-vigha or per-acre band for Vadodara because listing-site asking prices could not be traced to registered deals and no district jantri schedule could be opened. Gujarat's jantri was reported doubled from 15 April 2023 (DeshGujarat, February 2023), and jantri is a registration floor, not a market price. Collect registered comparables from the same village.

Transparency

Sources and references

Law and courts

Government

News

Further reading

Data-currency note: the CGWB booklet is undated and uses Census 2001 and 2002 groundwater data for an older district that included areas now in Chhota Udepur, so area, population, crop and groundwater figures are not current; the district portal pages that opened are undated; infrastructure statuses were read in October 2026 and change quickly; the stamp-duty rate is from an audit of 2017-18. A sidebar headline on the Narmada bridge was not opened as an article. Pages marked "not opened" are named only as places to check. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.

For developers

Ready to explore Vadodara farmland?

Browse reviewed projects and individual land parcels across Vadodara — or if you own land here, list it with platform review and reach serious buyers.

Farmland India ("the Platform"), operated by Bulk Procure Private Limited, is a digital marketplace for listing agricultural land, farmhouse and plotted development projects. The Platform is not a real estate broker, agent or intermediary under RERA or any other applicable law, and does not act for either party to a transaction.

Listings are submitted by developers, owners and their authorised representatives. Before publication, the Platform carries out a documentary review of the material supplied and records what was sighted. That review is limited to the documents made available to us at that time. It is not a title investigation, not a legal opinion, and not a warranty of title, approvals, or the accuracy of any information supplied by a lister. The Trust Score is an internal assessment produced from that review and is intended as a research aid, not as a guarantee of outcome.

Every buyer must carry out independent due diligence before any transaction — including verification of land records, encumbrance searches, approvals and regulatory compliance — through their own advocate and chartered accountant. Any legal or advisory professional introduced through the Platform is engaged directly by the user, on that professional's own terms; the Platform does not employ, supervise or accept responsibility for their work.

Nothing on the Platform is investment advice. Land values can fall as well as rise. The Platform is not liable for any loss, dispute or damage arising from a transaction between parties.