
District guide
Buying Land in Gwalior
A canal-irrigated wheat and mustard district in north-west Madhya Pradesh, with an expressway and a bypass under construction and sanctuaries on its edges.
4,560 sq km
Area
20.32 lakh
Population (Census 2011)
₹8–90 lakh per acre
Estimated land price*
88.4 km, under construction
Agra–Gwalior Expressway
*Indicative range across districts and land types. Stamp duty, registration and conversion charges are additional. Local measurement units vary — every listing states the unit it is priced in. Not a valuation or an offer.
District land record — Gwalior
Rev. 2026 · Farmland India desk
State
Madhya Pradesh
Sub-divisions
3 tehsils (Gird, Pichhor, Bhitarwar) and 4 blocks (Ghatigaon, Morar, Dabra, Bhitarwar) in the 2013 CGWB profile (CGWB district profile); the district portal page we opened does not list tehsils, so ask the Collector's office for the current list
Key markets
Gwalior city (Gird) · Morar · Dabra · Bhitarwar · Ghatigaon
Demand anchors
Agra–Gwalior Expressway and Western Bypass under construction · airport terminal open since April 2024 · railway station redevelopment under way
Rail
Gwalior Junction, redevelopment under way (Swarajya, April 2026)
Size and population
4,560 sq km · 20,32,036 people, Census 2011 (Gwalior district portal; the CGWB profile gives 4,564 sq km)
Estimated land price*
About ₹4–90 lakh per acre depending on the belt; see the price table. *Indicative only
Pricing unit
₹/acre (farm land) · ₹/sq ft (plots)
Local units
Hectares in court and acquisition papers; local units vary by tehsil, so convert any quote to acres or hectares (1 hectare = 2.47 acres) and match it to the khasra
Land records portal
MP Bhulekh (state portal; not opened for this page; ask the seller for a fresh khasra and B-1 extract)
Land law is state law. These rules are maintained on the Madhya Pradesh page and apply to every district within it.
Gwalior — land purchase legal rules
⚠ Madhya Pradesh does not run on a single rule for farmland. Tribal land, land above the holding ceiling, diverted land and ordinary farmland each follow a different track, and the Collector’s office sits at the centre of the first. Work out which track a parcel is on before looking at the price.
Which office decides what: A member of a tribe that the Code treats as aboriginal needs written permission from a revenue officer of at least Collector rank to sell land outside a notified area, and in a notified area the bar on sale to a non-tribal is absolute (section 165(6); Supreme Court, April 2025). The Supreme Court accepted in April 2025 that an Additional Collector can grant that permission under a valid work-allocation order (Lawyer E-News, April 2025). Sale deeds are registered through the Registration Department, which launched the Sampada 2.0 online registration system in October 2024 (The Statesman, October 2024).
Section 165 and tribal land: The April 2025 judgment concerned 6.29 hectares in Ratlam district outside the notified tehsils; the sale went through because the Additional Collector had given written permission, the price was above market value and a 10-year bar on changing the land’s use was attached under section 165(6-ee) (Supreme Court, April 2025). The High Court had earlier upheld the same sale and noted the Patwari’s report, the sellers’ need to fund a marriage and settle loans, and the land they kept (High Court, October 2023). Permission is a gate, not a formality: a sale with no permission is exposed. Under section 170B a transfer made by fraud can be reverted to the tribal owner or heirs, and the Supreme Court in March 2019 held that a civil court could not revisit a Collector’s 1985 section 170B order that had survived a writ petition (Supreme Court, March 2019).
Wills and indirect transfers: In February 2025 the High Court held that “transfer” in section 165(6) is not confined to sale and covers a Will of tribal land in favour of a non-tribal, so Collector permission was needed there too (High Court, February 2025). A buyer cannot assume that an inheritance document or a power of attorney avoids the permission step. There is a narrow carve-out: in October 2024 the High Court, relying on an older Division Bench ruling, held that sections 165(6) and 170 do not apply to Nazul land in an urban area, and sent the question of whether a given parcel was Nazul or Abadi back to the Additional Commissioner (High Court, October 2024).
Diversion and the Code: Turning farmland to another use is a diversion. A June 2022 High Court order refers to land “diverted under section 172” to non-agricultural purposes, and the Supreme Court has described section 59 as allowing reassessment of land revenue on a change of use, with a premium that the Sub-Divisional Officer may impose (High Court, June 2022; Supreme Court, August 2008). We could not read the current text of sections 172 and 190, so this page does not describe their procedure or fees, and a seller’s diversion order should be read in full, not taken on trust.
Ceiling on holdings: The Madhya Pradesh Ceiling on Agricultural Holdings Act, 1960 caps how much one holder or family may hold and provides for acquiring surplus land. In the 2021 case the Supreme Court quoted section 7(b) as allowing a family of five or fewer 54 acres, and set aside surplus declarations where a pending suit had not been disclosed (Supreme Court, January 2021). A legal-database copy of the Act lists three tiers for a family of five or fewer: 18 acres of two-crop irrigated land, 27 acres of one-crop irrigated land and 54 acres of dry land, and says land cannot be transferred before the final ceiling order without the Collector’s written permission, unless the holder is within the ceiling (legal database text of the 1960 Act). Treat those figures as the Act’s text as published there, and have a lawyer check the current schedule before buying a large holding.
Who may buy: None of the court orders or Act texts we opened bars a buyer simply for not being a farmer; the limits that turned up were the tribal-land permission in section 165(6) and the ceiling on holdings. We found no state notice listing other buyer conditions, so confirm with the Registration Department and the Collector’s office that none applies to the district you are looking at.
Registration and stamping: The Indian Stamp (Madhya Pradesh Second Amendment) Act, 2025 was published on 17 December 2025 and changes how short-stamped documents are handled, including a penalty of 1% of the deficient portion per month (TeamLease RegTech, December 2025). Duty rates are covered in the stamp duty section below.
Land records: Madhya Pradesh land records (khasra and the B-1 extract) are issued through the state’s MP Bhulekh portal. We could not open that portal for this page and found no independent description of its current fields or fees, so ask the seller for a fresh extract and compare the survey number, area and recorded owner with the sale deed.
NRI and OCI buyers: The Reserve Bank’s Master Direction under FEMA 1999 excludes agricultural land, plantation land and a farm house from what NRIs and OCIs may buy, in Madhya Pradesh as elsewhere (RBI Master Direction FED 12/2015-16, updated to September 2022). They can buy other immovable assets such as residential or commercial sites, and inheritance is treated separately in the Direction. Benami-law exposure was not checked against the Act text for this page, so take legal advice before using a nominee.
- Land Revenue Code 1959
- Section 165(6) tribal land
- Ceiling Act 1960
- Wills need permission
- NRI agri: barred (FEMA)
- Sampada 2.0
Gwalior — district-specific notes
The Madhya Pradesh state page applies to Gwalior in full. The notes below are specific to this district and are not repeated from the state page. Law is taken from the court orders and Act texts used on the state page; where an official page did not open, the note says so.
⚠ The tribal-land rule in section 165(6) of the Madhya Pradesh Land Revenue Code, 1959 follows the seller's community, not the district. We found no source listing Scheduled Areas or notified tehsils for Gwalior, so ask the Tehsildar whether the recorded owner belongs to a tribe the Code covers. If so, written permission from an officer of Collector rank or above is needed (Supreme Court, April 2025), and a transfer made by fraud can be reverted under section 170B (Supreme Court, March 2019). CONFIRM per khasra.
⚠ Two protected areas appear on the Gwalior tourism page: Ghatigaon wildlife sanctuary, listed at 512 sq km and about 70 km from Gwalior, and the National Chambal Sanctuary, about 400 km of river and 105 km away (Incredible India, Gwalior). We found no eco-sensitive-zone notification for either, so ask the Divisional Forest Officer in writing whether a khasra near a boundary carries restrictions. The Agra–Gwalior Expressway is planned to cross the Chambal sanctuary on a cable-stayed bridge with wildlife mitigation (Patrika, May 2026).
⚠ A farmhouse or any other non-farm use needs diversion under section 172 of the Code. A June 2022 High Court order refers to land "diverted under section 172" (High Court, June 2022), and the Supreme Court has described reassessment and a premium under section 59 (Supreme Court, August 2008). We could not read the current sections, so ask the revenue office for the procedure for the khasra. Land near the Western Bypass or the expressway end may sit inside a development plan or an acquisition notification; we did not open Gwalior's plan, so ask the Town and Country Planning office and the Collector.
⚠ Canals irrigate about 77,000 of 137,300 gross irrigated hectares in the ICAR-CRIDA plan (ICAR-CRIDA, Gwalior), so much of the district's farm land is irrigated. The Ceiling Act tiers on the state page (18 acres of two-crop irrigated land, 27 acres of one-crop and 54 acres of dry land for a family of five or fewer, from a legal-database copy; CONFIRM) therefore matter to a buyer assembling a large holding (legal-database text).
Read the state-wise land laws guide and the Madhya Pradesh state page for buyer eligibility, stamp duty and NRI rules.
- Land Revenue Code 1959
- Section 165(6) tribal land
- Ghatigaon sanctuary
- Chambal sanctuary
- Ceiling Act 1960
District overview
Gwalior — a canal-irrigated plain with an expressway and a bypass under construction
Gwalior is a north-western Madhya Pradesh district of 4,560 sq km with 20,32,036 people at Census 2011, about 63% of them in towns, and 618 villages (Gwalior district portal). The CGWB profile lists three tehsils (Gird, Pichhor and Bhitarwar) and four blocks (Ghatigaon, Morar, Dabra and Bhitarwar), and names the Parbati, Neon, Morar and Sind as the main drainage (CGWB district profile). Tehsil lists change, so the current one should come from the Collector's office.
We show estimated bands rather than asking prices: roughly ₹8 lakh to ₹25 lakh per acre* for irrigated rural farm land and ₹30 lakh to ₹90 lakh per acre* near the city and the bypass corridor. The bands are rounded and wide because we found no district guideline-rate schedule for farm land and no dated revision report for Gwalior. The estimate is not a valuation.
Gwalior is wheat and mustard country on a canal-fed plain. The ICAR-CRIDA plan, using 2006-07 crop data, puts wheat on 87,000 hectares and mustard on 55,600, with canals supplying 56% of gross irrigated area (ICAR-CRIDA, Gwalior). Road access is the change: an 88.4 km Agra–Gwalior Expressway is under construction (Patrika, May 2026) and a 28.5 km Western Bypass is targeted for January 2028 (Swarajya, April 2026).
- Gwalior city
- Dabra
- Bhitarwar
- Ghatigaon
- Western Bypass
- Agra–Gwalior Expressway
Transaction costs
Stamp duty & registration in Gwalior
7.5%
Stamp duty (reported)
reported on the higher of market value or transaction value; Registration Department page not opened
3%
Registration fee (reported)
reported on the same base; Registration Department page not opened
~10.5%
Combined (reported)
sum of the two reported rates; an earlier report gave 9.5% to 12.5%
Dainik Jagran English reported on 27 March 2026 stamp duty of 7.5% and a registration charge of 3% on the higher of market value or transaction value. Its 25 March piece said a guideline-rate rise would raise duty and fees in proportion, and that the state had told the Vidhan Sabha no fresh taxes would be levied (Dainik Jagran English, March 2026). We could not open the Registration Department's own fee page, so treat these as reported figures; an earlier piece put the combined range at 9.5% to 12.5%. Ask the Sub-Registrar for the current schedule for agricultural land before you budget. Since 17 December 2025 a short-stamped document attracts a penalty of 1% of the shortfall per month (TeamLease RegTech, December 2025). Registration can be done online through Sampada 2.0, which also shows guideline rates by location (The Statesman, October 2024). We found no Gwalior-specific guideline-rate schedule or revision report for farm land, so check the rate for the khasra's location on Sampada 2.0 or with the Sub-Registrar. The March 2026 reports describe a proposed state-wide average rise of 12% for 2026-27; we did not confirm approval.
Know the belt
What is moving prices in Gwalior
Estimates are rounded and wide. Official figures found for this district are limited to area, population, crop and irrigation data.
Irrigated plains: Dabra, Bhitarwar, Gird villages
Estimated ₹8–25 lakh per acre*
Canal-irrigated wheat land in the rural tehsils forms the main farm-land market. The band is an estimate by analogy with comparable districts, rounded and wide. Irrigation matters most to value: in the ICAR-CRIDA plan canals supply 77,000 hectares and open wells 43,100 (ICAR-CRIDA, Gwalior).
Check: whether the khasra is canal-irrigated or relies on a well, and the guideline rate with the Sub-Registrar.
City fringe and the bypass corridor
Estimated ₹30–90 lakh per acre*
Land between Gwalior city and the planned Western Bypass, and near the expressway end at Susera, is where the road news is concentrated (Swarajya, April 2026; Patrika, May 2026). Prices here also carry plotting potential, which needs diversion and a layout approval; plot and farm-land prices are not comparable.
Check: diversion and development-plan status, and whether any acquisition notification covers the khasra.
Ghatigaon and rain-fed, shallow-soil ground
Estimated ₹4–12 lakh per acre*
The ICAR-CRIDA plan records 24% of the district's soils as shallow and a rainfed area of 89,400 hectares, with most of the mustard rain-fed (ICAR-CRIDA, Gwalior). Ghatigaon sanctuary lies in the same belt (Incredible India, Gwalior).
Check: forest and sanctuary status, water source and road access before paying a deposit.
Guideline rates and acquisition awards
No district rate schedule found
We found no Gwalior guideline-rate (collector rate) schedule for farm land. Statewide, Dainik Jagran English reported in March 2026 a proposed average rise of 12% for 2026-27, and approval was not confirmed. On 22 April 2026 the cabinet cleared higher compensation for rural land acquisition; the Free Press Journal report is inconsistent on whether the multiplier is two or four times market value, so we quote neither (FPJ, April 2026).
Check: the rate in force on the sale-deed date on Sampada 2.0 or with the Sub-Registrar.
Units: acres and hectares
Court orders and acquisition papers in this district use hectares; local land units vary by tehsil. Convert any quote to hectares or acres (1 hectare = 2.47 acres) and match it to the area in the khasra before comparing two offers. We did not open a revenue manual for local units.
Connectivity
How Gwalior connects — road, rail and air
Distances to Delhi, Agra and Bhopal are not given because no official or news source was found. Journey times vary with traffic and road works.
By road
By air
By rail & metro
The practical question is the last leg from the highway to the parcel; ask for the access road in the revenue record. Rules for buyers from outside the state: state-wise land laws.
Growth catalysts
Upcoming infrastructure & developments
Status labels reflect sources read in October 2026. Government-announced timelines are not guaranteed; items marked to confirm have a single or an older source.
01Open or inaugurated
04In progress or pending
Agriculture & terrain
Soil, crops & water in Gwalior
A canal-irrigated wheat and mustard plain, with shallow-soil, rain-fed ground towards Ghatigaon and a river belt along the Sind and Parbati.
🌾 Canal-irrigated plains (Gird, Dabra, Bhitarwar)
The ICAR-CRIDA district plan (crop data for 2006-07, so dated) gives wheat on 87,000 hectares, mustard on 55,600, chickpea on 21,900, paddy on 15,900 and soybean on 15,900, from a net sown area of 195,700 hectares and a cropping intensity of 129%. Canals irrigate 77,000 hectares, open wells 43,100 and bore wells 11,600 (ICAR-CRIDA, Gwalior).
- Wheat
- Mustard
- Chickpea
- Paddy
⛰️ Shallow soils and the sanctuary belt (Ghatigaon)
The plan puts 61% of the district's soils as deep, 15% medium-deep and 24% shallow (ICAR-CRIDA, Gwalior). Ghatigaon sanctuary is listed at 512 sq km, about 70 km from Gwalior (Incredible India, Gwalior). Forest and sanctuary status matters more than soil near its boundary.
- Ghatigaon
- Shallow soil
- Rain-fed
🌊 River belt
The CGWB profile names the Parbati, Neon, Morar and Sind as the main drainage, with the Baisali, Pahuj, Sank and Asan as tributaries (CGWB district profile). We found no flood-history source for the district, so ask the seller about flooding and check levels against the nearest drain on any low-lying parcel.
- Sind
- Parbati
- Morar
- Neon
💧 Water & rainfall
Normal annual rainfall is 764.4 mm, of which 701.7 mm falls in the south-west monsoon (ICAR-CRIDA, Gwalior; the CGWB profile gives the same annual figure). The CGWB booklet records a stage of groundwater development of 42%, based on 2009 resources, so it is old data (CGWB district profile). The 2024 state assessment puts Madhya Pradesh at 58.40% extraction (Safe) and lists Gwalior among districts with nitrate above 45 mg/L at sporadic locations, plus electrical-conductivity and uranium anomalies (CGWB, 2024). We found no 2024 stage of extraction for Gwalior. Test the water and ask for the borewell yield before relying on it.
📐 Measurement units
Court orders and acquisition papers use hectares; local land units vary by district and tehsil, so convert every quote to acres or hectares (1 hectare = 2.47 acres) and match it to the khasra before comparing two offers. Crop income is modest next to land values near the city, so price a parcel on location, irrigation and permitted use, not on wheat yield.
At a glance
Gwalior vs. other Madhya Pradesh districts
| District / belt | Price band* (per acre) | Evidence |
|---|---|---|
| Gwalior — canal-irrigated rural tehsils | ₹8–25 lakh* | Estimate; no notified rate seen |
| Gwalior — city fringe and bypass corridor | ₹30–90 lakh* | Estimate; wide band, plotting potential |
| Ujjain — rural black-soil belt | ₹10–30 lakh* | Estimate; see the Ujjain page |
| Sagar — rural plains | ₹6–18 lakh* | Estimate; see the Sagar page |
*Indicative only, not a valuation or an offer; prices vary by plot, road access and title. Check the guideline rate with the Sub-Registrar. See the Ujjain page for the Malwa belt around the 2028 Simhastha and the Sagar page for a central district with a tiger reserve.
Farmland India view
Why investors look at Gwalior
Five reasoned points, with an honest note that the price evidence is thin and several road projects are still pending.
A canal-irrigated farm district beside a city
About 63% of the district's people live in towns, and canals supply more than half of its irrigated area. That pairing of an urban market with irrigated wheat land is the basic case for the district.
Roads are the main catalyst
The Agra–Gwalior Expressway is under construction but about eight months behind, and the Western Bypass is targeted for January 2028. That is progress, not delivery, so price on today's roads.
Air and rail upgrades are partly in place
The airport terminal has been open since April 2024, and station redevelopment is under way with no completion date. Treat both as supporting access, not as a reason to pay a premium.
A wide spread between farm land and fringe land
Our rounded bands run from about ₹8 lakh to ₹25 lakh per acre* for irrigated rural land to ₹30 lakh to ₹90 lakh* near the bypass corridor. The spread shows how much road access and permitted use matter.
A market that rewards paperwork
Tribal-land permission, diversion, sanctuary boundaries and acquisition notices are all parcel-specific. A buyer who documents each one is better placed than one relying on a broker summary.
Confirm diversion, planning, forest and guideline-rate status directly; these are not certified by Farmland India’s review.
STRAIGHT TALK
Risks & challenges in Gwalior
Read these before shortlisting in Gwalior specifically.
Tribal-land permission
Section 165(6) permission follows the seller's community. We found no Scheduled Area list for Gwalior, so check the recorded owner's status with the Tehsildar before any deposit.
Protected areas
Ghatigaon sanctuary and the National Chambal Sanctuary are on the tourism page; no eco-sensitive-zone order was found. Ask the Divisional Forest Officer about any khasra near a boundary.
Announced is not delivered
The expressway is about eight months behind, the Western Bypass targets January 2028, Atal Progressway tenders for packages 3 to 6 were cancelled in January 2024 and the station plan has no end date. Price on today's fundamentals.
Diversion and planning approvals
A parcel marketed as farmhouse-ready may not hold a section 172 order. Read the order in full, and check whether the khasra is inside a development plan or acquisition notification.
Groundwater quality
The 2024 state assessment lists Gwalior for nitrate, conductivity and uranium anomalies, and the district's own stage of development rests on 2009 data. Test the water.
Compensation disputes along corridors
Farmers in Dholpur protested compensation on the Agra–Gwalior Expressway, and the April 2026 cabinet decision is reported inconsistently. A khasra in an alignment may be tied up in notices.
Estimated prices
Bands marked * are our rounded estimates, not registered deals. Collect registered comparables in the same revenue estate before negotiating.
Who to contact
Local revenue, planning & forest offices
Mutation and revenue-record matters go through the Tehsildar of the relevant tehsil (the 2013 CGWB profile lists Gird, Pichhor and Bhitarwar; confirm the current list), under the District Collector, whose office is on the Gwalior district portal. Ask the revenue office which officer handles section 172 diversion for a given khasra, the Divisional Forest Officer about forest or sanctuary status, and the Town and Country Planning office about development-plan zoning. Sale-deed registration is handled by the local Sub-Registrar, and registration is now online through Sampada 2.0 (The Statesman, October 2024). We could not open MP Bhulekh or the Registration Department pages, so check them directly.
KEEP EXPLORING
Explore more areas
Other districts in Madhya Pradesh
- Agar Malwa
- Alirajpur
- Anuppur
- Ashok Nagar
- Balaghat
- Barwani
- Betul
- Bhind
- Bhopal
- Burhanpur
- Chhatarpur
- Chhindwara
- Damoh
- Datia
- Dewas
- Dhar
- Dindori
- Guna
- Harda
- Hoshangabad
- Indore
- Jabalpur
- Jhabua
- Katni
- KhandwaAgricultural Land • 1 listing
- Khargone
- Mandla
- Mandsaur
- Mauganj
- Morena
- Narsinghpur
- Neemuch
- Niwari
- Pandhurna
- Panna
- Raisen
- Rajgarh
- Ratlam
- Rewa
- Sagar
- Satna
- Sehore
- Seoni
- Shahdol
- Shajapur
- Sheopur
- Shivpuri
- Sidhi
- Singrauli
- Tikamgarh
- Ujjain
- Umaria
- Vidisha
COMMON QUESTIONS
Frequently asked questions
Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Gwalior.
Visit full wiki01 of 04
What does agricultural land cost in Gwalior?
Our rounded estimate is about ₹8 lakh to ₹25 lakh per acre* for canal-irrigated rural land and ₹30 lakh to ₹90 lakh per acre* near the city and the Western Bypass corridor. *Indicative only, not a valuation or an offer; prices vary by plot, road access and title. Check the guideline rate with the Sub-Registrar.
02 of 04
Does any land in Gwalior need special permission to buy?
Under section 165(6) of the Madhya Pradesh Land Revenue Code, a tribal owner needs written permission from an officer of Collector rank or above to sell (Supreme Court, April 2025). We found no Scheduled Area list for Gwalior, so check the owner's status per khasra. Land near Ghatigaon or the National Chambal Sanctuary should also be checked with the Divisional Forest Officer.
03 of 04
What stamp duty applies to land in Gwalior?
Dainik Jagran English reported in March 2026 stamp duty of 7.5% and a registration fee of 3% on the higher of market or transaction value, about 10.5% combined. We could not open the Registration Department's fee page, so confirm both with the Sub-Registrar.
04 of 04
Which infrastructure affects Gwalior?
The 88.4 km Agra–Gwalior Expressway is under construction and about eight months behind (Patrika, May 2026), the 28.5 km Western Bypass is targeted for January 2028 (Swarajya, April 2026), the airport terminal has been open since April 2024 and Gwalior Junction is being redeveloped. The Atal Progressway timeline is unconfirmed.
Ready to look at what is available?
Browse reviewed listingsTransparency
Sources and references
Law and courts
- State of Madhya Pradesh v. Dinesh Kumar, 2025 INSC 470, Supreme Court, 8 Apr 2025 (section 165(6))
- Dinesh Kumar v. State of Madhya Pradesh, Misc. Petition 3679 of 2021, MP High Court (Indore), 3 Oct 2023
- Pooran Singh v. Dhaniram, Civil Appeal 3122 of 2019, Supreme Court, 14 Mar 2019 (section 170B)
- Second Appeal 2837 of 2022, MP High Court (Jabalpur), 17 Feb 2025 (Will of tribal land)
- Bherulal v. State of Madhya Pradesh, Writ Petition 26410 of 2022, MP High Court (Indore), 14 Oct 2024 (urban Nazul land)
- Garvit Khandelwal v. State of Madhya Pradesh, Writ Appeal 200 of 2021, MP High Court (Indore), 15 Jun 2022 (diversion under section 172)
- Civil Appeals 7732-7733 of 2004, Supreme Court, 26 Aug 2008 (reassessment and premium, section 59)
- Bajranga v. State of Madhya Pradesh, Civil Appeal 6209 of 2010, Supreme Court, 19 Jan 2021 (Ceiling Act, 1960)
- Madhya Pradesh Ceiling on Agricultural Holdings Act, 1960 (sections 5 and 7 text), Legitquest legal database
- Master Direction FED 12/2015-16 on immovable assets under FEMA 1999, Reserve Bank of India, updated to 1 Sep 2022
Government
- Gwalior district statistics (area, population, villages), Gwalior district portal
- Ground water information booklet, Gwalior district (tehsils, blocks, rainfall, irrigation, stage of development on 2009 resources), Central Ground Water Board, 2013
- District agriculture contingency plan, Gwalior, ICAR-CRIDA (crop data 2006-07)
- Into the wild: Ghatigaon and National Chambal sanctuaries, Incredible India (Ministry of Tourism)
- Dynamic Ground Water Resources of Madhya Pradesh, assessment 2024, Central Ground Water Board
- Madhya Pradesh state profile (area, districts, population), State Level Bankers Committee Madhya Pradesh
News
- Agra-Gwalior Expressway land acquisition and progress, Patrika, 21 May 2026
- Scindia reviews Gwalior western bypass and railway station upgrade, Swarajya, 30 Apr 2026
- Atal Progressway (Chambal Expressway) information and status, The Metro Rail Guy, updated 6 Jul 2024
- Commercial operations commenced on new terminal at Gwalior Airport, Indian Infrastructure, 5 Apr 2024
- Madhya Pradesh guideline rate hike proposed for 2026-27, stamp duty and registration charges, Dainik Jagran English, 27 Mar 2026
- Indian Stamp (Madhya Pradesh Second Amendment) Act, 2025, notified 17 Dec 2025, TeamLease RegTech
- MP CM launches online portal for e-registry (Sampada 2.0), The Statesman, Oct 2024
- Madhya Pradesh state cabinet clears higher compensation for rural land acquisition, Free Press Journal, 22 Apr 2026
Further reading
- Ramendra Singh v. State of Madhya Pradesh, Supreme Court, 23 Jan 1984 (ceiling area and family)
- Indian Stamp (Madhya Pradesh Amendment) Act, 2022 (Act 17 of 2022), Legitquest legal database
- No bar on tribal land sale outside notified area, Supreme Court, Lawyer E-News, 11 Apr 2025
- Bhopal: 12% guideline rate hike proposed, Dainik Jagran English, 25 Mar 2026
- Land costlier in 18,000 locations, new collector guidelines from 1 April 2023, Free Press Journal, 27 Mar 2023
- Formation of new districts, The Hitavada, 2 Sep 2024
- Gadkari on Delhi-Mumbai Expressway completion, Business Today, 9 Jul 2026
- Madhya Pradesh plans Narmada Pragati Path, Free Press Journal, 2 Aug 2026
Data-currency note: area and population are district-portal figures (Census 2011); crop and irrigation data come from an ICAR-CRIDA plan that uses 2006-07 crop data and a 2013 CGWB booklet using 2009 groundwater resources; infrastructure statuses were read in October 2026 and change quickly; stamp duty and fees are press-reported. Price bands marked * are our rounded estimates. Pages marked "not opened" are named only as places to check. This is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.
For developers
Ready to explore Gwalior farmland?
Browse reviewed projects and individual land parcels across Gwalior — or if you own land here, list it with platform review and reach serious buyers.