
District guide
Buying Land in Kasganj
A Ganga-doab wheat and bajra district with Soron's pilgrimage economy and a Mathura–Bareilly four-lane highway under construction, with no sourced per-acre price series.
1,993.08 sq km
Area (district portal)
1,436,719
Population (district portal)
715
Villages (district portal)
~95,800 ha
Wheat (2011-12)
District land record — Kasganj
Rev. 2026 · Farmland India desk
State
Uttar Pradesh
Division
Not stated on the portal pages opened; confirm with the district office
Key markets
Kasganj city · Soron · Patiyali · Sahawar · Ganj Dundwara · Sidhpura
Demand anchors
Soron pilgrimage town · Mathura–Bareilly four-lane project under construction · wheat and bajra farming
Distances
Not sourced; check a live route
Land units
Square yards, acres and hectares appear in records; ask for the area in the khatauni
District changes
Formed 17 April 2008 from three Etah tehsils; first named Kanshi Ram Nagar
Land records portal
UP Bhulekh (khatauni) · IGRSUP for registration
Land law is state law. These rules are maintained on the Uttar Pradesh page and apply to every district within it.
Kasganj — land purchase legal rules
⚠ Two checks come before any advance in Uttar Pradesh: the Revenue Code limit of 5.0586 hectares (about 12.5 acres) on what one person can acquire by purchase or gift, and the registry position in the DNGIR villages near Noida, where a purchase halt was reported in January 2024 and no later word was found. UP Revenue Code 2006, section 89; Sakshi Post, January 2024.
Who can buy agricultural land? The Revenue Code sections we read set a size limit (section 89) and special rules for land held by Scheduled Caste and Scheduled Tribe members (sections 98 and 99). None asks the buyer to be a farmer or to live in the state (UP Revenue Code 2006, IGRS UP). We did not read the whole tenure chapter, so ask the Sub-Registrar whether anything further applies. The Code repealed the Zamindari Abolition and Land Reforms Act 1950 when it was enforced on 18 December 2015 (SCC Online, February 2016).
Holding limit: section 89(2) of the Code bars a purchase or gift that would take the buyer's total holding in Uttar Pradesh above 5.0586 hectares, about 12.5 acres on our conversion (UP Revenue Code 2006). Under the earlier Act the Supreme Court read a company as a person for this limit and let the excess vest in the State (Oswal Fats and Oils, April 2010). The separate 1960 Ceiling Act caps total holdings; the India Code text gives 7.30 hectares of irrigated land for a family of five or fewer, with additions for larger families, and the text mixes acres and hectares, so the current schedule needs checking (India Code).
DNGIR villages: the Dadri-Noida-Ghaziabad Investment Region covers 84 notified villages, 63 in Bulandshahr and 21 in Gautam Buddh Nagar, notified in October 2024 (Swarajya, July 2026). In January 2024 a Noida Authority letter to the Stamp Department halted purchase and sale in the proposed villages, with registration of agricultural land needing the Authority's consent (Sakshi Post, January 2024). Two July 2026 reports on acquisition by mutual consent do not mention the halt (Millennium Post, July 2026), so ask the Noida Authority or the District Magistrate's office whether it still applies to a given village.
Scheduled Caste and Scheduled Tribe land: a Scheduled Caste bhumidhar needs the Collector's previous written permission to transfer land to a non-Scheduled Caste buyer (section 98), and a Scheduled Tribe bhumidhar may not transfer to a non-Scheduled Tribe buyer (section 99) (UP Revenue Code 2006). The Allahabad High Court described a transfer without the permission as void in Omwati v District Collector, Pilibhit, November 2022.
NRI & OCI buyers: the Reserve Bank's Master Direction under FEMA 1999 excludes agricultural land, plantation land and a farm house from what NRIs and OCIs may buy or receive as a gift (paragraphs 3.1.1 and 3.1.2). Inheritance is covered separately in paragraphs 3.1.3 and 3.1.4, without that exclusion (Reserve Bank of India Master Direction FED 12/2015-16).
- Revenue Code 2006
- Purchase limit: 5.0586 ha
- DNGIR: 84 villages
- SC land: Collector permission
- NRI agri: barred (FEMA)
- Ceiling Act 1960
Kasganj — district-specific notes
The full Uttar Pradesh legal framework on the state page (ceiling, stamp duty, SC/ST land, NRI rules) applies to Kasganj in full. The notes below are specific to this district and are not repeated from the state page.
⚠ The Ganga forms the district's north-eastern boundary with Budaun, the Kali is perennial and the Burhi Ganga is ephemeral (district portal). Land near a river channel or old course can be flood-prone or carry a river-boundary dispute. Ask the Irrigation Department and the Tehsildar for flood and river-course status in writing, and walk the parcel in the monsoon before paying an advance.
⚠ Kasganj district was formed on 17 April 2008 by taking the Kasganj, Patiyali and Sahawar tehsils out of Etah, and was first named Kanshi Ram Nagar (district portal). Older deeds, khatauni extracts and listings may show Etah or the earlier name, so confirm the tehsil and the Sub-Registrar office that holds the parcel's records.
⚠ A Mathura–Bareilly four-lane highway is being built through Kasganj. Reports describe a 228 km NHAI project with a 57 km Hathras–Kasganj section and a 46 km Kasganj–Budaun section (News24, May 2025), and put completion at the end of 2027 (UP Chauraha, December 2025). A parcel on or near the alignment can be taken in part or whole, so ask the Tehsildar whether any acquisition or right-of-way notification covers the village.
- Ganga Floodplain
- Kali River
- Kanshiram Nagar
- Etah Records
District overview
Kasganj — a farming district on the Ganga with Soron's pilgrimage economy
Kasganj covers 1,993.08 sq km, ranks 68th in Uttar Pradesh by area, and has three tehsils (Kasganj, Sahawar and Patiyali), seven blocks and 715 villages (district portal). The portal's home page shows 1,436,719 people (district portal home page). Soron, on the Mathura–Bareilly road, is a pilgrimage town: the state declared the Soron Sukar area a pilgrimage site on 28 October 2021 (Drishti IAS, October 2021), and the district portal links it to the Varaha incarnation, notes that Saint Tulsidas was born in the district and calls the Margshirsh Ekadashi fair very famous (culture and heritage page).
We found no sourced road distances to Delhi, Agra or Mathura, so check a live route. The district portal names the Mathura–Bareilly road at Soron and a broad-gauge rail link to Tundla Junction on the Delhi–Howrah main line (district portal). The major road change is the Mathura–Bareilly four-lane project, reported at 228 km and about Rs 7,700 crore: in December 2025 work up to Kasganj was reported mostly complete and the Kasganj–Budaun stretch more than half done, with completion expected at the end of 2027 (UP Chauraha, December 2025).
On the land side Kasganj is Ganga-doab farmland with wheat as the lead crop, then bajra, maize and some sugarcane (ICAR-CRIDA). We found no sourced per-acre price series: listing-site figures contradicted each other by up to ten times and were removed. Read the legal rules in our Uttar Pradesh land rules guide and compare the district on the Uttar Pradesh state page.
- Kasganj
- Soron
- Patiyali
- Sahawar
- Ganga River
- Kali River
Market & connectivity
What is moving prices in Kasganj
Reported figures with the source of each named. Listing-site asking prices are not used.
Why there is no price table
Asking prices from listing sites were removed because they cannot be traced to registered deals, and the two sites we checked disagreed by up to ten times. We found no registered-rate, collector-rate or news series for farmland in Kasganj. Collect registered sale deeds for the same village before pricing an offer.
Circle rates
District magistrates set minimum land rates each year and can revise them mid-year (PTI via The Week, March 2025). That report is statewide and we have not checked whether it covers Kasganj. We did not open the Kasganj rate table, so no figure is given.
Mathura–Bareilly highway
The four-lane project is reported at 228 km and about Rs 7,700 crore, with the Hathras–Kasganj and Kasganj–Budaun sections running through the district (News24, May 2025). A project profile puts the Hathras–Kasganj section at about 60 percent complete and completion in December 2027 (Blackridge Research); reports differ on progress. We found no sourced price movement along the route.
Units
Records show area in hectares, acres or square yards. Ask for the khasra number and the area in the khatauni, compare it with the sale deed, and convert any seller's quote before comparing offers.
Soron and the pilgrim economy
Soron's pilgrim fairs and the state's 2021 pilgrimage declaration (Drishti IAS) support town-edge guesthouse and plot demand rather than farm prices. No Soron-specific price was found. Check the Ganga floodplain status before buying near the river.
Stamp duty and circle rate
The state page gives the Uttar Pradesh stamp-duty structure, which is flagged CONFIRM there. No Kasganj circle rate was read for this page, so check the village rate with the Sub-Registrar or IGRS UP before pricing an offer.
Connectivity
How Kasganj connects — road, rail and air
Kasganj sits on the Mathura–Bareilly road and a broad-gauge rail line to Tundla. No surveyed distances to Delhi, Agra or Mathura were opened for this page, so check a live route; journey times vary with traffic and road works.
🚗 By road
✈️ By air
🚆 By rail
🛣 Mathura–Bareilly highway under construction
The Mathura–Bareilly four-lane project passes through Kasganj (News24, May 2025); see its status in the infrastructure section below. For wider context read our Uttar Pradesh land-rules guide.
Growth catalysts
Upcoming infrastructure & developments
Status labels maintained by the Farmland India research desk. Government-announced timelines — not guaranteed.
Rail link to Tundla
The district portal describes a broad-gauge line of the North Eastern Railway to Tundla Junction on the Delhi–Howrah main line (district portal). We found no sourced upgrade.
Mathura–Bareilly four-lane highway
A 228 km NHAI project, reported at about Rs 7,700 crore, with sections from Hathras to Kasganj (57 km) and Kasganj to Budaun (46 km) (News24, May 2025). Completion is expected at the end of 2027 (UP Chauraha, December 2025). A planned Ganga bridge at Soron has no separately confirmed date (Blackridge Research).
No airport or industrial node found
The district portal says economic output depends mainly on agriculture, animal husbandry, forestry, transport, mining and quarrying, and manufacturing (district portal). Land-price stories built on an unnamed project should be treated as unsupported unless a notification is produced.
Agriculture & terrain
Soil, water & crops in Kasganj
Kasganj is a Ganga-doab alluvial plain of deep loam with about a tenth of its soil saline-alkaline. Water quality and soil tests are the key checks.
🌾 Cropped area
The ICAR-CRIDA district plan gives a net sown area of 141,200 hectares and a cropping intensity of 149% (ICAR-CRIDA). Wheat covers about 95,800 hectares, bajra 36,100, maize 30,300, rice 16,000, mustard 8,100 and sugarcane 7,300 (2011-12). Village-level soil data sits on the Soil Health Card portal, which we did not open.
- Wheat
- Bajra
- Maize
💧 Water
Normal annual rainfall is about 695 mm, of which 612 mm falls in the monsoon. Tube wells supply 61.3% of gross irrigated area, open wells 27.9% and canals 10.8% (ICAR-CRIDA). The plan counts one over-exploited block and does not name it. The CGWB 2024 assessment lists Kasganj for nitrate above 45 mg per litre and uranium above 30 ppb in some samples, and gives no block-wise status for the district (CGWB, December 2024).
🟫 Soil, rivers and records
The plan puts deep loam at 45% of the area, deep silty loam at 24%, deep fine soil at 18% and saline-alkaline soil at 10% (ICAR-CRIDA). The Ganga bounds the district to the north-east and the Kali is perennial (district portal).
- Loam
- Saline-alkaline
🌾 Mandi price reference
Wholesale prices for district mandis are published daily on the Agmarknet portal, which we did not open for this page. Farm income here depends on wheat and bajra, so price a parcel on its soil, water and access as well as on any listing headline.
At a glance
Kasganj: price evidence at a glance
| District / belt | Price evidence (per acre) | Evidence |
|---|---|---|
| Kasganj district | No sourced per-acre series | Village circle rates on IGRS UP; not opened for this page |
| Along the Mathura–Bareilly highway | No sourced per-acre series | Four-lane project under construction (News24) |
| Soron pilgrimage belt | No sourced per-acre series | State pilgrimage declaration, 2021 (Drishti IAS) |
| Kasganj town edge | No sourced per-acre series | No transaction data found |
*No per-acre price series was found for any row, so none is shown. The rows list the corridors and places that touch each belt. Nothing here is a valuation.
Farmland India view
Why investors look at Kasganj
Three reasons this desk includes Kasganj, with a plain note that no price series was sourced.
A highway under construction
The Mathura–Bareilly four-lane project runs through the district with completion expected at the end of 2027 (UP Chauraha). Buy on today's access, not on the finished road.
A real farming economy
A cropping intensity of 149% and wheat on 95,800 hectares, with about 61% tube-well irrigation, give a working agricultural base (ICAR-CRIDA).
Soron and the Ganga
Soron is a pilgrimage town the state declared a pilgrimage site in 2021 (Drishti IAS), which gives a small hospitality and second-home case near the river, subject to floodplain checks.
Confirm river, floodplain and record-history status directly — these are not certified by Farmland India's review.
STRAIGHT TALK
Risks & challenges in Kasganj
Read these before shortlisting in Kasganj specifically.
No sourced price series
We found no official or news price series for farmland here, and listing sites disagreed widely. Collect several registered comparables before negotiating.
Floodplain and river-course risk
The Ganga and Kali bound and drain the district. A parcel near either channel needs flood and river-boundary checks in writing.
Saline-alkaline soil and water quality
About a tenth of the soil is saline-alkaline and CGWB lists nitrate and uranium above limits in some samples. Test soil and borewell water.
Highway not yet finished
The Mathura–Bareilly project is under construction, with completion expected at the end of 2027. A parcel on the alignment can be taken in part or whole; price a parcel on today's access.
Distances not sourced
We found no sourced road distance to Delhi, Agra or Mathura. Check a live route before planning regular weekend use.
Record history and naming
The district was created in 2008 from Etah and was first named Kanshi Ram Nagar. Older papers may show either name, so confirm the tehsil and Sub-Registrar.
Standard UP checks
The 12.5-acre purchase limit under section 89(2) of the Revenue Code (UP Revenue Code, text hosted by IGRS UP), the SC/ST transfer rules and the NRI bar on agricultural land (RBI, updated September 2022) apply in full; see the state page.
Who to contact
Local revenue & registration offices
Mutation, khatauni and land-use questions route through the Tehsildar and SDM office of the relevant tehsil (Kasganj, Patiyali or Sahawar), and records are on UP Bhulekh. Sale-deed registration is handled by the local Sub-Registrar through IGRSUP, where circle rates can be checked; we did not open either portal for this page. A 2026 amendment changed the section 80 route inside notified development and industrial areas (PRS). Flood and river-channel questions go to the Irrigation Department. Office details are on the Kasganj district website.
KEEP EXPLORING
Explore more areas
Other districts in Uttar Pradesh
- Agra
- Aligarh
- Allahabad
- Ambedkar Nagar
- Amethi
- Auraiya
- Azamgarh
- Bagpat
- Bahraich
- Ballia
- Balrampur
- Banda
- Barabanki
- Bareilly
- Basti
- Bijnor
- Budaun
- Bulandshahr
- Chandauli
- Chitrakoot
- Deoria
- Etah
- Etawah
- Faizabad
- Farrukhabad
- Fatehpur
- Firozabad
- Gautam Buddha NagarResidential (R-Zone) • 1 listing
- Ghaziabad
- Ghazipur
- Gonda
- Gorakhpur
- Hamirpur
- HapurResidential Plotted • 2 listings
- Hardoi
- Hathras
- Jalaun
- Jaunpur
- Jhansi
- Jyotiba Phule Nagar
- Kannauj
- Kanpur Dehat
- Kanpur Nagar
- Kaushambi
- Kheri
- Kushinagar
- Lalitpur
- Lucknow
- Maharajganj
- Mahoba
- Mainpuri
- MathuraAgricultural Land • 1 listing
- Mau
- Meerut
- Mirzapur
- Moradabad
- Muzaffarnagar
- Pilibhit
- Pratapgarh
- Raebareli
- Rampur
- SaharanpurPremium Estate • 1 listing
- Sambhal
- Sant Kabir Nagar
- Sant Ravidas Nagar
- Shahjahanpur
- Shamli
- Shrawasti
- Siddharthnagar
- Sitapur
- Sonbhadra
- Sultanpur
- Unnao
- Varanasi
Guides & research
- Bhu Naksha UP: Check Village Land Map Online (2026 Guide)Wiki · P02 Land Records & Documentation
- Khatauni Nakal UP: Get a Copy Online or at the Tehsil (2026 Guide)Wiki · P02 Land Records & Documentation
- Khasra Khatauni UP: How to Check and Read It Online (2026 Guide)Wiki · P02 Land Records & Documentation
- IGRS UP Encumbrance Certificate: Apply, Track and Download (2026 Guide)Wiki · P02 Land Records & Documentation
- Dakhil Kharij Status UP: Check Mutation Online (2026 Guide)Wiki · P02 Land Records & Documentation
- Circle Rate Uttar Pradesh: Check Land Rates Online (2026 Guide)Wiki · P02 Land Records & Documentation
- Property Tax for Land in Uttar Pradesh: Check and Pay Online (2026 Guide)Wiki · P02 Land Records & Documentation
- Bigha in Uttar Pradesh: District-wise VariationsWiki · P01 Land Measurement Units
COMMON QUESTIONS
Frequently asked questions
Everything buyers, NRIs and investors ask before their first reviewed farmland purchase in Kasganj.
Visit full wiki01 of 04
What is the land rate in Kasganj?
We publish no per-acre band. Two listing sites disagreed by up to ten times and neither could be traced to registered deeds, and we found no official or news series. Check the village circle rate with the Sub-Registrar or IGRS UP and collect registered sale deeds for the same village.
02 of 04
Is a highway being built through Kasganj?
Yes. A 228 km Mathura–Bareilly four-lane NHAI project is reported to run through Kasganj, with Hathras–Kasganj and Kasganj–Budaun sections, at about Rs 7,700 crore and completion expected at the end of 2027 (News24, May 2025; UP Chauraha, December 2025). Reports differ on progress.
03 of 04
What is Soron known for?
Soron is a pilgrimage town. The state declared the Soron Sukar area a pilgrimage site on 28 October 2021 (Drishti IAS), and the district portal links it to the Varaha incarnation and names the Margshirsh Ekadashi fair as very famous.
04 of 04
What do farmers grow in Kasganj?
ICAR-CRIDA's district plan lists wheat on about 95,800 hectares, bajra on 36,100, maize on 30,300 and rice on 16,000 (2011-12), with a cropping intensity of 149%. About 10% of the soil is saline-alkaline.
Ready to look at what is available?
Browse reviewed listingsTransparency
Sources and references
Law and courts
- UP Revenue Code 2006, section 80, India Code
- UP Revenue Code 2006, text hosted by IGRS UP (section 89(2))
- Revenue Code (Fourth Amendment) Ordinance 2026, PRS
- RBI Master Direction FED 12/2015-16, updated 1 Sep 2022
Government
- Kasganj district portal: about the district
- Kasganj district portal: home page
- Kasganj district portal: history
- Kasganj district portal: culture and heritage
- District agriculture contingency plan, Kasganj, ICAR-CRIDA (2011-12 crop data)
- Groundwater resources and quality of Uttar Pradesh, CGWB, Dec 2024
News
- Agra to Bareilly expressway, News24, 19 May 2025
- Bareilly-Mathura-Agra highway to be ready by end of 2027, UP Chauraha, 18 Dec 2025
- Agra Bareilly Expressway project profile, Blackridge Research
- Soron Sukar area declared pilgrimage site, Drishti IAS, Oct 2021
- UP govt to revise land circle rates, PTI via The Week, 10 Mar 2025
- UP Cabinet clears ordinance on land use conversion, Free Press Journal, 23 Mar 2026
- Revenue Code (Amendment) Act 2026, TeamLease RegTech, Aug 2026
Further reading
- UP Revenue Code 2006 full text
- Oswal Fats and Oils v Additional Commissioner, Supreme Court, 2010
- State of UP v Suresh Chandra Tewari, Supreme Court, Dec 2024
- Uttar Pradesh ushers in reform in land and revenue laws, SCC Online, 2016
- CGWB Uttar Pradesh groundwater assessment 2024
- CGWB 2023 assessment, January 2024
- Groundwater and crops in Uttar Pradesh, Down To Earth, January 2025
- Macro and Fiscal Landscape of Uttar Pradesh, NITI Aayog, July 2025
- ICAR-CRIDA plan, Kasganj
- Mathura-Bareilly highway, December 2025
Internal guides
Data-currency note: the population figure on the district portal gives no census year, ICAR-CRIDA crop areas are for 2011-12, and the CGWB assessment is a state-level document. Highway progress is as reported in 2025 and reports differ. No listing-site prices are used, and this is a general guide, not legal advice. Report inaccuracies to wiki@farmlandindia.com.
For developers
Ready to explore Kasganj farmland?
Browse reviewed projects and individual land parcels across Kasganj — or if you own land here, list it with platform review and reach serious buyers.